Loading...
2020.05.11_COD_FollowUp _,,,01100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone 432-570-1911 Well Operator Endeavor Inspection Date 4-14-20 Record Active Padsite Name 138 O'TOOLE Pad Close Date 4-30-20 Jurisdiction COD Re-Inspection Date 4-30-20 Site Address 1672 E Ryan Rd Padsite Type Multi Well Rt 06 2nd Re-Inspection Date Ordinance Reg 2005-223 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name RRC Id Avi No. Spud Date Impact 1109-0151 GWP06-0004 O'TOOLE UNIT I 238390 12133067 4/12/2007 High 1109-0152 AGWP07 O'TOOLE UNIT 2H 240761 12133146 9/27/2007 High I INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve P Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity • Good Need ResolveContainme t • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolvei Markers per Site IInspection Comments At Compressor-Suction controller 30 HPG venting needs repair, 3rd stage Sep Dv Controller venting needes repair, , On 4/17/20 RW inspected the 30 HPG per operator's request. The 30 HPG was found working properly-No venting I Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-31-20 COD Follow Up Date: 4-14-20 Compliant ®............�*...... ' C ® O AST -r ----------- % • foam Lnw ® U,_N S.,Q"Par[ '® Oo+.r.M A,S.,0,V Po1m © Sa S.,*.g Pn - A 8 NYtl Da.cbn(bl A 0 C' U - a-faKaMy Saaa•.q A�.nM� .-�OOsanaaan PAIN OpwO