Loading...
2020.02.25_COD_FollowUp Gas Well Inspection Type 2019 Annual C0F Inspections Inspection Cycle 2nd Half DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 11-5-19 Record Close Date 2-24-20 Active Padsite Name 34 SMITH-YORLUM UNIT Jurisdiction CoD Re-Inspection Date 12-9-19 Site Address 1757 Old Dominion Rd. Padsite Type Single Well Rt 11 2nd Follow-up Inspection 1-27-20 Ordinance Reg 2002-040 Rod Weatherby Inspected by Y Inspection Status Closed Plat/Site Permit No _ Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1109-0252 GWP03-0015 SMITH-YORLUM UNIT 3H 197262 12131977 7/3/2003 Moderate INSPECTION CHECK LIST Signs/Labels General Location Operator Name • Good Need Resolved Fencing • Good Need Resolved , Site Address • Good Need Resolved Entry Gate Locked • Good Need Resolved Well Name Good Need • Resolved Site Surface • Good Need Resolved 24hr.Phone No • Good Need Resolved Stains • Good Need Resolved RRC&Api No • Good Need Resolved Trash/Debris • Good Need Resolved No Smoking • Good Need Resolved Weeds/Brush • Good Need Resolved Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved Wellhead Sign Good Need Resolved Site Lighting • Good Need Resolved Tank Battery Good Need Resolved Landscaping • Good Need Resolved Storage Tank Labels Good Need Resolved Erosion Control • Good Need Resolved Facility Equipment Miscellaneous Wellhead Paint • Good Need Resolved Electric Lines Safe • Good Need Resolved Wellhead Leaks • Good Need Resolved Pipeline Markers • Good Need Resolved Tank Battery Paint • Good Need Resolved Layout per Site Plan • Good Need Resolved Tank Battery Leaks Good Need • Resolved Tank Integrity Good Need • Resolved No Wells Approved Db Level @ Inspection Containment Integrity • Good Need Resolved COD Comments-3rd Party Inspections Drip Pots@ Load • Good Need Resolved Lightning Arresting • Good Need Resolved Equip Height • Good Need Resolved Inspection Comments A Entrance sign needs well name.-Tank 1,Seep leaking needs repair,Thief hatches need maintenance.DV Controller at Sep venting(red flag). On,11/5/19,RW inspected well.All inspection items were documented on the Inspection Checklist and Operator was notified of issues requiring action.On 12/9/19, RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were not yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted. on 1/27/19,RW conducted a 2"d follow-up inspection of the well site. All items requiring further attention from the Operator were not yet resolved.On 2/24/20,RW received an email with pictures showing the issues with the entrance sign were resolved