Loading...
2020.05.11_COD_FollowUp _.,,,,111111111100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone Inspection Date 4-20-20 817-841-8885 Well Operator Bedrock Record Active Padsite Name 6 BAKER RANCH 5H Close Date 4-28-20 Jurisdiction COD Lnc Re-Inspection Date 4-28-20 Site Address 4302 Hampton Rd. Padsite Type Single Well Rt 04 2nd Re-Inspection Date Ordinance Reg 2005-223 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1110-0264 GWP06-0007 BAKER RANCH 5H 237424 12133159 10/5/2007 Low INSPECTION CHEC Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint Good Need • Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need Resolve p� Trash/Debris • Good Need Resolve Containment Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning Good Need Resolve Tank Battery Good Need Resolves Landscaping • Good Need Resolve Equip Height Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site Inspection Comments I @ WH Separator(A), DV controller venting needs repair(red flagged). Bare pipe at WH needs paint. On 4/28/20 RW conducted a spot inspection regarding workover activities.. Equipment with issues was dissembled and not in service. COD will conduct a post workover inspection Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-25-20 COD Follow Up Date: 4-20-20 Corrosion:Well A Bare pipe from a recently installed Plunger lift system needs paint. . A ' Laaand: w.n Separator Q A-11ary Equpm.nt Observation Path A A . O P.d.te