Loading...
2020.05.11_COD_Inspection _-IM000 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-27-20 Record Close Date 4-27-20 Active Padsite Name 105 Cole Trust South 15 Jurisdiction COD Lnc Re-Inspection Date Site Address 8333 FM 2449 Padsite Type Multi Well Rt 07 2nd Re-Inspection Date Ordinance Reg 2005-223 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Aai No. Spud Date Impact 1108-0345 GWP02-0025 COLE TRUSTS 576"A"20 223310 12132830 4/23/2006 Low 1108-0347 GWP02-0025 COLE TRUSTS 576"A"18 224567 12132810 4/5/2006 Low I INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve P Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity • Good Need ResolveContainme t • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved 5 Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolvei Markers per Site IInspection Comments Compliant Inspections Conducted by Third Party and COD Follow Up I Third Party Inspection Date: 4-1-20 COD Follow Up Date: 4-27-20 Leaks: Well A On 4/21/20,Operator compression fitting advised issue was leading off kimray resolved. On 4/27/20 RW valve Corrosion: inspected all compression ' s �' fittings on well A- Ancillary A , Operator addressed issue, no leaks were found. 0 • 1 A a Q, Ilaa�od:. ■ A ■ ........ Q 1AM •� ❑ OAST QAne■■y Eoupmair Oom-Count'P.— ;--�OOYrvalm Pam OPa■■Y