2020.05.11_COD_FollowUp _.,,,,111111111100 Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone Inspection Date 4-20-20
817-841-8885 Well Operator Bedrock
Record Active Padsite Name 6 BAKER RANCH 5H Close Date 4-28-20
Jurisdiction COD Lnc Re-Inspection Date 4-28-20
Site Address 4302 Hampton Rd.
Padsite Type Single Well Rt 04 2nd Re-Inspection Date
Ordinance Reg 2005-223 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact
1110-0264 GWP06-0007 BAKER RANCH 5H 237424 12133159 10/5/2007 Low
INSPECTION CHEC
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint Good Need • Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve
RRC/A i# • Good Need Resolve Tank Integrity Good Need Resolve
p� Trash/Debris • Good Need Resolve Containment Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning Good Need Resolve
Tank Battery Good Need Resolves Landscaping • Good Need Resolve Equip Height Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
Inspection Comments I
@ WH Separator(A), DV controller venting needs repair(red flagged). Bare pipe at WH needs paint. On 4/28/20 RW conducted a spot
inspection regarding workover activities.. Equipment with issues was dissembled and not in service. COD will conduct a post workover
inspection
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 3-25-20 COD Follow Up Date: 4-20-20
Corrosion:Well A Bare pipe from a recently
installed Plunger lift
system needs paint.
. A '
Laaand:
w.n
Separator
Q A-11ary Equpm.nt
Observation Path
A A . O P.d.te