Loading...
040320 Friday Staff Report City Manager's Office 215 E. McKinney St., Denton, TX 76201 • (940) 349-8307 DENTON MEMORANDUM DATE: April 3, 2020 TO: The Honorable Mayor Watts and Council Members FROM: Todd Hileman, City Manager SUBJECT: Friday Staff Report L Council Schedule A. Meetings 1. Cancelled - City Council Luncheon on Monday, April 6, 2020 at 11:30 a.m. in the City Council Work Session Room. 2. Cancelled-Committee on the Environment Meeting on Monday,April 6,2020 at 1:30 p.m. in the City Council Work Session Room. 3. Cancelled - Traffic Safety Commission Meeting on, Monday, April 6, 2020 at 5:30 p.m. in the City Council Work Session Room. 4. City Council Meeting on Tuesday, April 7, 2020. Closed Session Meeting begins at 3:30 p.m. followed by a Work Session meeting at 4:30 p.m. followed by a Regular meeting at 6:30 p.m. via video/teleconference — City Council Work Session Room. 5. Cancelled - Audit/Finance Committee Meeting on Tuesday, April 7, 2020 at 10:30 a.m. in the City Hall Conference Room. 6. Cancelled— Committee on Citizen Engagement on Tuesday, April 7, 2020 at 10:30 a.m. in the City Hall Conference Room. 7. Cancelled - Economic Development Partnership Board on Wednesday, April 8, 2020 at 11:00 a.m. in the City Council Work Session Room. 8. Cancelled - Agenda Committee Meeting Wednesday, April 8, 2020 at 2:30 p.m. in the City Manager's Conference Room. 9. Planning and Zoning Commission Regular Meeting on Wednesday, April 8, 2020 at 6:30 p.m.via video/teleconference—City Council Work Session Room. OUR CORE VALUES Integrity • Fiscal Responsibility • Transparency • Outstanding Customer Service 10. Cancelled - Hotel Occupancy Tax and Sponsorship Committee on Thursday, April 9, 2020 at 1:00 p.m. in the City Council Work Session Room. II. General Information & Status Update A. Pending Council Requests Work Session Tonics — There are NO items scheduled for discussion during the April 7 City Council work session. Staff contact: Rachel Balthrop Mendoza, City Manager's Office B. Texas Workforce Commission Implements Staggered Call and Access System — The Texas Workforce Commission (TWC) has announced, effective immediately, that Texas should use their area code and the recommended call and access times chart below to find their proposed call and access times to help reduce wait times and technical issues that have resulted from the overwhelmed systems. As a reminder, claimants are not penalized for a delay due to call or user volume. Claims for individuals are eligible to be backdated. Read the full announcement here. Staff contact: Jessica Rogers, Economic Development Recommended Call and Access Times Area Code of Applicant Suggested Call Time Area Codes Beginning with 9 Mon-Wed-Fri 8:00 a.m.-Noon Area Codes Beginning with 3. 4, 5,6 Mon-Wed-Fri 1:00 p-m.-5:00 p.m. Area codes Beginning with 7, 8 Tues-Thurs-Sat 8:00 a.m.-Noon Area codes Beginning with 2 Tues-Thurs-Sat 1:00 p.m.-5:00 p.m. C. Denton Municipal Landfill Only Accepting Card Payment —In an effort to protect the health and safety of landfill customers and staff, the weigh station at the landfill will only accept credit and debit card payment. This change will go into effect Monday, April 6 and will remain until COVID-19 precautions are no longer needed. Alongside this safety precaution, the weigh station has implemented a new process that eliminates the need to handle driver's licenses, allowing staff to care for customers and conduct business in a safe and healthy manner. This temporary payment policy has been communicated to customers through the Solid Waste and Recycling social media channels, shared on the Landfill webpage, and included in the City of Denton Department FAQs listed on the COVID-19 webpage. Staff contact: James Tips, Solid Waste and Recycling D. Bureau of Labor Statistics Releases March 2020 Employment Situation Report — The U.S.Bureau of Labor Statistics has released its Employment Situation report for March 2020. In summary, total nonfarm employment fell by 701,000 and the overall unemployment rate rose 0.9 percent points and ended the month at 4.4 percent. The 41- page report is available here. Page 5 of the report includes details related to how the report was impacted by the ongoing COVID-19 pandemic (a key aspect of this is that the survey data predates many of the COVID-19 closures). Some key takeaways include: 2 • This is the largest month-over-month increase in the rate since January 1975. • The number of unemployed persons rose by 1.4 million to close at 7.1 million in March. • The number of unemployed persons who reported being on temporary layoff more than doubled in March to 1.8 million. • The number of permanent job losers increased by 177,000 to 1.5 million. State and local data will be released later in April. Staff contact: Jessica Rogers, Economic Development E. Broadband Internet in the Preserve at Pecan Creek Neighborhood—On Thursday,April 2, Mayor Watts and staff from the City Manager's Office held a conference call with a representative from the Preserve at Pecan Creek neighborhood that currently lacks high-speed internet service. This section of the Preserve contains approximately 13-15 homes, and the resident reported that they are making progress with a provider to have service extended to the neighborhood. Staff is continuing to work with the neighborhood and providers as they continue to move forward. Staff contact: Mario Canizares, City Manager's Office F. Police Department Headquarters Facade—During the March 30 City Council meeting, Council members requested an itemized cost of safety, construction, and other upgrade items that were included in the fagade estimates for the Police Department Headquarters proposal. These items are listed below: Safety Items • Glazing at 40%of elevations,triple pane argon filled storefront glass: $236,194 • Add for ballistic glazing at 20% of elevation: $189,317 • Total Safety items: $425, 511 Other Upgrade Items • Natural Stone at 30%: $91,351 • New tower construction with stone cap and star logo: $174, 255 • Two color stone plaster and brick veneer: $72,784 • Foam insulation: $17,247 • Prefabricated Canopy at entrance: $39,060 • Prefabricated Canopy at Facade: $108,500 • Demolition of existing fagade, prep work, saw cutting, and headers for glazing: $69,310. • Total for Other Upgrades: $572,507 Direct Construction Cost • Design, estimating, overhead, insurance, builders risk insurance, escalation and preconstruction services: $262,130 Total Cost: $1,260,148 (this total was rounded to $1.3 million in the presentation) Per Council's request, staff are working with the architect to design two to three alternatives that incorporate the existing arched canopy, reduces the overall cost, and 3 also includes other safety measures and features. Staff contact: Sara Hensley, City Manager's Office G. Denton Municipal Electric (DME) Recognized for Reliable Electric Service to the Community — Denton Municipal Electric has received national recognition for achieving exceptional electric reliability in 2019. The recognition comes from the American Public Power Association, a trade group that represents more than 2,000 not- for-profit, community-owned electric utilities. The Association helps electric utilities track power outage and restoration data through its subscription-based eReliability Tracker service and then compares the data to national statistics tracked by the U.S. Energy Information Administration for all types of electric utilities. The achievement is, in part, due to DME's annual average outage time of 51 minutes, compared to the average for all U.S. electric utilities of 143 minutes. Another performance indicator is the Average System Availability Index. This index tracks how long the system is available to people annually, and DME prides itself of having a 99.9% index rating. Staff contact: Chris Lutrick, DME H. Closing Open Courts in Parks—The Parks and Recreation Department closed all open courts in the parks on March 26. However, after realizing that many park patrons were still using them, and not socially distancing, Park Maintenance started removing volleyball nets, tennis nets, closing entrances to courts, and boarding up the basketball goals (as seen below). This task was completed April 1. Staff contact: Drew Huffinan, Parks and Recreation 1 M h Rapti 4> I. Denton Parks Foundation Home Hop Egg Drop — After canceling the Adult Egg Scramble, Denton Parks Foundation(DPF)has decided to use the 2,000 eggs that were purchased in a new, socially distant manner. Households can order eggs to be delivered to their front porch by the Easter Bunny. Orders begin at $20 for 20 eggs and go to $100 for 100 eggs. Each egg has two pieces of candy inside. Orders must be placed on the DPF website by Today, Friday, April 3. Staff contact: Brooke Moore,Denton Parks Foundation via Gary Packan, Parks and Recreation 4 J. Recreational Vehicles Allowed on City Streets — On March 29, Council Member Armintor forwarded a resident concern about dirt bikes, go-carts, and other recreational vehicles that were being driven on City streets. Four-wheelers and go-carts(depending on how they are built)would be defined in the Transportation Code(Chapter 551A) as an "All-terrain vehicle" or "Recreational Off-Highway Vehicle". Section 551A.053 states that a municipality may allow an operator to operate an all-terrain or "off- highway vehicle" on certain roadways within the municipality, but since Denton has not done that, it would be illegal to operate one on a Denton roadway. "Dirt bikes" can be street legal if they are equipped with headlights, tail lights, brake lights, a rear-view mirror, a horn, approved tires, and any other equipment required by Chapter 547.To be operated on the roadway,the owner would also need to have a Class M driver's license, register the motorcycle, affix a license plate, and maintain valid insurance on the bike. Staff contact: Stuart Birdseye, City Manager's Office K. Water Leak — On April 1, Council Member Briggs forwarded a resident request regarding a potential water leak at the intersection of Nottingham Dr. and Devonshire Ct., near the entrance to Avondale Park. Staff investigated the intersection that afternoon and determined that there is a leak in the area. This has been placed on the leak repair schedule, and will be prioritized based on the severity of the leak. Staff contact: Becky Diviney, Water Utilities III. Upcoming Community Events and Meetings A. Events All City-sponsored events and programs are also suspended through Monday, May 4, or until further notice. Certain areas of Parks and Recreation facilities will also be closed through Monday, May 4, or until further notice, such as gymnasiums, fitness areas,meeting rooms, and the walking track at the Denton Civic Center. Signs will be posted at these facilities. As conditions change, these periods may be extended, and additional announcements may be made. B. Community Meetings All City-sponsored events and programs are also suspended through Monday, May 4, or until further notice. Certain areas of Parks and Recreation facilities will also be closed through Monday, May 4, or until further notice, such as gymnasiums, fitness areas,meeting rooms, and the walking track at the Denton Civic Center. Signs will be posted at these facilities. As conditions change, these periods may be extended, and additional announcements may be made. IV. Attachments None V. Informal Staff Reports None 5 VI. Council Information A. Council Requests for Information ......................................................................7 B. Council Calendar ...............................................................................................8 C. Future Work Session Items ..............................................................................11 D. Street Construction Report ...............................................................................12 6 Council Requests for Information Council Member Requestor Datj' Summary of Request Staff Assigned Department Comments 1 Council Member Meltzer 01/13/20 Will staff prepare a report detailing the total amounts of PM 10 and PM Banks Request will be presented during an upcoming Pending 2.5 emissions currently allowed by permit to entities in the City? Request work session Council Member Briggs 02/03/20 Would like to request council discuss a citywide public health study. Mendoza City Manager's Office Request will be presented during a future Pending 2 http://www.austintexas.gov/sites/defaulVfiles/files/Health/Info_to_PosVHe Request work session althKeport-linked.pdt Like this Council Member Armintor 02/09/20 (1)Can staff explore the possibility of a temporary restriction on parking Estes Capital Projects Request will be presented during an upcoming Pending on the mailbox side of Lattimore until sidewalks can be constructed on Request work session that side of the street? Even with the USPS door delivery option for seniors and people with disabilities,until sidewalks can be constructed 3 the best option for general neighborhood accessibility for residents with disabilities and senior residents might be restricting parking on one side (indicated with paint). (2)Can someone please let me know which other residential Denton streets besides Lattimore are lacking both sidewalks and USPS door service (i.e.lacking both at the same time,not just one or the other)? 4 Council Member Briggs 02/22/20 Will staff look into crosswalk concern at Montecito near White Dove? Estes Capital Projects Information will be provided in future Friday Report 5 Council Member Briggs 03/02/20 How many developments do we have left that fall under our old tree McDonald Development Services Request will be presented during a future Pending rMM code Request work session 6 Council Member Briggs 03/03/20 Can staff follow up on the stop sign request on Ryan Road at the Jahn Capital Projects Information will be provided in future Friday Report entrance to the Good Samaritan Village? 7 Council Member Armintor 03/03/20 Would like a work session on passing an"Engine Braking Prohibited" Kuechler City Manager's Office Request will be presented during a future Pending ordinance in Denton. Request work session 8 Mayor Pro Tern Hudspeth 03/06/20 Can staff look at the school zone area on Glenwood Lane near Windsor? Jahn Capital Projects Information will be provided in future Friday Report 9 Council Member Briggs 03/26/20 Does staff need to do anything to follow up on citizen request to TxDOT Deshmukh Capital Projects Information will be provided in future Friday Report regarding 1-35E service road at US 77? Council Member Briggs 03/26/20 The new turn from northbound Mayhill to Mills Road is too tight for buses Estes Capital Projects Information will be provided in future Friday Report 10 so they cannot use that route to access the bus lot.They have to go around a different way.Can staff look into addressing this? Council Member Davis 03/27/20 Construction Vehicles on Malone/Ector.Can staff please look into Estes Capital Projects Information will be provided in future Friday Report 11 reports that our road construction contractors'vehicles are speeding down Ector St.Potentially Malone St.as well?Thanks! 12 Council Member Briggs 03/27/20 Can staff give background on the zoning of the Green Belt Business Cannone Development Services Information will be provided in future Friday Report Park on US 380? 13 Council Member Armintor 03/29/20 Will staff clarify as to the legality of riding dirt bikes,go-carts,and four- Dixon PD Information will be provided in the April 3 Friday Report wheelers down Denton city streets? 14 Council Member Briggs 04/01/20 Can staff check on a leak at the intersection of Nottingham and Diviney Water Utilities Information will be provided in the April 3 Friday Report Devonshire Ct.? 7 April 2020 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 Cancelled -2:30pm Cancelled-8:30DEDC Agenda Committee Cancelled-4:00Public Art Committee 5 6 7 8 9 10 11 CANCE1r>n-11:30 am Council Meeting CANCEIIED-11:00EDPB Cancelled HOT&S Council Lunche on 3:30pm Closed CANCELLED-COE 1:30 4:30pm Work Session CANCELLED-2:30pm �'�� CANCELLED-Traffic 6:30 Regular Agenda Committee Safety Commission CANCEUED-Audit/Finn,., 10 30 5:30 pm r\NCE[IID-COCE 10:30 6:30pmP&Z Regular Session 12 13 14 15 16 17 18 PUB 9am 2:00 pm 2nd Tuesday 2:30pm Agenda 6:00pmCommittee on Session Committee Persons With Disabilities Mobility Committee HABSCO 4pm Meeting 9:00 am 19 20 21 22 23 24 25 2:00 pm CC Work 2:30pm Agenda Session Committee 6:30 pm CC Regular 5:00pmP&ZWorkSession Session 6:30pm P&Z Regular Session 26 27 28 29 30 PUB 9am loam Council Airport 2:30pm Agenda CANCELLED - ZBA 5:30pm Committee Committee 5:30PM Board of 2:00 pm 4th Tuesday Ethics Session 8 May 2020 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 PUB gam 2:00 pm CC Work 2:30pm Agenda 8:30DEDC 11:30 am Council Session Committee 4:00 Public Art Committee luncheon 6:30 pm CC Regular 5:00pmP&ZWorkSession COE 1:30 Session 6:30pm P&ZRegular Session Traffic Safety Commission 5:30 pm 10 11 12 13 14 15 16 4:00 pm CC Election 11:00IDPB Reception/ Meeting 5:30 Airport Advisory Board HOT Committee Mobility Committee 1 pm Meeting 9:00 am 17 18 19 20 21 22 23 PUB 9am 2:00 pm CC Work 2:30pm Agenda 6:00pmCommittee on ZBA5:30pm Session Committee Persons Aithasabilities 6:30 pm CC Regular 5:00pmP&ZWorkSession HABSCO 4pm Session 6:30pm P&Z Regular Session 24 25 26 27 ' 28 29 30 Memorial Day 10am CouncilAiport 12:00 TY Board(TIR4 5:30PM Board of Holiday Committee Ethics No CounciiMeeting 2:30pm Agenda Committee 31 9 June 2020 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 11:30 am Council 2:00 pm CC Work 2:30pm Agenda 8:30DEDC Luncheon Session Committee 4:OO Public Art Committee 6:30 pm CC Regular 5:00pmP&ZWorkSession COE 1:30 Session 6:30pm P&Z Regular Ses s ion Traffic Safety Commission 5:30 pm 7 8 9 10 11 12 13 PUB 9am 2:00 pm 2nd Tuesday 11:00 EDPB Session 2:30pm Agenda Mobility Committee Committee Meeting 9:00 am 5:30 Airport Advisory Board 14 15 16 17 18 19 20 2:00 pm CC Work 5:00pmP&ZWorkSession HOT&S 9:00 Session 6:30pm P&Z Regular Session 6:00pmCommitteeon 6:30 pm CC Regular Persons with Dis abilities Session HABSCO 4pm 21 22 23 24 I25 26 27 PUB 9am loam Council Airport HOT&S 9:00 Committee 5:30PM Board of 2:00 pm 4th Tuesday Ethics Session 28 29 30 ZBA 5:30pm No Council Meeting 10 FUTURE WORK SESSION ITEMS MATRIX As of April 2,2020 Meeting Date Currently Slated Work Session Items 24-Mar CANCELLED Public Safety Substation Review of Council 3/31/2020 COVID-19 Update &Firing Range Requests Apr 21 Special Called 20-733 20-697 20-010 6-Apr Lunch CANCELLED Review of Council COVID-19 Update Requests Apr 21 7-Apr 20-769 20-174 14-Apr CANCELLED FY 19-20 Budget,CIP,&5 Denton Development Review of Council COVID-19 Update Year Forecasst Code Amendments Requests Apr 21 21-Apr 20-771 Green Tree Estates 20-806 DCA20-0001 20-176 Review of Council COVID-19 Update Requests Apr 28 28-Apr 20-772 DTV Public Meetings 20-177 4-May Lunch @ 11:30 a.m. CIP Update Internal Audit/Capital Internal Audit/Capital Proj.Admin.-Planning& Proj.Admin.-Property 2020 Mobility Plan Review of Council EV Charger Upgrade Design Acquisition 2019-20 Audit Plan SB.2 Budget Implications Update? Requests May 05 5-May 20-732 20-729 20-730 20-731 20-582 20-245 20-458 Review of Council Requests May 19 12-May 20459 Drop-off Recycling Review of Council Center Requests May 19 19-May 20-768 20-460 26-May No meeting;Day after Memoral Day Holiday Accessory Dwelling Doorbell Monitoring Review of Council Units,and Screening Technology Construction Code Requests June 02 C DCA19-0011 Delegated Authority 19-2959 Stormwater Master Plan Review(TBD) 20-671 C f6 a N m Ethics Ordinance Review of Council !r Group Home Code Purchasing Manual Right of Way Ordinance Changes Requests June 09 C Amendment Public Art Update Follow-up TBD 20-672 (A f6 � Q Denton Development Review of Council LA Y Municipal Broadband Code Amendments Urban Forest Master Plan Sustainability Plan Requests June 16 i 20-556 (Cont'd) 20-426 20-521 Plugged Gas Wells 20-673 O Review of Council Library Master Plan TIF Grants for Requests June 23 20-526 Accessibility 20-674 Work Session Requests Community Public Art Veteran Source of Determined by Council and Community Tree Ethics Ordinance Small Cell Lawsuit Income Housing Date TBD Grants Revision Participation Tree Ordinance Review Discrimination Ordinance 11 Street Closure Report IMPROVING 4,ry i )FN1�� % 1 �F Upcoming Closures DENTON Week of April 6,2020-April 12,2020 Street/intersection Fromoff Closure Closure Description Department Upcoming Public Other Department Start Date End Date Info/Notes Meeting Communication Contact 135E northbound service 500 ft west Wastewater Improvements road located of Bonnie TBD TBD (Temporary Lane Closures) Wastewater (940)349-8909 Brae Curb and Gutter Repair.The process starts with Barricading the failed sections of,Curb and Pembrooke Chasewood Long Ridge 04/20/20 05/22/20 Gutter remove and install Streets N/A (940)349-7146 Curbs. Also Mill and Overlay section of Street that was impacted with the curb repair. Robson East Side of 35W TBD TBD Wastewater Main Install Wastewater (940)349-8909 RR (Temporary Lane Closure) Rockwood Ln. Royal Mistywood TBD TBD bundle Engineering this will be part of bundle Door Hangers Drainage and Roadway Roselawn Dr. Bonnie Brae Kansas City TBD TBD Construction Engineering Part of Bonnie Brae Ph.1 (940)349-8910 Southern RR Bonnie Brae Phase 1 Capital Project (One Lane traffic control) Royal Ln. Royal Rockwood TBD TBD bundle Engineering this will be part of bundle Thomas St. Panhandle Oak TBD TBD Streets Construction Capital Projects Part of 2019 Street (940)349-7104 Bundle Total 5 Upcoming Closures 12 Street Closure Report IMPROVING Current Closures F)FNI7(cc)I Week of April 6,2020-April 12,2020 N1 Street/Intersection Closure Closure Description Department Upcoming Public Other Department All Start Date End Date 0 Info/Notes Meeting Communication Contact Concrete Street panel and Sidewalk repair. The process Spring starts with barricading the failed Bent Creek Kappwood Creek 01/06/20 04/10/20 sections of concrete pavement, Streets N/A (940)349-7146 remove the pavement and subgrade,and install new concrete pavement. Concrete Sidewalk Repair. The process starts with Broken Arrow Dunes Old 03/09/20 03/17/20 Barricading the failed Streets Project on hold due to N, (940)349-7146 Orchard sections of concrete COVID-19 sidewalk,remove,and install new concrete. Woodland Wastewater collections will be Project on hold due to Brown Dr Roberts St St 02/10/20 03/17/20 installing a new wastewater Wastewater COVID-19 N/A (940)349-8909 main line and services Woodland Northwood Wastewater collections will be Project on hold due to Cherrywood Ln St Tr 02/10/20 03/17/20 installing a new wastewater Wastewater COVID-19 N/A (940)349-8909 main line and services 3201 Private Development:Drainage, Public Works Colorado Blvd Brinker Rd Colorado 02/17/20 04/13/20 Water,Sanitary Sewer,and Inspections, NextDoor,Direct (940)205-9230 Blvd Pavement for Fire Station#8 Private business contact Development Concrete Curb and Sidewalk Repair.The process starts Dunes St Broken Old 03/02/20 03/17/20 with Barricading the failed Streets Project on hold due to N/A (940)349-7146 Arrow Orchard sections of concrete and, COVID-19 remove,and install new concrete. Eagle Elm Locust 03/30/20 04/27/20 PEC 4 1&2 Drainage and Engineering NextDoor,N/A (940)349-8938 Utility Improvements Current Closures 13 Street/Intersection From To Closure Closure Description Department Upcomin Public Other Department Start Date End Date Info/Notes Meeting Communication Contact 3126/20-Contractor delayed for 2 weeks. Part of Downtown TIF Sidewalk&Lighting CIP- Elm St. Oak Parkway 09/23/19 04/18/20 Sidewalk Improvements Engineering Temporary lane and (940)349-8425 shoulder closures due to sidewalk reconstruction. Schedule delayed due to significant weather impacts and traffic signal relocations at McKinney. "LY Watch TXDOT message FM 2181 Denton/Cori Lillian Miller 11/18/19 TBD Street Widening TxDOT boards for local street (940)349-8425 nth City closure updates. Ana Site Construction: Public Works Hickory Inspections, FM 2499 Pine Hills Creek Rd 03/27/20 05/01/20 Private NextDoor (940)205-9230 Water and Sewer Bore FM2499 Development Wastewater main replacement. Projects extents,Emerson from Emerson Circle to Foxcroft. Project on hold due to Foxcroft Emerson Emerson 01/30/20 03/17/20 Emerson Circle from Emerson Wastewater COVID-19 N/A (940)349-8909 to End Foxcroft from Emerson to Northcrest Foxcroft from Old North to Emerson Water Distribution will be Project on hold due to Foxcroft Cir Emerson Ln Emerson Ln 03/09/20 03/17/20 replacing the water main and Water COVID-19 N/A (940)349-7278 water services. Ft.Worth Dr.(US 377) IH 35E Mission St 10/17/19 11/27/20 Infrastructure Safety Upgrades TxDOT (940)349-8938 (temporary closures) 0.26 mi Street Widening Ft.Worth Dr.(US 377) IH 35E south of FM 12/03/18 12/12/20 (Temporary Lane Closures TxDOT 10/08/19 (940)387-1414 1830 during non-peak traffic) Intersection back of Intermittent closures of this NextDoor,Email Hidden Meadows Trail with Vintage Vintage blvd 03/16/20 04/17/20 intersection for construction Engineering (940)349-8938 Blvd right of way activities Notification Country Paving connection at FM1830 Engineering, NextDoor,Message Hobson Club Forest Ridge 04/06/20 04/20/20 as part of the TxDOT 377 TxDOT Boards (940)349-8938 project. Water Distribution will be Longridge Tennyson Project on hold due to Hollyhill Ln Dr Trl 03/06/20 03/17/20 replacing the water main and Water COVID-19 N/A (940)349-7278 water services. Current Closures 14 Street/Intersection From To Closure Closure Descriptio Department Upcoming Public Other Department Start Date End Date Info/Notes Meeting Communication Contact Construction is continuing thru COVID-19.Please respect workers efforts in the field and always maintain social distancing. 4/1/20 John Paine closure to set John Paine up on 04/13/2020 thru 4/17/20. Southwest Road at 3/25/20 John Paine closure to John Paine Road Pump John Paine 01/06/20 05/31/20 set up on 04/13/2020. Notices Water NextDoor (940)349-8925 Station Road near will be released the week before IH 35W closure. John Paine Road will be closed as needed. Project includes installation of water main along Old John Paine and Allred Road between the Southwest Pump Station on John Paine Road near Parkplace Dr.on and South Bonnie Brae St. 3/25/20 Construction is continuing thru COVID-19. Please respect workers efforts in the field and always maintain social distancing. John Paine Just west of Johnson Lane Road first 01/06/20 05/31/20 Road closure is for the Water NextDoor (940)349-8925 driveway installation of new water main along Old John Paine Rd.and Allred Rd.between the Southwest Pump Station on John Paine Rd.near Parkplace Dr.and South Bonnie Brae St. Atmos Energy is relocating/ Direct business contact, Daughtery replacing existing gas mains Atmos Energy to Johnson Street;Smith Street Dallas Drive Street,at S 04/06/20 07/31/20 and services for upcoming Atmos distribute door hangers, (940)268-7285 Locust reconstruction of Smith Street; place sign boards,and Street including gas main crossing notify residents in Johnson Street at Smith Street. person Duncan Shady Oaks Project on hold Kerley Street Street Drive 02/05/20 03/17/20 Street Reconstruction Streets temporarily due to (940)349-7146 COVID-19 response Storm drain improvements as Locust St. Warren Ct. Sycamore 03/09/20 04/24/20 part of Pec-4 Ph 1&2 Engineering Direct business contact (940)349-8938 St. Project. West side lane closure. Sewer main improvements,as Locust St. Highland St Eagle Dr 03/09/20 04/27/20 part of Pec-4 Ph 1&2 Engineering Direct business contact (940)349-8938 Project. West side lane closure. Current Closures 15 Street/Intersection From To Closure Closure Description Department Upcomin Public Other Department Start Date End Date Info/Notes Meeting Communication Contact 3/26/20-Contractor Delayed for 2 weeks. Locust St. Oak McKinney 04/13/20 05/15/20 Sidewalk Improvements Engineering Part of Downtown TIF (940)349-8910 Sidewalk&Lighting CIP. Schedule delayed due to weather This project is to install a drive 225 west of approach at the Golden Triangle Engineering, Floyd Smith concrete will Loop 288 Colorado Colorado 03/16/20 05/15/20 Mall as part of the Colorado Floyd Smith resume work on this Direct business contact (940)349-7104 blvd Blvd and Loop 288 intersection Concrete project April 6th 2020. improvements. We will be reconstructing Direct business contact, Masch Branch U S 380 Jim Crystal 02/17/20 04/10/20 Masch Branch from 380 to Jim Streets Door hangers (940)349-7146 Crystal. i,onsirucuon is continuing thru COVID- 19.Please respect workers efforts in the field and always maintain social distancing. 4/1/20-Ultimate Lanes are being opened as roadwork is coming to end. 3/25/20-Additional Lane(s)may open as early as this week. US 380(E. Engineering, 3/18/20-Project Mayhill Rd. University Edwards Rd. 09/01/17 04/30/20 Street Widening(Temporary Traffic,TxDOT, Walkthrus are underway Door Hangers (940)349-8925 Dr.) Lane Closures) CIP and lanes will continue to be closed as needed to facilitate final work. 2/27/20-Expect continued lane closures as project work is winding down. 2/13/20-Traffic switch completed on Thursday 2/13/30 moving remaining northbound traffic(north of McKinney)to the ultimate northbound lanes.Lane closures are still to be expected for k-+F,Alnhhhn„n.l on.V Intersection back of Intermittent closures of this Email Mockernut Rd. with Vintage Vintage 03/16/20 04/17/20 intersection for construction Engineering NextDoor, (940)349-8938 Blvd. Blvd.right of activities. Notification way Current Closures 16 Street/Intersection Mfrom To Closure Closure Description Department Upcoming Public Other Department Start Date End Date Info/Notes Meeting Communication Contact a Public Works N.Bell Ave Texas College 02/28/20 04/10/20 Building out west side of Inspections, NextDoor (940)205-9230 building Private Development Oak St.at Fry St.Signal Intersection Fry 11/04/19 04/10/20 Signal Construction(Intermittent Traffic (940)349-7486 of Lane Closures) Water and Wastewater Main Prairie St. Elm St. Pierce St. 11/04/19 04/10/20 improvements,as part of Pec-4 Engineering (940)349-8938 Ph 1&2 Project. Prairie St.will be closed to thru traffic. Storm drain improvements,as Prairie St. Locust St. Elm St. 03/23/20 06/26/20 part of Pec-4 Ph 1&2 Engineering Direct business contact (940)349-8938 Project. Street closed to thru traffic. Concrete Street Panel Repair. At roundabout Circle.The process starts with Quail Creek Dr. Quail Creek Berry Down 03/16/20 03/17/20 Barricading the failed Streets Project on hold due to N/A (940)349-7146 Dr. Ln. sections of concrete COVID-19 pavement,remove the pavement,and install new concrete. Cherrywood Wastewater collections will be Project on hold due to Roberts St Bell Ave Ln 02/10/20 03/17/20 installing a new wastewater Wastewater COVID-19 N/A (940)349-8909 main line and services. Willowwood Highland Water transmission main Changed per email from Door hangers delivered S.Bonnie Brae St. St. Park Rd. 01/28/20 04/10/20 installation. Street will be Engineering Robin Davis to local residents on (940)349-7112 closed to thru traffic. 1/29/20. Water main improvements Direct business contact, S.Elm St. Prairie St. Eagle 03/16/20 04/27/20 along Elm St.as part of the Pec- Engineering West side lane closure. Door hangers (940)349-8938 4 Ph 1&2 Project. S.Locust St. Warren Ct. Highland St. 12/16/19 04/24/20 Drainage Improvements as part Engineering West side lane closure Direct business contact, (940)349-8938 of the Pec-4 Ph 1&2 Project. Door hangers The 2019 Street Reconstruction project consists of the reconstruction of roadways listed above.This Thomas reconstruction shall include new NextDoor,Email Scripture Street Street Malone 03/16/20 06/30/20 curb and gutter,ADA compliant Engineering Notification (940)349-7426 ramps in sidewalks,asphalt or concrete roadways as well as upgraded drainage,water and wastewater facilities intersection back of Intermittent closure of the NextDoor,Email Shagbark Dr with Vintage Vintage Blvd 03/16/20 04/17/20 intersection for construction Engineering (940)349-8938 Blvd right of way activities. Notification Current Closures 17 Street/Intersection From To Closure Closure Descriptio Department Upcoming Public Other Department Start Date End Date Info/Notes Meeting Communication Contact The 2019 Street Reconstruction project consists of the reconstruction of roadways listed above.This NextDoor,Email Thomas Street W.Oak Panhandle 03/16/20 06/01/20 reconstruction shall include new Engineering Notification,Direct (940)349-7426 curb and gutter,ADA compliant ramps in sidewalks,asphalt or business contact concrete roadways as well as upgraded drainage,water and wastewater facilities L.onsirucuon is continuing thru COVID- 19.Please respect workers efforts in the field and always maintain social distancing. 4/1/20-US 380/Mayhill Signal Installation is wrapping up successfully. Next step requires pavement marking installations to set stop bars and pedestrian crosswalks. 1200'East of 1200'West Engineering, This work will require US 380(E.University Dr.) N.Mayhill of E.Mayhill 11/01/19 04/30/20 Signal Upgrade and Installation Traffic,TxDOT, various lanes of travel to Additional outreach not (940)349-8925 Rd. Rd. CIP be closed. Typically, needed there will be 2 lanes closed in each direction (eastbound and westbound)with a minimum of one-lane open at all times. 3/25/20-US 380/Mayhill Signal Installation is in progress. Expected to last 1-2 weeks and will require various lanes of travel to close. 3/18/20-Project Walkthrus are underway and lanes will continue +'do —A—A Warren Ct. Wainwright Locust St. 12/16/19 06/05/20 Drainage Improvements as part Engineering Closed to thru traffic Direct business contact, (940)349-8938 St. of Pec-4 Ph 1&2 Project door hangers Current Closures 18 Street/Intersection o Closure Closure Descriptio Department Upcoming Public Other Department Start Date End DateMdR__ Info/Notes Meeting Communication Contact Closure of lanes of Windsor Drive to facilitate paving operations related to the Magnolia Phase II drainage Mesquite North Elm improvement project. West Windsor Drive Street Street 03/30/20 05/16/20 Westbound and center lanes Streets Email Notification (940)349-8425 will be closed and re-paved and then swapped to a closure of the Eastbound and center lanes once the Westbound lanes are complete. Cherrywood Wastewater collections will be Project on hold due to Woodland St Brown Dr Ln 02/10/20 03/17/20 installing a new wastewater Wastewater COVID-19 N/A (940)349-8909 main line and services Total 44 Current Closures 19 Street Closure Report IMPROVING "`" Completed Closures DENTON Week of April 6,2020-April 12,2020 \ Street/Intersection From To Closure Closure Description Department Upcoming Public Other Department Start Date End Date Info/Notes Meeting Communication Contact Concrete Street Panel Repair. The process starts with 3309 Forest Ridge Rolling Hills El Paseo 03/02/20 03/27/20 Barricading the failed sections Streets Changed per email from N/A (940)349-7146 of concrete pavement,remove Rogelio San Miguel the pavement,and install new concrete. Water Distribution will be replacing the water main,all fire We will be distributing Ave B Underwood Eagle 01/08/20 03/05/20 hydrants,and all water services Water flyers to affected (940)349-7332 on Ave B from Underwood to customers. Eagle Public Works Bell Ave. Texas College 02/10/20 04/27/20 Building out East side of Inspections, Rescheduling street NextDoor (940)205-9230 building Private closure for later date Development Concrete Street Panel and Sidewalk Repair.The process Bent Oaks Teasley Cul V Sac 02/24/20 03/17/20 starts with Barricading the failed Streets Project on hold due to N/A (940)349-7146 sections of concrete pavement, COVID-19 remove the pavement,and install new concrete. Carriage Square: Collier St Eagle Dr N.Interstate 02/10/20 03/06/20 Public Works Door Fliers (940)205-9230 35 Building out West side of Inspections Parking Garage(Private) Public Works Eagle Dr Ave.C Kendolph 03/02/20 03/08/20 Fire Hydrant Relocation Inspections, NextDoor (940)205-9230 Private Development Concrete Street Panel and Sidewalk Repair.The process Haven Way Brookside Park Place 02/24/20 03/27/20 starts with Barricading the failed Streets N/A (940)349-7146 sections of concrete pavement, remove the pavement,and install new concrete. Completed Closures 20 Street/Intersection From To Closure Closure Description Department Upcoming Public Other Department Start Date End Date Info/Notes Meeting Communication Contact From 1/13/20 to 3/8/20, City's Contractor will be clearing trees and vegetation along the south side of Hickory Creek Rd.,from the west property line of McNair Elementary School to the Riverpass Street Widening Dr.intersection. This Phone call to McNair Hickory Creek Rd. Teasley Riverpass TBD TBD (Temporary Lane Closures) Engineering will not involve any lane Elementary Principal (940)349-7112 closures,but construction zone signage will be put up to warn motorists. Atmos still needs to relocate their facilities east of the Montecito intersection before our Contractor can fully deploy to the project. Significant delays in placing base pavement due to weather. Pavement placed 3/11 and 3/12 on Hinkle.Rain Street and Drainage on the afternoon of 3/12 Hinkle Dr. Headlee Windsor 07/03/19 03/28/20 Improvements Magnolia Engineering and continuing through (940)349-8910 Drainage Ph.II 3/19 has delayed (Street Closure) completion of road surface.New anticipated finish date of Hinkle and opening to through traffic pushed back 1 week to 3/28/20 Installing Valley Gutter across Industrial at the intersection of Sycamore. The process starts Industrial Sycamore Bell 03/09/20 03/27/20 with barricading then remove Streets N/A (940)349-7146 pavement and subgrade,and install new concrete Valley Gutter. Atmos Energy to notify Sycamore Atmos,Public apartment complex's in IOOF Street Eagle Drive Street 01/06/20 03/17/20 Closer no longer needed. Works area at least three (940)205-8278 Inspections business days in advance. Completed Closures 21 Street/Intersection From To Closure Closure Description Department Upcoming Public Other Department Start Date End Date Info/Notes Meeting Communication Contact Concrete Street Panel and Sidewalk Repair.At intersection of Haven way. The process Lakeway Marble Falls Still House 02/17/20 03/06/20 starts with Barricading the failed Streets N/A (940)349-7146 sections of concrete pavement, remove the pavement,and install new concrete. Closed Long Rd.from Sherman/428 to entrance of Sherman/42 Natatorium Water,Waste NextDoor,Direct Long Rd 8 Entrance 03/09/20 03/28/20 Natatorium to install a water Water business contact (940)391-6299 connection and sewer connection in Long Rd. Installing Valley Gutter across Long Fellow at the intersection Longfellow/Brightwood of Brightwood Terrace.The Terr. Emerson Windsor 02/17/20 03/06/20 process starts with barricading Streets N/A (940)349-7146 then remove the pavement and subgrade,and install new concrete Valley Gutter Water Line improvements,as Maple St. Elm St. Myrtle St. 02/24/20 03/06/20 part of Pec-4 Ph 1&2 Engineering Direct business contact (940)349-7112 Project. Alternating lane closures. Water Main,Services,and Fire Mistywood Ln. Woodhaven Jamestown 10/07/19 03/06/20 Hydrant Replacements Water Part of Mistywood Water (940)349-7181 (Temporary Lane Closure, Project Reopen at 6 pm daily) Installation of new storm City PM will contact Montecito Dr. Hickory Buena Vista TBD TBD drainage line. Full street Engineering McNair Elementary (940)349-7112 Creek Rd. Dr. closure. Principal again on 2/7/20. Water Main,Services,and Fire Rockwood Ln. Royal Mistywood 10/07/19 03/06/20 Hydrant Replacements Water Part of Mistywood Water (940)349-7181 (Temporary Lane Closure, Project Reopen at 6 pm daily) Water Main,Services,and Fire Royal Ln. Mistywood Rockwood 10/07/19 03/06/20 Hydrant Replacements Water Part of Mistywood Water (940)349-7181 (Temporary Lane Closure, Project Reopen at 6 pm daily) Installation of new storm Hickory Marble Cove TBD TBD drainage line. Intersection Rushing Springs Dr. Creek Rd. Ln. closure. Traffic will be detoured Engineering N/A (940)349-7112 to Serenity Way. Completed Closures 22 Street/Intersection From To Closure Closure Description Department Upcoming Public Other Department Start Date End Date I Info/Notes Meeting Communication Contacm Concrete Sidewalk Repair. Hidden Repairing failed sections of Stone Crop Woodbine Meadow 02/17/20 03/06/20 sidewalk,barricade and Streets N/A (940)349-7146 remove and install new sidewalk. Curb And Gutter Repair. Repairing Broken Curbs and Union Circle Welch Welch 03/09/20 03/20/20 Drive Approaches,barricade Streets N/A (940)349-7146 and remove and install new Concrete Curbs. This project is a sidewalk installation project on the south side of W Parkway from Locust to Elm.It is part of our 2018 Sidewalk Program that will Engineering, Public Works N Elm Street improve pedestrian access and Direct business contact, W Parkway Street Street et 03/16/20 04/17/20 upgrade ADA infrastructure. Inspections, Door hangers (940)349-7104 The local businesses in this are Floyd Smith will be notified by door hanger Concrete and personal visits by staff to ensure all necessary concerns are addressed. Windsor opened from Parkside Streets, Parkside Mesquite NextDoor,Email West Windsor Drive Drive Street 11/11/19 04/04/20 to Riney Road.Still local traffic Drainage,Water, Notification (940)349-8425 only from Riney to Mesquite. Waste Water Total 24 Completed Closures 23