Loading...
2019.01.03_COD_FollowUp i Gas Well Inspection Type 2018 Annual COF I n s p e ct i o n s Inspection Cycle 2nd Half _ DENTOR 24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 10-26-18 Record Close Date 10-26-18 Active Padsite Name 105 Cole Trust South 15 Jurisdiction CoD Lnc Re-Inspection Date 11-29-18 Site Address 8333 FM 2449 Padsite Type Multi Well Rt 07 2nd Follow-up Inspection Ordinance Reg 2005-223 Rod Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Aai No. Spud Date Imoact 1108-0347 GWP02-0025 COLE TRUSTS 576"A"18 224567 12132810 4/5/2006 Low 1108-0345 GWP02-0025 COLE TRUSTS 576"A"20 223310 12132830 4/23/2006 Low INSPECTION CHECK LIST Signs/Labels General Location Operator Name • Good Need Resolved Fencing • Good Need Resolved Site Address • Good Need Resolved Entry Gate Locked • Good Need Resolved Well Name • Good Need Resolved Site Surface • Good Need Resolved 24hr.Phone No • Good Need Resolved Stains • Good Need Resolved RRC&Api No • Good Need Resolved Trash/Debris • Good Need Resolved No Smoking • Good Need Resolved Weeds/Brush • Good Need Resolved Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved Wellhead Sign • Good Need Resolved Site Lighting • Good Need Resolved Tank Battery Sign • Good Need Resolved Landscaping • Good Need Resolved Storage Tank Labels • Good Need Resolved Erosion Control • Good Need Resolved Facility Equipment Miscellaneous Wellhead Paint • Good Need Resolved Electric Lines Safe • Good Need Resolved Wellhead Leaks • Good Need Resolved Pipeline Markers • Good Need Resolved Tank Battery Paint • Good Need Resolved Layout per Site Plan • Good Need Resolved Tank Battery Leaks • Good Need Resolved Tank Integrity • Good Need Resolved No Wells Approved 5 Db Level @ Inspection Containment Integrity • Good Need Resolved Fire Dept. Drip Pots@ Load • Good Need Resolved Lightning Arresting • Good Need Resolved Fire Lane Access Referred Tank Level Activated Referred Equip Height • Good Need Resolved Foam Lines Referred Pit Fencing Referred Accessible ESD Referred Auto Safety Valve Referred Inspection Comments Workover in progress during inspection.Wells were shutin and all equipment was bled off. Will conduct leak detection during the Post- Workover inspection. No other issues were observed. On 11/29/18, RW conducted a post workover inspection and leak detection. No —issues observed