2020.05.11_COD_Inspection _-IM000 Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone 1-800-214-2154 Well Operator Devon
Inspection Date 4-27-20
Record Close Date 4-27-20
Active Padsite Name 105 Cole Trust South 15
Jurisdiction COD Lnc Re-Inspection Date
Site Address 8333 FM 2449
Padsite Type Multi Well Rt 07 2nd Re-Inspection Date
Ordinance Reg 2005-223 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Aai No. Spud Date Impact
1108-0345 GWP02-0025 COLE TRUSTS 576"A"20 223310 12132830 4/23/2006 Low
1108-0347 GWP02-0025 COLE TRUSTS 576"A"18 224567 12132810 4/5/2006 Low
I INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
P Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity • Good Need ResolveContainme t • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved 5 Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolvei
Markers per Site
IInspection Comments
Compliant
Inspections Conducted by Third Party and COD Follow Up I
Third Party Inspection Date: 4-1-20 COD Follow Up Date: 4-27-20
Leaks: Well A On 4/21/20,Operator
compression fitting advised issue was
leading off kimray resolved. On 4/27/20 RW
valve Corrosion: inspected all compression
' s �' fittings on well A-
Ancillary A , Operator addressed issue,
no leaks were found.
0
• 1 A
a Q, Ilaa�od:. ■
A ■ ........ Q 1AM
•� ❑
OAST
QAne■■y Eoupmair
Oom-Count'P.—
;--�OOYrvalm Pam
OPa■■Y