Loading...
022522 Friday Staff Report „ City Manager's Office " 215 E. McKinney St., Denton, TX 76201 • (940) 349-8307 DENTON MEMORANDUM DATE: February 25, 2022 TO: The Honorable Mayor Hudspeth and Council Members FROM: Sara Hensley, Interim City Manager SUBJECT: Staff Report I. Council Schedule A. Meetings 1. Public Utilities Board on Monday, February 28, 2022, at 9:00 a.m. in the Council Chambers. 2. Civil Service Commission on Monday, February 28,2022, at 11:00 a.m. at the Development Service Center. 3. Zoning Board of Adjustment on Monday, February 28, 2022, at 5:30 p.m. in the City Council Work Session Room. 4. Internal Audit Advisory Committee on Monday, February 28, 2022, at 5:30 p.m. in the City Hall Conference Room. 5. Traffic Safety Commission on Monday, February 28, 2022, at 5:30 p.m. at the Development Service Center. 6. Work Session of the City Council on Tuesday, March 1, 2022, at 2:00 p.m. followed by a Regular Meeting at 6:30 p.m. in the Council Chambers. 7. Historic Landmark Commission on Wednesday,March 2,2022,at 5:30 p.m. at the Development Service Center. 8. Agenda Committee on Thursday, March 3, 2022, at 8:00 a.m. in the City Hall Conference Room. 9. Cancelled - Downtown Economic Development Committee on Thursday, March 3, 2022, at 8:30 a.m. at the Development Service Center. 10. Public Art Committee on Thursday, March 3, 2022, at 4:00 p.m. in the Civic Center Community Room. OUR CORE VALUES Integrity • Fiscal Responsibility • Inclusion • Transparency • Outstanding Customer Service II. General Information & Status Update A. Updated CDC Masking Guidelines — On February 25, 2022, the Centers for Disease Control and Prevention (CDC) announced new metrics for evaluating whether masks should be worn indoors to prevent COVID-19 spread. The new metrics consider new COVID-19 hospital admissions, new COVID-19 cases, and overall COVID-9 hospitalization levels when making indoor masking recommendations. The new metrics will categorize communities as "low", "medium" or "high" risk. In this new system, indoor masking is only recommended in those communities categorized as "high". Denton County falls within the "medium" category meaning that universal indoor masking is not recommended by the CDC at this time. Following direction received from the Council on February 21, staff have added a work session discussion to the March 1, 2022, City Council meeting agenda. An individual consideration item was also added for Council to consider action regarding the Nineteenth Order of Council in light of this update from the CDC. Staff contact: Ryan Adams, City Manager's Office B. Library Facilities Closed for Staff Development—All Denton Public Library facilities will be closed Friday, March 4, for annual staff development and training. Regular library operating hours and services resume on Saturday, March 5. Each year, staff from all three locations come together for one day to develop new skills and build rapport with fellow employees. Staff development and training are crucial to Denton Public Library, enabling library staff to provide cohesive, innovative, and high-value services. Library closings will be posted at all locations, the library website, social media, and noted on the outgoing phone message. Holds will remain available and hold periods will be extended by one day to ensure that patrons have a full seven days to pick up holds. Book drops at all three library facilities will remain open for material returns. Online library resources and downloadable materials are also available. Wi-fi is available 24/7 in all library public parking lots and in the Nook Park behind the Emily Fowler Central Library. Staff contact: Jennifer Bekker, Libraries C. Comprehensive Plan and Mobili . Plan Update—Due to inclement weather,the public hearing and consideration of the Comprehensive Plan and Mobility Plan Update has been rescheduled for March 9. Presuming a recommendation is received from the Planning and Zoning Commission, City Council will conduct their respective public hearing and act on the Comprehensive Plan and Mobility Plan Update on March 22. Staff republished the required legal notices accordingly. Staff contact: Ron Menguita, Development Services D. Location of Public Comments at Council Meetings — With the return to hybrid City Council meetings in 2021, in-person public comments have been given from a secondary microphone positioned within the Council Chambers' audience seating. Beginning March 1, that mic will be removed, and members of the public will return to providing their comments from the Chambers' podium. Additionally, all seating will be made available for use and no rows will be blocked. These changes will allow 2 for better spacing within the room given the significant attendance observed over the previous months. Staff contact: Ryan Adams, City Manager's Office E. City Council Priorities Update — In September 2021, City Council adopted new Council Priorities for FY21-22. Attached is a first-quarter update on these major projects and goals including completed items, next steps, and anticipated timelines. Staff contact: Monica Benavides, City Manager's Office F. Wage Increase for Temporary/Seasonal Parks and Recreation Staff— Parks and Recreation regularly hires approximately 300 seasonal summer employees including lifeguards, concession workers, and summer camp counselors to work at the Natatorium, Water Works Park, Civic Center Pool, and summer camps. Last year, aquatic facility operating hours and summer camp spots were limited due to staffing shortages. This year, the department is still struggling to attract and retain seasonal employees due to the low starting wage of$11 per hour. Without sufficient staffing levels, the department will not be able to open or operate the aquatic facilities or summer camp programs. To be competitive with other local businesses, help spur applications, and entice last year's employees to return,staff will be increasing the starting wage for temp/seasonal employees to $15 per hour. The wage increase request will come before Council in a future budget adjustment; however, staff will be implementing this change immediately as summer staff must be in place by April to allow for onboarding and training. Position details and applications are available at www.dentonjobs.com. Staff contact: Gary Packan,Parks and Recreation and Tiffany Thomson,Human Resources G. Winter Weather Situation Reports—During this week's winter weather, the attached Situation Reports were compiled and distributed to staff at regular intervals. A Situation Report (SITREP) serves as a status update in response to an incident and includes broadly summarized information provided by departments. Staff contact: Bob Martinez, Fire H. Transparency Star Award in Contracts and Procurement—The City has been awarded a Transparency Star in Contracts and Procurement. The City of Denton is one (1) of only 15 municipalities in Texas to obtain all five (5) Transparency Stars. The Texas Comptroller of Public Accounts' Transparency Stars program recognizes local governments for going above and beyond in their transparency efforts. The demonstrated efforts include providing clear and meaningful financial information not only by posting financial documents, but also through summaries, visualizations, downloadable data, and other relevant information. Staff contact: Cassey Ogden, Finance and Christine Taylor, Procurement& Compliance I. Transparency Star Award in Economic Development — On February 22, the Texas Comptroller of Public Accounts awarded the City of Denton a Transparency Star in Economic Development. The Comptroller's Office launched the Transparency Stars program in March 2016 to recognize cities, counties, and school districts making strides to greater government transparency by providing easy online access to important financial data. A Traditional Finance Star must be awarded before other Transparency Stars, such as Procurement, Economic Development, Public Pensions, and Debt Obligations can be awarded. Denton is one of 200 cities to be awarded the 3 Economic Development Star. The Denton's Economic Development Transparency Star information can be found at Economic Development Transparency I Denton, TX (cityofdenton.com) and on the state website at Transparency Stars (texas.gov). Staff contact: Erica Sullivan, Economic Development J. Denton Meets Plastic Bag and Film Recycling Goal — Denton Parks and Recreation met its goal to recycle 500 pounds of plastic bags and thin plastic. In November 2021, Denton Parks and Recreation began participating in a collection program from NexTrex, a company that converts thin plastics into eco-friendly outdoor products. Five drop-off locations were set up at City of Denton facilities. The plastic was picked up by Keep Denton Beautiful staff and volunteers, sorted to remove contaminants, and transported to a local retailer for recycling. As part of this challenge, NexTrex promises to give any community meeting the 500-pound recycling goal a free high- performance composite bench. Results have been reported to NexTrex and staff await instruction on next steps. The location of where the bench will be installed is yet to be determined. Staff contact: Autumn Natalie, Parks and Recreation K. DTV Video Highlights for February—In addition to producing public meetings, staff continues to collaborate on videos that raise awareness, educate, inform, and inspire our community.DTV would like to highlight the videos below and encourage Council to share them. 1. A Tale of Two Births: YouTube, Facebook We're proud of two public safety dispatchers for calmly and professionally helping two families in the birth of their babies. 2. Quakertown Park Update - Community Development Block Grant: YouTube, Facebook Director of Parks & Recreation, Gary Packan, and Director of Community Services, Dani Shaw highlight the improvements made to Quakertown Park with the help of the Community Development Block grant. 3. Winter Preparedness - Street Sanding: YouTube, Facebook The City of Denton was ready for winter weather. Our street crews were working around the clock keeping major thoroughfares open for travel. All videos air on DTV, are shared via social media channels and are available on the City's YouTube channel. Staff contact: Billy Matthews, Public Affairs L. Public Comment on Updated Comprehensive Economic Development Strategy- The North Central Texas Council of Governments (NCTCOG) and North Central Economic Development District (NCTEDD) are requesting input from the region on the updated 2021-2026 North Central Texas Comprehensive Economic Development Strategy (CEDS). The CEDS outlines an approach to regional economic growth that builds on the region's strengths, emphasizes key regional industry clusters, and identifies economic development goals for the region. Economic Development staff currently serve on the NCTEDD Board and CEDS Cluster 7 Committee. A link to the CEDS can be found here. See below for the virtual public meetings on the CEDS. Comments and questions may be submitted to Prit Patel at PPatel(a),nctcog.org or(817) 704-5666. Staff contact Erica Sullivan, Economic Development 4 THURSDAY,MARCH 3,2022 MONDAY,MARCH 7,2022 TUESDAY,MARCH 8,2022 10:30 AM MEETING LINK: 10:30 AM MEETING LINK: 10:30 AM MEETING LINK: hllps://nctcoa.zoom.us/j/8389837 https://nctcog.zoom.us/j/86932 hgps://nctcoa.zoom.us/i/83190 2593?pwd=VmZFck9WSndNck 378738?pwd=U2RLZ1Z0SE9 444962?12wd=YVB5S2tYT2NP 4yNkpiWm5EY1A0UT09 GcVM1RXVhQj1UUFcvZzO9 YIB0VW14R3p6bEhQUT09 PHONE LINE ACCESS: 346- PHONE LINE ACCESS: PHONE LINE ACCESS: 346- 248-7799; Passcode: 346-248-7799; Passcode: 248-7799; Passcode: 83898372593# 86932378738# 83190444962 6:30 PM MEETING LINK: 6:30 PM MEETING LINK: 6:30 PM MEETING LINK: hllps://nctcoa.zoom.us/j/8459844 https://nctcog.zoom.us/j/85909 https://nctcoa.zoom.us/i/82897 3329?pwd=aEE3a01CR1U3cVR3 262981?pwd=REVCcO1HQXF 799613?pwd=RmlXQmFvcUx 0G44SWpIZDBFdz09 zSU 4QdT1rUjRJb2VWQT09 aMXNLSmdmbV13eG9DQT09 PHONE LINE ACCESS: 346- PHONE LINE ACCESS: PHONE LINE ACCESS: 346- 248-7799; Passcode: 346-248-7799; Passcode: 248-7799; Passcode: 84598443329# 85909262981 82897799613# M. Police Department Quarterly Newsletter — The most recent issue of the quarterly Police Department newsletter is attached. This issue, distributed earlier this week, highlights recent and upcoming community events, noteworthy 911 calls, and the department's 2021 Annual Report. Staff contacts: Allison Beckwith and Amy Cunningham, Police N. Senior Center Magazine—The annual Senior Magazine will be printed and mailed to households with individuals aged 50 years and older in the coming weeks. The Senior Magazine includes details on how active adults and seniors can get connected with Denton Parks and Recreation. With the reopening of American Legion Hall Senior Center, there are even more opportunities for seniors to stay engaged. Some of the activities highlighted in the magazine include upcoming day trips and extended travel, outdoor recreation, volunteer opportunities, games, tournaments, and technology and wellness classes. Staff contact: Megan Thomas, Parks and Recreation O. Honey Run Open for Registration — The 7th Annual Honey Run will take place on Saturday, April 23, and will kick off Keep Denton Beautiful's Denton Redbud Festival. The one-mile fun run and 5K will begin and end at Quakertown Park. Free T-shirts are available on a first come, first served basis for registered runners. Both the one mile run and the 5K run are fun runs and will not have certified times, but there will be prizes for the fastest runner in each age group. Registration for this free event opens this Friday,February 25,at www.dentonparks.com. Staff contact:Arianna Bencid, Parks and Recreation P. My Little Valentine Dance Recap—Denton Parks and Recreation hosted 106 residents at the My Little Valentine Family Dance on Friday,February 11,from 6 p.m.to 8 p.m. Activities included a live DJ, photo op station, light refreshments, themed crafts, contests, and a complimentary candy bar. Staff contact: Arianna Bencid, Parks and Recreation 5 III. Responses to Council Member Requests for Information A. Dark Sky Compliance Lighting — On February 8, Mayor Pro Tem asked staff for information previously presented to Council regarding dark sky compliant historic style lamp post. The International Dark-Sky's mission is to protect and preserve the nighttime environment and minimize light pollution using high-quality outdoor lighting. Staff clarified that the City uses two styles of streetlights, Cobra Heads and Post Top (Acorn style) lights. Cobra Heads are fully dark sky compliant with zero up light and comprise about 65% of the City's streetlights while Post Top (Acorn Style) are not dark sky compliant and comprise about 35% of City streetlights. Regarding the Post Top lights, staff continue to work with residents and have been able to solve most complaints by dimming lights. As a result, staff has seen a marked decrease in Engage Denton submissions despite the installation of new LED lights. Staff contact: Tony Puente, DME B. Tuition Free Preschools — On February 14, Mayor Hudspeth asked staff to consider meeting with officials from Bezos Academy, a tuition-free preschool, regarding a possible community partnership. Staff confirmed they will set up a meeting in the future to discuss. Staff contact: David Gaines, City Manager's Office C. Historic District Home Improvements — On February 15, Mayor Pro Tem Meltzer forwarded an email from a homeowner relaying concerns with obtaining approval for home improvements in the City's historic district. The applicant was scheduled for the Historic Landmark Commission meeting Monday,February 14;however,the inability to achieve an in-person quorum as required by the Texas Open Meetings Act resulted in a cancelation of the meeting. Staff is actively contacting HLC members to schedule an emergency meeting prior to the next regularly scheduled monthly meeting on March 21. Staff contact: Tina Firgens, Development Services D. Proposed Millennium Crest Development—On February 17,Mayor Pro Tem Meltzer forwarded a concern from a Southridge resident regarding the City's review and approval process for developers. Staff confirmed that there is no "cutting in line" in the plans approval process. The developer is allowed to build by right on the property and is following the normal procedure. Per the existing MN zoning district, multi- family is an allowed use by right and the developer is allowed to build in accordance with the MN requirements provided for in the DDC (up to 41 feet in height). Staff contact: Tina Firgens, Development Services E. Barking Dog Complaint — On February 17, Mayor Pro Tem Meltzer and Council Member Beck contacted staff after receiving a barking dog complaint. The complainant indicates the issue has been ongoing and asked whether his neighbor could be required to split the cost of building a wooden fence since the existing fence is metal and the yards are completely open. Staff determined that discussion related to fencing would be a civil matter between the two homeowners; however, the resident can contact the Legal Department if they wish to initiate a citizen-file barking dog complaint. Staff contact: Dani Shaw, Community Improvement Services F. ADA Restroom at MLK, Jr. Recreation Center — On February 21, Mayor Pro Tem Meltzer forwarded staff a resident question on whether MLK, Jr. Recreation Center had an ADA women's restroom. There are two women's restrooms available at MLK, 6 with one of them designated as an ADA-accessible restroom. The City plans to improve signage in this facility, clearly designating the ADA restroom and encouraging staff to inform users of its location within the building. It is also worth noting that the City recently completed an ADA study of all City facilities (as approved by the Council). The accessible restroom was found to have several non- compliant items requiring correction,though none of those issues were identified as a high priority. Residents with questions or concerns regarding ADA-compliant facilities can contact the City at mailto:ADAgcityofdenton.com. Staff contact: Scott Gray, Facilities G. Assistance from Homeless Outreach Team (HOT)—On February 21, a local business owner reached out to Mayor Pro Tem Meltzer with concerns over a group of unhoused individuals behind his business. Mayor Pro Tem asked staff whether the Homeless Outreach Team could visit with the group to provide information on resources and staff confirmed individuals from the HOT team will follow up. Staff contact: Frank Dixon, Police and Dani Shaw, Community Services H. Vehicle Damage Claim — On February 23, Council Member Davis forwarded a resident email regarding a claim for alleged damage to her vehicle after striking a metal construction plate while driving. Upon receiving the request, staff contacted the resident through the resident's email address and provided a Notice of Claim form, an FAQ about the Texas Tort Claims Act(TTCA), and contact information for the City's Claims Administrator. A claim can be filed by submitting the attached Notice of Claim form to the Risk Management division. The form can be found by visiting the City of Denton website and selecting the "Report an Issue" icon. Other information available in the Quick Links section is a FAQ about the Texas Tort Claims Act, which provides answers to the most asked questions regarding when a city may be liable for property damage or personal injury. Staff contact: Deby Skawinski, Risk Management I. Construction Site Trash — On February 21, Council Member Maguire submitted a request via Engage Denton on behalf of a resident in the Willowwood West subdivision. The resident relayed concerns of trash in the drainage ditch from a nearby construction site. Development Services staff reached out to the appropriate developers to initiate cleanup and work towards a resolution. Staff contact: Billy Ewton, Building Inspections J. Towing Company Concerns — On February 21, Council Member Beck forwarded a resident complaint regarding towing practices within the City and asked staff to update him on policies, procedures, and obligations. Staff is compiling material and will follow up with additional information. Staff contact: Frank Dixon, Police IV. Information from the Interim City Manager A. Construction Inflation Alert- The attached Construction Inflation Alert,provided by Peak Program Value(PPV),indicates concerns for schedules and costs associated with construction planned for 2022 and beyond. Staff will discuss this with PPV, along with the recommended bidding strategy (e.g., base bid schedule durations, alternates to accelerate the schedule, alternate to identify costs associated with liquidated damage, etc.)they provided to assist us in risk mitigation. These recommendations are based on what PPV is hearing from contractors and seeing on other projects, including contractors not guaranteeing schedules, contractors increasing their base bids to cover as much as 90 days of potential liquidated damages, and significant supply chain delays and cost increases. There are many unknowns right now which translate to increased risk for the contractors, and thus increased cost to the City. It is expected that the situation in Ukraine will also have an impact on various supplies and associated costs. Staff is hopeful that some bidding modifications will help get bids that identify the risk to schedule and the increased costs in this unprecedented time. Facilities Director Scott Gray will share additional details and recommendations to Purchasing and Legal ASAP, with the hopes we can get out in front of this for our upcoming project bids (Fleet Expansion, City Hall West, Fire Station 9, and Solid Waste Fleet Facility). V. Upcoming Community Events and Meetings A. Black History Month Celebration — The Parks and Recreation Department will be hosting a Black History Month Celebration on February 26 at the MLK,Jr. Recreation Center. This celebration will feature a keynote address from Dr. Gabrielle Smith, an experimental psychologist, and Associate Professor of Psychology at Texas Woman's University. Dr. Smith will speak on this year's theme of"Health and Wellness. Additionally, the Black History Month Celebration will also feature various entertainers, speakers, and vendors, as well as an extensive college and career fair on site. The career fair begins at 10 a.m. and will include representatives from UNT, NCTC, TWU, Baylor University, UT Arlington, UT Austin, Hardin-Simmons University, Dallas Baptist University, University of Arkansas, Texas A&M — Commerce, Grayson College, Texas State Technical College, DeVry University, and Integrity Health and education CAN School. Additionally, the job fair will feature representatives from the following companies: Fastenal, Old Navy, Labor Finders, Labor Max, MHMR, and Express Pros. Staff contact: Cheylon Brown, Parks and Recreation B. Denton Senior Center Open House—On Saturday, March 5 from 9 a.m. to 1 p.m.,the Denton Senior Center is hosting an Open House to showcase all the great ways that seniors and active adults can participate. There will be demos of fitness and art classes, and a special presentation from the Osher Lifelong Learning Institute(OLLI) at UNT. Senior Advisory Council Members will be available for facility tours and questions about the Denton Senior Center. Attendees will be offered a one-day-only 10 percent discount on memberships and programs. Staff contact: Megan Thomas, Parks and Recreation VI. Attachments A. FY 21-22 Council Priorities Update—Q1..................................................................10 B. Situation Reports........................................................................................................42 C. Contracts and Procurement Transparency Star..........................................................56 8 D. Economic Development Transparency Star...............................................................57 E. Police Newsletter—Q4...............................................................................................58 F. Notice of Claim Form.................................................................................................66 G. 2022 Construction Inflation Alert..............................................................................68 VII. Informal Staff Reports A. 2022-013 Debt Summary Report ...............................................................................76 B. 2022-014 Motor Vehicle Equipment Enforcement..................................................110 VIII. Council Information A. Council Requests for Information ...........................................................................112 B. Council Calendar .....................................................................................................114 C. Future Work Session Items .....................................................................................117 D. Street Construction Report ......................................................................................118 9 Quarterly City Council Priorities Report Q1 I FY 2021-22 Summary This quarterly report summarizes progress on Council priorities and related projects. Information can be found at www.cityofdenton.com/councilpriorities Prepared by the City Manager's Office OF DENTON 10 Table of Contents Background .............................................................................................................................................................................2 Key Focus Area: Pursue Organizational Excellence.................................................................................................................3 Council Priority: Develop and Implement American Rescue Plan Funding and Programs.................................................3 Project: Implement 311 System..........................................................................................................................................4 Project: Continue Grants Management Improvements.....................................................................................................5 Project: Continue to Evaluate Organizational Staffing and Benefits..................................................................................6 Key Focus Area: Enhance Infrastructure and Mobility ...........................................................................................................7 Priority: Improve Capital Project Planning and Communication........................................................................................7 Priority: Finalize the Mobility Plan Update.........................................................................................................................8 Project: Develop City Hall West Plan ..................................................................................................................................9 Project: Conduct Parks Planning.......................................................................................................................................11 Project: Enhance Focus on Traffic and Speed Safety........................................................................................................12 Key Focus Area: Foster Economic Opportunity and Affordability........................................................................................13 Priority: Update the City's Comprehensive Plan...............................................................................................................13 Priority: Develop an Affordable Housing Strategy............................................................................................................15 Project: Continue Implementing Economic Development Strategic Plan........................................................................16 Project: Review& Develop Denton Development Code (DDC) Amendments .................................................................17 Key Focus Area: Promote Sustainability&the Environment................................................................................................18 Priority: Develop a Comprehensive Solid Waste Management Strategy.........................................................................18 Project: Progress the 2020 Simply Sustainable Framework and Advisory Committee ....................................................19 Project: Evaluate a Strategy or Preferred Pattern of Preservation ..................................................................................20 Project: Expand Bike/Pedestrian Network........................................................................................................................21 Key Focus Area: Support Healthy&Safe Communities........................................................................................................22 Priority: Continue COVID-19 Response.............................................................................................................................22 Project: Continue Development of Police Department Mental Health Division..............................................................23 Project: Continue Updating Police Department Policies and Training.............................................................................24 Project: Complete Public Safety Facilities from Bond Program........................................................................................25 Project: Pursue Fire Department Accreditation ...............................................................................................................26 Project: Planning and Design for Fire Station #9 ..............................................................................................................27 Key Focus Area: Strengthen Community Services and Quality of Life..................................................................................28 Priority: Continue to Strengthen Homelessness Initiatives and the Housing Crisis Response System ............................28 Project: Develop the 909 N. Loop 288 Building as a 24/7 Center.....................................................................................29 Project: Consider a Non-Discrimination Ordinance..........................................................................................................30 CompletedProjects...............................................................................................................................................................31 1 11 Background On September 28, 2021,the Denton City Council adopted the Fiscal Year 2021 to 2022 Council priorities.These eight priorities serve as a foundation for budget development and a primary staff focus for the upcoming fiscal year. Included in this document are the status and anticipated timelines for each priority or major project, updated through the end of the first quarter. Staff will continue to monitor project timelines and provide quarterly updates to Council. 2 12 Key Focus Area: Pursue Organizational Excellence Council Priority: Develop and Implement American Rescue Plan Funding and Programs Status: Ongoing Departments: Community Services, Economic Development, Finance, Fire, Public Affairs Complete Next Steps Anticipated Timeline Behavioral Health Grant and Ongoing review of projects and Behavioral Health grant and Non- Nonprofit Support grant applications programs. Profit Support grant awards and reviewed, and recommendations agreements are to be completed in approved by Community Services March 2022. Advisory Committee. Notice of Funding Opportunity for Hires made for Homeless Outreach Small Business Relief grant scheduled Team positions (Caseworker and for release in February 2022. Paramedic) and an Emergency Management Program Coordinator. The Art/Culture grant program was presented to the Public Art Purchase and implementation of Committee on February 10, 2022. A Alert Denton -system replacement follow-up meeting is scheduled with for CodeRed. the Greater Denton Arts Council. Grant scheduled for release in March Development of website and 2022. communication campaign for vaccination information. Homeless Outreach Team Paramedic is scheduled to start in March 2022. Purchase of medical supplies, testing equipment, and refrigeration units for vaccination support. First full financial/progress report was submitted on January 31, 2022. 3 13 Project: Implement 311 System Status: Ongoing Departments: Public Affairs,Technology Services Update: The 311/CRM System vendor,Verint, was procured in late 2021. Staff are currently engaged in project kickoff activities and interviews for the 311 Center Coordinator position. Complete Next Steps Anticipated Timeline Council presentations as part of FY Continue project discovery and Winter 2022-Winter 2023 - Project 2021 and FY2022 budget processes. implementation. Discovery and Implementation. Council approved the sale of Spring 2022 - Hire 311 Center Certificates of Obligation (included Coordinator. this project). Spring-Summer 2022 - Hire additional Procurement and Council approval of 311 Call Center Staff. contracts for 311/CRM consultants. Fall 2022- Complete Staff Training on Procurement of 311/CRM Services 311/CRM system. from Verint, Inc. February 6, 2023 - Launch 311/CRM Project Kickoff service. 4 14 Project: Continue Grants Management Improvements Status: Ongoing Departments: Finance, Grants Administration Update: The initial release of Infrastructure Investment and Jobs Act (IIJA) information has been reviewed and a summary of funding opportunities was shared with Denton Municipal Electric for the development of a list of potential projects. Completed Next Steps Anticipated Timeline Prepared and presented a work Ongoing oversight of grants awarded The full transition will be completed session to City Council on to the City. in October 2022. 11/09/2021 with a staff recommendation to provide In the process of transitioning HOT Full implementation is expected to be additional holidays for City Funds and Sponsorship Program to completed by May 2022. employees. the Grants Office. Continuous through 2022. Updated Holidays Policy to add two Supporting the development and (2) City observed holidays and add implementation of programs funded two (2) personal floating holidays. by the American Rescue Plan (ARP) Adopted by City Council on Act. 12/7/2021. Acquisition and implementation of a Created a new Mental Health Leave grant management system. Policy to comply with state law for Police officers and extended to Supporting the development and Firefighters. Adopted by City Council implementation of programs funded on 12/14/2021. by the Infrastructure Investment and Jobs Act(IIJA). Created a new Quarantine Leave Policy to comply with state law for Police officers, Detention Officers, and Firefighters.Adopted by City Council on 12/14/2021. 5 15 Project: Continue to Evaluate Organizational Staffing and Benefits Status: Ongoing Departments: Human Resources Complete Next Steps Anticipated Timeline Prepared and presented a work Prepare and present a work session City Council Work Session on Leave session to City Council on to City Council on March 22 with an Policies on March 22. 11/09/2021 with a staff overview of paid and unpaid leave recommendation to provide policies, including information and additional holidays for City options for paternal leave. employees. HR continues to meet monthly with Updated Holidays Policy to add two each department to understand their (2) City observed holidays and add needs and provide assistance, two (2) personal floating holidays. including evaluating staffing. Adopted by City Council on 12/7/2021. Research and develop an internship program for potential consideration, Created a new Mental Health Leave including budget and resource needs. Policy to comply with state law for Police officers and extended it to Firefighters. Adopted by City Council on 12/14/2021. Created a new Quarantine Leave Policy to comply with state law for Police officers, Detention Officers, and Firefighters.Adopted by City Council on 12/14/2021. 6 16 Key Focus Area: Enhance Infrastructure and Mobility Priority: Improve Capital Project Planning and Communication Status: Ongoing Departments: Capital Projects, Customer Service and Public Affairs Complete Next Steps Anticipated Timeline Planning: Planning: Project Management Manual: Implementation is complete for the Currently updating the Project Summer/Fall 2022 Adoption new Project Management software Management Manual which, once system, Procore,which serves as a adopted will serve as the standard to Project Management Software: key tool for project planning, ensure all City construction projects Implementation completed Q1 2022. financial management, and project are delivered consistently with Completion of the financial oversight.The current plan focuses standards for internal and external integration in progress with Q2 2022 on horizontal coordination and communication. anticipated completion date. (utility/roadway/sidewalk) projects The manual will also help facilitate with the goal of having this system the planning process and be in CIP Updates/Construction serve as an enterprise project alignment with the Procore software Guide/Cross-Departmental management solution.A few implemented by CIP-Engineering. Communication: Ongoing effort to additional integrations are in process provide the necessary level of detail for the financial management Communication: to keep Council, residents, and other component. Staff is also continuing to refine on an City departments informed and as-needed basis the quarterly CIP engaged on planned and current Communication: updates to City Council, the quality capital projects. Collaboration with Public Affairs was and type(s) of content included in the completed to launch the Discuss biannual Construction Guide and Denton interactive feature to further finding new ways to improve internal engage residents on the status of coordination &communication on major capital projects.This tool is projects through geographic and intended to be used for major capital targeted meetings to facilitate cross- projects and serves as a companion departmental dialogue. Continuing to to the new CIP map launched on use the CIP Map while integrating January 3, 2022. with the new project management software and the software used to track private development projects to ensure data is as comprehensive as possible. 7 17 Priority: Finalize the Mobility Plan Update Status: Ongoing Departments: Capital Projects,Traffic Engineering Complete Next Steps Anticipated Timeline Staff is currently reviewing the draft Spring 2022—Bring forward the mobility plan and incorporating all Mobility Plan as a City Council Work comments received along with Session Item. coordination of the Comprehensive Plan and TxDOT/NCTCOG proposed Summer 2022—Final adoption; this projects. effort will be coordinated with the development of the new Comprehensive Plan. 8 18 Project: Develop City Hall West Plan Status: Ongoing Departments: Facilities Completed Items Next Steps Anticipated Timeline August 15, 2017 -A Work Session Architexas to prepare construction February 2022—April 2022— was held to provide CHW Renovation documents for interior demolition Document preparation. Options. and removal. Staff with solicit construction contractor. May 2022—Community Poll and November 7, 2017 - Resolution Open House meetings. R2017-040 was approved creating Architexas will begin drafting their the CHW Steering Committee. community and business outreach July 2022—Draft 1 Vision Plan plan, including for-profit and not-for- Review November 14, 2017- Resolution profit organizations. R2017-049 was approved modifying August 2022—Draft 2 Vision Plan the CHW Steering Committee Review nomination requirements. August 2022—Construction December 18, 2017, A CHW Steering contractor solicitation approved, and Committee meeting was held. interior demolition begins. Anticipated conclusion in November January 22, 2018 -A CHW Steering of 2022. Committee meeting was held. October 2022—Final Draft of Vision March 5, 2018 -A CHW Steering Plan presented to City Council for Committee meeting was held. feedback and recommendations. April 2, 2018 -A CHW Steering Committee meeting was held. May 21, 2018-A CHW Steering Committee meeting was held. June 26, 2018 -A Work Session was held to provide an update on the Committee process and receive direction on member vacancies and the upcoming sunset date. July 17, 2018- Resolution R18-1105 was approved extending the Committee's sunset date. July 30, 2018-A CHW Steering Committee meeting was held. August 27, 2018 -A CHW Steering Committee meeting was held. 9 19 September 10, 2018 -A public meeting was held. October 15, 2018-A CHW Steering Committee meeting was held. November 2, 2018 - Informal Staff Report 2018-159 was included in the Friday Staff Report. November 13, 2018-A Work Session was held to provide CHW Renovation Options from the Steering Committee. May 10, 2019 - Informal Staff Report 2019-097 was included in the Friday Staff Report. April 7, 2020-City Council awarded The Wilson Group an RFP contract to replace the windows at City Hall West. February 16, 2021 - Damage caused by Winter Storm Uri resulted in the removal of hazardous materials throughout the building. Remediation and abatement concluded in October of 2021. April 13, 2021 -City Council Work Session for rehabilitation and future use of City Hall West. Request for Information (RFI) opened August 23, 2021,to evaluate the level of interest from both for and not-for- profit organizations. Solicitation closes October 12, 2021. Staff held their Kick-Off meeting with Architexas on January 27, 2022. Architexas conducted an in-person site visit and evaluation on February 17, 2022. 10 20 Project: Conduct Parks Planning Status: Ongoing Department: Parks& Recreation Update: The Parks, Recreation, and Trails System Master Plan was presented to City Council in January 2022 for comments.The ADA Transition Plan and Southwest Parks Master plan were adopted in January 2022. Several parcels are planned to be presented to in the near future to Council for consideration. Complete Next Steps Anticipated Timeline Bowling Green Park Master Plan Selection of consultant for Briercliff Parks, Recreation &Trails System Public Meeting on 4/8/21,Approved Master Plan—5/2022. Master Plan -Adoption 2/2022. by Park Board on 8/2/21,Adopted by City Council on 9/21/21, Construction Selection of Pecan Creek Trail Master Acquire park land from Parkside documents completed,TPWD grant Plan—5/2022. Property 2/2022. submitted. Continue planning for the Villages of Carmel Master Plan - Performance Venue Plan—Ongoing. Public Meeting on 4/8/21,Approved Finalize wildlife corridor and areas by Park Board on 8/2/21,Adopted by Identify wildlife corridor and areas throughout the city—3/2022. City Council on 9/21/21, Construction throughout the city—3/2022. documents completed,TPWD grant Performance Venue Plan finalized by submitted. Present Park Dedication and 5/2022. Development Ordinance to City Southwest Park Master Plan -City Council 5/2022. Finalize Park Dedication and Council Adopted 1/2022. Development Ordinance—6/2022. Submitted offer for land acquisition Acquired Audra Oaks Property 2/2022. Complete Park Sign Plan 7/2022. 11/2021. Begin Park Sign Plan in cooperation Acquisition of 4-5 parcels by 12/2022. Acquired Vintage Village Property with Public Affairs 2/2022. 12/2021. Pecan Creek Trail Plan and Design— Assemble focus group for inclusive 2/2023. ADA Transition Plan -Adopted playground 5/2022. 1/2022. Finalized Developer Agreement with Acquired Davidson Property 1/2022. Parkside Property 2/2022. 11 21 Project: Enhance Focus on Traffic and Speed Safety Status: Ongoing Departments: Capital Projects,Traffic Engineering Update: Staff began collecting data for the citywide speed study in January 2022. Complete Next Steps Anticipated Timeline Citywide Speed Study-ongoing data Citywide Speed Study- late Summer collection in the Spring of 2022 with 2022. an anticipated Work Session to City Council later Summer 2022. Vision Zero Action Plan -Spring 2022. Signal Timing along US 380 to begin in the Spring of 2022. Vision Zero -Transportation Planning and Capital Projects/Engineering is working collaboratively to develop an action plan for the Spring of 2022. Capital Projects/Engineering, Transportation Planning and Denton Police Department all work collaboratively to address and prioritize enforcement efforts through the City. 12 22 Key Focus Area: Foster Economic Opportunity and Affordability Priority: Update the City's Comprehensive Plan Status: Ongoing Departments: Development Services Complete Next Steps Anticipated Timeline Stakeholder Interviews— P&Z Public Hearing for P&Z and City P&Z Public Hearing- February 23 February/March 2021 Council City Council Public Hearing- March 1 2 Public Meetings- 131 Community Members 1 630 comments Received Implementation of the Approved Comprehensive Plan to Follow 1 Special Topic Charrette -51 Community Members 1 850 Comments Received Online Interactive Issues and Opportunities Map- 101 Responses Online Questionnaires- 175 Responses City Council Work Session—May 18, 2021 City Council Work Session—August 3, 2021 P&Z Work Session—August 4, 2021 In-person Open House—September 16, 2021 Virtual Open House—September 16— 30, 2021 City Council Work Session— December 14, 2021 Public Draft of the Comprehensive Plan posted on dedicated website— January 8, 2022 P&Z Work Session—January 12, 2022 City Council Work Session-January 25, 2022 P&Z Work Session-January 26 13 23 Public Hearing Notice Published- February 6 City Council Work Session- February 8 P&Z Work Session- February 9 City Council/P&Z Joint Work Session- February 14 City Council Work Session- February 15 14 24 Priority: Develop an Affordable Housing Strategy Status: Ongoing Department: Community Services Complete Next Steps Anticipated Timeline December 14, 2021—City Council February 15, 2022 -City Council February 15, 2022 Work Session Presentation (ID 21- approval of a resolution of the City of 2406) Denton adopting an Affordable Housing Strategic Toolkit ID 22-090 Hiring Housing Program Coordinator (February 2022) Start the process for Year 1 Action Items early 2022 (March 2022) GIS Mapping Tool (Initial alternate In- House Plan is an option) Budget Amendment (FY21-22)to procure consultants for Affordable Overlay District(s) and Build Landlord Maintenance Grant Program out and pilot program (in progress) Funding requests for future years will be considered as supplemental budget requests through the budget process, requests for CDBG/HOME through Community Services Advisory Committee process, and seeking other funding tools where applicable 15 25 Project: Continue Implementing Economic Development Strategic Plan Status: Ongoing Department: Economic Development Complete Next Steps Anticipated Timeline 02/09/2021: City Council adopted Continue to research and begin Spring 2022 Strategic Plan drafting new programs and policies to align with Economic Development 06/07/2021: City Council Catalyst Strategic Plan. Fund Discussion Bring forward programs and policies 07/20/2021: City Council Catalyst to EDPB and City Council for Fund Discussion discussion. 16 26 Project: Review & Develop Denton Development Code (DDC) Amendments Status: Ongoing Departments: Development Services Complete Next Steps Anticipated Timeline On November 17, 2021,the DCRC Research ongoing Code amendments Amendments will be ongoing to held a meeting with newly appointed continue addressing conformity members, and an established Draft Code amendments issues and making improvements to standing meeting each month was the Code. established (twice a month, second Take complex Code amendments to and fourth Friday,from 10 to noon, the DCRC for review, input, and As Code amendments are adopted, to be held at the Development recommendation updated copies (supplements) of the Service Center). DDC are published on Municode's Public Outreach website. Similarly,the latest updated DDC(PDF) is also published on the P&Z Work Session City's website. City Council Work Session P&Z Public Hearing City Council Public Hearing 17 27 Key Focus Area: Promote Sustainability & the Environment Priority: Develop a Comprehensive Solid Waste Management Strategy Status: Ongoing Department: Solid Waste and Recycling Completed L Next Steps Anticipated Timeline March 2021-Vet and assign Focus Completion of the draft final Spring 2022 Group/Think Tank members. strategy. April 2021 -Conduct Think Tank. May 2021—Consultant to evaluate data and work to start preparing Draft CSWMS Deliverable. July/August 2021 - Present draft report to City Council, Public Utilities Board, and Committee on Environment for consideration and feedback. Incorporate feedback. September 2021- Presentation of a draft strategy document. 28 Project: Progress the 2020 Simply Sustainable Framework and Advisory Committee Status: Ongoing Department: Sustainability Update: The Sustainability Framework Advisory Committee (SFAC) met in October, November, and December 2021. On December 10, 2021, an Informal Staff report was submitted, wrapping up recommendations to date. No questions were received from City Council. Complete Next Steps Anticipated Timeline Review Science Base Target Follow up with council request for Spring 2022 recommendation and provide a list of additional information regarding a associated actions recommendation to adopt Science- Based Target for Greenhouse Gas Recommend funding plan for initial Reduction. contribution to Sustainability Fund Report SFAC priorities for July 23, 2021—Sustainability Sustainability Fund to City Council. Framework Advisory Committee recommendations Next meeting—February 2022 August 20, 2021—First ISR to City Council September 24, 2021—Review council ISR feedback and discuss sector- based High Impact Actions October 29, 2021—Review Sustainability Fund Proposals and Priorities (SFAC) November 19, 2021—Discuss Climate Adaptation Next steps (SFAC) December 10, 2021—Follow up ISR to City Council regarding Greenhouse Gas Mitigation Target Setting 19 29 Project: Evaluate a Strategy or Preferred Pattern of Preservation Status: Ongoing Departments: Development Services, Environmental Services and Sustainability, Parks and Recreation Complete Next Steps Anticipated Timeline Acquired one parcel in northeast Acquire land for future parks, open Implement TreePlotter in April 2022 Denton in January 2022 with 2019 space, and tree preservation bond funding. (especially Post Oak and Blackjack Acquire 4-5 parcels in cooperation Oak forests). with private developments by Dec Acquired TreePlotter software 2022. licensing in winter 2021. Acquire land as soon as funding is available in 2022 and 2023 from the Present ESA policy edits to Council - 2019 bond program. June 2022. Work with private developments to acquire upland and flood plain to support open space, connectivity, and recreational opportunities. Implement new TreePlotter software to identify key areas for future tree planting projects to aid in the reduction of urban heat islands and improvement of air quality. Edit the ESA policy to allow for trail development within designated areas. 20 30 Project: Expand Bike/Pedestrian Network Status: Ongoing Departments: Capital Projects,Traffic Engineering Complete Next Steps Anticipated Timeline Completed Sidewalk Workplan Developing a Bicycle Workplan to be Draft 2022 Mobility Plan adoption January 2022. presented in Spring/Summer 2022. Spring 2022. Evaluating and creating a Capital Bicycle Workplan Spring/Summer Improvement Plan to correspond 2022. with the bicycle and pedestrian needs, while evaluating the Workplans and Draft 2022 Mobility Plan Bicycle and pedestrian modes of travel. 21 31 Key Focus Area: Support Healthy & Safe Communities Priority: Continue COVID-19 Response Status: Ongoing Departments: City Manager's Office, Fire, Customer Service and Public Affairs Complete -it Steps Anticipated Ti 41 Extension of disaster declaration Monitor intergovernmental updates, Ongoing: monitor conditions of the through March 2022. including relevant orders and pandemic and provide regular legislation. reports and updates to the City Adoption of Nineteenth Order of Council. Council. Seek Council direction regarding extending the existing local disaster January 2022: Seek direction on draft declaration and future orders of Nineteenth Order of Council. Council. March 2022: Seek direction and Seek direction and act on any consider an extension of the modifications to City facilities and declaration of a disaster and any services, including public meetings, extension of mask-related that are necessary to respond to the requirements. impacts of the pandemic. Continue administration and monitoring of COVID-related grants, including eviction prevention assistance. Continue to aid Denton County Public Health and COVID vaccination clinics. 22 32 Project: Continue Development of Police Department Mental Health Division Status: Ongoing Department: Police Complete Next Steps Anticipated Timeline Launched Crisis Intervention Manage CIT Training-Sergeant Elisa Ongoing Response Team in May 2021. Howell and Program Manager Sara Gawor became certified as CIT An internal candidate was selected as Program coordinators.They also the Stability Caseworker.As a completed CIT train-the-trainer member of the Homeless Outreach course and have plans to manage CIT Team, Dr. Crystal Clark will maintain training for the department for 2022. an assigned caseload and provide support, resources, and advocacy to Onboard the selected Community individuals HOT assesses and serves. Health Paramedic selected by the Fire Department. Published Crisis Intervention General Order. Notes: Between May 16, 2021, and December 21, 2021: • 814 cases assigned to CIRT pairs • 1,487 follow-ups conducted • 169 Emergency Detention Orders (EDOs) completed • 346 active calls for service in which a clinician was present/on scene 23 33 Project: Continue Updating Police Department Policies and Training Status: Ongoing Department: Police Complete Next Steps Anticipated Timeline 600+ pages of General Orders have Continue releasing new General The remaining 37 General Orders are been released to the department and Orders. in various stages of development.All can be viewed on the City website. are expected to be released in 2022. Out of approximately 175 General Two additional ABLE trainings are Orders, 138 have been released as of planned for March 2022 after they Feb. 15. were postponed due to COVID. Instructors will receive in-service The Denton Police Department was training in February. An annual, two- accepted into the Active hour reinforcement training will roll Bystandership for Law Enforcement out for all employees later this year. (ABLE) Program in fall 2020. Chief ABLE standards will be interwoven Dixon is an ambassador for the into recruitment, selection of program.Twenty sworn and non- personnel, and all aspects of Denton sworn instructors have train-the- PD Training. trainer sessions, and 202 employees have completed the initial eight-hour Department leadership and the training. Denton PD has also trained Training Division continue to seek officers at LINT, Dallas, and other new and innovative training agencies. opportunities for the department. 34 Project: Complete Public Safety Facilities from Bond Program Status: Ongoing Departments: Police, Fire Completed Next Steps Anticipated Timeline May 21, 2019 -City Council, PSA Complete construction of Denton Summer 2022: Substantial awarded to Brandsetter Carroll Police Headquarters, substation, and Completion design efforts. firing range. Fall 2022: Construction Complete April 21, 2020-City Council Work Session for fagade alternates. RFQ- CMAR awarded to Thos.S. Byrne for construction. June 23, 2020-City Council, PSA awarded to Peak Program Value (PPV) for construction management. Amendment to PSA to Brandsetter Carroll design efforts. September 17, 2020- Presentation to Committee on Persons with Disabilities on facilities accessibility. December 17, 2020-City Council, awarded CMAR Guaranteed Maximum Price Amendment to Thos. S. Byrne for construction. January 15, 2021 - Issued Notice to Proceed, construction began. June 21, 2021 -Traffic Safety Commission, Frame/Oak St. Closure for the renovation of PD HQ. June 22, 2021 -City Council, Frame/Oak St. Closure for the renovation of PD HQ. 25 35 Project: Pursue Fire Department Accreditation Status: Ongoing Department: Fire Update: Work is nearing completion on the update of the Standards of Cover along with the assessment manual. The Denton Fire Department Strategic Plan 2025 is going through an annual review. All documentation will be submitted by the end of March 2022 to be considered for accreditation in 2022. Complete Next Steps Anticipated Timeline Continue updating the Standards of August 2022 Cover document. Complete the Quality Improvement of the Fire and Emergency Services assessment Update DFD Strategic Plan 2025 26 36 Project: Planning and Design for Fire Station #9 Status: Ongoing Department: Facilities, Fire Complete Next Anticipated Timeline January 11 -Council approved design Continue discussions between Winter 2022: Design Commences contract with Parkhill. Facilities, Fire, and Procurement. December 2022: Construction Begins January 13 - Design kick-off meeting with stakeholders. August 2023: Fire Station Fully Operational 27 37 Key Focus Area: Strengthen Community Services and Quality of Life Priority: Continue to Strengthen Homelessness Initiatives and the Housing Crisis Response System Status: Ongoing Department: Community Services Next Ste 0=1111MAW110ked Timeline Hired Homeless Programs Ensure that current projects and the While priorities may change,there is Coordinator. substantial investment from federal no end date on this initiative. funds is fully leveraged, managed, Presented Homeless Strategies to and implemented successfully Loop 288 (in other Section) City Council in November of 2021. o Construction and Implementation of 24/7 center Affordable Housing Strategy Toolkit CSAC next Steps Strategic Planning on Loop 288 (in other section) o Continue Affordable Housing Strategy Toolkit and RFI Implementation o Due: March 1, 2022 o CC Presentation April 2022 Enhancing housing services o Tiny House RFI Evaluating Funding Priorities (CSAC) Work with partners in collaboration to maximize emergency funding while available, including the second installment of ARPA in Summer 2022 o ARPA HOME Funds Grant Process o ARPA Nonprofit Capacity Grant o ARPA Behavioral Health Grant ARPA Expansion of Street Outreach Team 28 38 Project: Develop the 909 N. Loop 288 Building as a 24/7 Center Status: Ongoing Department: Community Services Completed Next Steps Anticipated Timeline CMAR GMP Contract Amendment— Complete construction of 288 Substantial Completion— 10/2022 11/2021 facilities. Operational—12/2022 Construction Start—11/2021 Listing of Prior Actions: • On April 21, 2020, City Council authorized the City Manager to enter into a contract for the purchase of the property at 909 North Loop 288 for the purchase price of$5,200,000.00, authorizing the expenditure of funds in the cash amount of$3,395,000.00 towards the purchase price and accepting the donation value of the property from the seller of$1,805,000.00. (Ordinance No. 20-837) • On June 16, 2020,the City Manager signed the Second Amendment to the Contract for Sale, extending both the Absolute Review Period and the Closing Date. • On June 23, 2020,the City Manager signed the Third Amendment to the Contract for Sale, again extending the Absolute Review Period and the Closing Date. • On June 30, 2020 (Ordinance No. 20-1235),the City Manager signed the Fourth Amendment to the Contract for Sale to allow the current owner to address the City's concerns and for the owner to compete for remediation of issues including: o all leases shall have been terminated and tenants shall have vacated the property. o all roof repairs needed on the Property shall be completed, and o asbestos remediation of the Property shall be completed. inspected and reported. • On August 28, 2020,the City took ownership of the facility. • On Oct. 6, 2020, City Council approved a professional services agreement with Kirkpatrick Architecture Studio for the design services of 909 N. Loop 288 to renovate the facility and accommodate the proposed use and day- to-day operations (Ordinance ID 20-1951). • On Nov. 10, 2020, City Council adopted an ordinance to change the zoning district and use classification from Suburban Corridor (SC)to a Public Facilities (PF)Zoning District for this property(ZC120-0001). • On Feb. 16, 2021, City staff presented to City Council in a work session an overview of key terms for a draft Management Services agreement with The Junction and a project update (ID 21-056). • On April 05, 2021, City staff presented to City Council in a work session regarding the proposed design, construction budget and timeline, and construction method for the 909 N. Loop 288 facility and a general project update. • On June 22, 2021, City Council adopted an ordinance to execute with Our Daily Bread, Inc., a Management Services and Operating Agreement to manage and operate the facility located at 909 N. Loop 288 and to execute with Our Daily Bread, Inc., a Termination Agreement providing for(1) the termination of the lease for 300 S. Woodrow Lane and (2)the extension and termination of the agreement for enhanced shelter services provided at such leased property effective concurrent with the agreement start date to commence on the thirtieth (30th) day after the Loop 288 facility is issued a certificate of occupancy. 29 39 Project: Consider a Non-Discrimination Ordinance Status: Ongoing Department: Human Resources Complete Next Steps Anticipated Timeline Sept. 14, 2021 (Work Session) Council consideration of the adoption Winter 2022- Public Input Reviewed research and NDO of the ordinance in Spring of 2022. components and received Council Spring 2022 -Consider Adoption of direction an Ordinance Sept/Oct 2021 - Drafted an NDO Nov. 9, 2021—(Work Session) Presented initial draft NDO and sought policy direction. Jan. 4, 2022 (Work Session)Affirmed policy direction and next steps, including public input Educate and gather public input on the draft Non-Discrimination Ordinance, including holding a public hearing on Feb. 15, 2022. 30 40 Completed Projects rojectM� epartment Complete Next Steps Implement Police Police In 2021,Advisory Board meetings I The board's next meeting is Chief Advisory Board were held on June 30,July 28,Aug. scheduled for Feb. 23. Members will 11,Aug. 25, Sept. 29, Oct. 27, and meet at least quarterly in 2022. Nov. 17.These meetings focused on training board members,who will advise and issue recommendations to the Chief of Police in future meetings. Implement Historic Development October 22, 2019 (City Council) n/a Preservation Plan Services September 18, 2019 (Planning and Zoning Commission) September 16, 2019 (Historic Landmark Commission) Complete & Launch Public Affairs I Website migration occurred over n/a new City website Summer 2021. 31 41 • • City of Denton li e Emergency Management l)F Denton Fire Department D ENT O N FOR OFFICIAL USE ONLY Situation Report Event Name Winter Weather 2022 February Date February 23, 2022 Time 15:00 Operational Period 0730 - 1700 Report Number 01 EOC Activation Status Level 4 CURRENT SITUATION A Winter Storm Warning is in effect through Thursday from the Dallas/Fort Worth Metroplex northward to the Red River. Sleet and ice accumulation will result in hazardous driving conditions. A Winter Weather Advisory is in effect for the remainder of North and Central Texas. Road conditions will steadily deteriorate tonight into Thursday. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 1 42 Winter Storm Warning&Winter Weather Advisory weather Forecast office Fort Worth,TX Road conditions will deteriorate through Thursd.iy Issued Feb 23.2022 32:59 PM Cs7 Winter Storm arum g 41Ytpacts:Widesprcadtravelproblem �� �� ;are likely due to ice and sleet � Corsicana `Hillsboro ,#- accumulations. RAIN n. exl alestlr�i •Waco Winter Weather Advisory- � " �'` � � Impacts:Slick spots,especially on �� � �ntervine - bridges,overpasses,and elevated Lam • f�•NWSFort Worth weather;ov/fwtwort Weather Forecast office Expected Impacts and Timing Fort worth.Tx Wednesday-Friday Issued February23,20229:12AMCT • Conditions will deteriorateWednPill esdayeveningwRhwidespreadimpadscontinuinginto .+ Thursday morning. • Give yourself extra time for yourcommute!Change/alter travel plans. Wednesday Thursday Friday r. DFW Metro lex � P � WorstTravelCondi[ions � iconditions Sherman-Denison spottylcins � Icy Roads ' x into ftefreeze t ' g Lin eriR slick Graham Mainly Elevated j Icingof[rees/powerlines � Improve 5 Ots causes some power t Stephenville Roads&bridges � outages j warming.up t r above lreezing Waco-Killeen-Temde i i spouy�g r_ Palestine Wet Rods 5 cin Prepare for Potential Impacts&Continue 7o Monitor your local forecast aiawaean aa•ea•reraat KAI weather.gov/fo two di City of Denton Situationep FOR OFFICIAL USE ONLY • Weather Forecast Office Outlook Through the Weekend Fort TX Multiple roundsofwinter weather antex Issued February e — Winter Storm Warning Lightfreezing ruin/drizzle and sleet FREQI Winter Weather Advisory RAIN th rough Thursday Wednesday Temperatures in the 20sI sleet/ice accumulation Wind chill values in the teens deteriorating road conditions Heavierfreezing rain and sleetRAIN SLEET Thursday Temperatures in the 20s and I Wind chill values in the teens '.:777 Rain and ligh t win try mix Friday Laws in the teens and at« I Highs in the r Light wintry mix then rain WINTRY Saturday Lows in the MUf_ 20s and 30s Highs in the 40s Clearing skies and milder Sunday I 1 Highs in the I 11TtV111r III Department Updates and Preparations Solid Waste — Commercial Front load is completed (had one truck lose traction and hit a retaining wall. Vehicle damaged, no injuries) Roll-off Collections — less than 5 containers to be collected. Calling customers to determine collection need and if we can defer collection until later in the week Residential collections—approximately 50%complete We believe that it is in our best interested to curtail the remainder of today's (Wednesday's) collections and resume Wednesday's collections tomorrow afternoon (when roads clear.) Thursday Collection would be moved to Friday(a.la. Holiday shift schedule). Parks and Rec —winter preparations have been made. Public building sidewalks, parking lots will be sanded. Working to prep MLK Rec Center for possible use as an 24/7 Shelter to open at 18:30. All shelter supplies have been delivered. DME— Everything is good to go, no forecast of power shortages or outage due to storm. Community Services—working with community partners on sheltering of homeless. MKOC— 12 guest (6 females/6 males) Salvation Army - 13 guest (7 females/6 males) PIO — A communication group has been established to coordinate messaging from the various City Departments, via social media. A content schedule has been planned starting today thru Friday. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 3 44 CMO — City offices have closed at 1500 today and will be closed tomorrow (Thursday, Feb 24, 2022). Email has gone out to all Department Directors and staff. Police/Fire—Since 05:00 responded to 51 motor vehicle accidents. 24/7 Emergency Shelter MLK, Jr. Recreation Center(1300 Wilson St.)beginning at 18:30 on Wednesday, Feb. 23rd. The MLK, Jr. emergency shelter will be operated by the City of Denton and is available to any person in need of refuge due to the hazardous weather currently being forecast. This may include stranded motorists, residents that have lost electricity or other critical services in their homes, or persons experiencing homelessness. Call Schedule Thursday, Feb 24, 2022—Winter Weather Update (Emergency Management) at 10:30 Thursday, Feb 24, 2022—Winter Weather Update (Emergency Management) at 15:00 *All calls to be done via Teams* City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 4 45 A51130 90tAk City of Denton Emergency Management CITI' ()F Denton Fire Department DENTON FOR OFFICIAL USE ONLY Situation Report Event Name Winter Weather 2022 February Date February 24, 2022 Time 10:30 Operational Period 0730 - 1700 Report Number 02 EOC Activation Status Level 4 CURRENT SITUATION Areas of light freezing rain and freezing drizzle will continue across the region this morning, and end from west to east this afternoon. Icing of roads and bridges will continue to be a problem today. Most areas will warm to near or just above freezing this afternoon. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 1 46 Winter Storm Warning&Winter Weather Advisor We a ther Forecast Othce Y Fort Worth,TX Road conditlons v✓ill deteriorate later tonight through the Thursday morning corn mute Issued Feb 212022 7:20PM CST • • Bowl - Winter Storm Warnin Jacksbor - Impacts:Widespread travel problems are likely due to j significant ice and/or sleet accumulations. Winter Weather Corsican illsboro 't' Advisory , Impacts:Slick spots,especially Hamllton -. Mexia on bridges,overpasses,and -Waco elevated surfaces from ice and V k� sleet. entery Ile Lampasa Hearne s..o.�.w,..nas,r.•..n,�..•.rx�.r.mrmn t•oc/%+non««��rs u..rT.,,,.. Weather Forecast Office Freezing Precipitation Ending From West to East Fort worth,Tx 1 Thursday Issued February24,20224:58AM CT Morning Early Afternoon Paris Freezing rain ,,,,Gainesville G swtlle' Paris with light Ice Graharn Gi-ah m accumulations UI W Freezing rain areawidel Cisco '. endingfrom west D _ to east K Hazardous - Palestine Palre travel! �Waco tn(aco 5 Ita el.en Freezing rain en changing to rain Temperatures:20s I'Temperatures:Mid20s to lower 30s Late Afternoon), ! Key Messages Drying outl F""• arfs • Freezing drizzle this morning areawlde. Game lie I and hazardous travel,especially bridges and overpasses. slow erosion and ' Icy P� Y 8 erpas melting of the ice G• Freezing precipitation ending from west to east late morning with improvements D - through mid afternoon. 9—improvement to roads occurs this often—ide after o travel conditions. _ - precipitation ends and temps warm above 30degrees. Q�legtirrr } WhaVsChanged? 1 � Fleezingrain Lighter ovrerallamountrofice are expected.but still roads will be changingtorain hazardous this morning into eadyafternoon. ern - With less precipitation,aslow improvement of icy roads may continue overnight as ice erodes and dries up even if temps are Temperatures:Lower to mid 30s below treezing. f 0 NWSFortWorth weather ovlfortworth Late Frida Ni ht into Saturda Mornin weather F°'e`a5`Office y g Y g Fort Worth,TX One Last Round of Wintry Weather iswee Feh za,zoz2 a zo ann csT Awintrymixoffreezingrain �' and possibly lightsnowwill , impact areas mainly north • �� �'�r 34°` and west of the Dallas/Fort Worth Metroplex. Little to �- - erman no accumulation is expected. ��� � 330 OLDI � but motorists should � �, continue to exercise caution. Denton .'.• 3rJ° Greenville �,:• �34� Dallas 35oij Canton Tcmperatureswillriseabo�� �ephenville'��So 38 freezing regionwide by late Corsicana 380 32° Hillsboro morning,and rain will prevail ° 37° Saturday afternoon and 39 Palestine �JAmIIto n M cx is evening. �'" Waco COLD! 380 37 Centerville Lampasas Tcmplc 39° • Hearne lowtemperatures • are shown ..m.-,�..,..�-, ,n..n�rxxvw..m.i•aw�mx/.r•m x..n.nrs n..r.,,,, TimingGeneral Ending • of 1 to East TX &West of 1-35W Noon MldrJght Noon FridayThumday Friday City of Denton Situation •• FOR OFFICIAL USE ONLY ■ Department Updates and Preparations Solid Waste—supervisors out this morning assessing road conditions and they have deteriorated to such a condition that the ability to maintain the safety of our crews and equipment is questionable. Based on existing conditions and forecasted freezing rain, and in an abundance of caution, SWR has decided to cancel today's(2/24/22)scheduled collections and close the landfill. We will reopen on Friday, February 25 and work to complete all collections that day. Parks and Rec— MILK Jr. Recreation Center Overnight Shelter • 4:30PM-Shelter operations set up and ready to go. 10 people already using the warming station at MLK, staff checked them into the shelter • 6:OOPM-staff served dinner to 15 guests. • 8:OOPM-Guest count is 13. No issues to report. • 8:OOAM-Guest count is 15 (2 female, 13 male).The shelter was quiet overnight. One guest was brought over from a local hospital who had been treated for smoke inhalation, staff is checking on him periodically. No issues to report. Parks Maintenance • PM staff have continued to sand City Facilities that are still in operation, Fire Stations, PD, DME, Warming Stations. DME— No system outages last night. ERCOT grid had no issues either and they are reporting that there is plenty of generation to meet demand today. No staffing issues but we are conducting training this morning for our field personnel to keep them off the road and will reassess at mid-day. Library Warming Stations - Yesterday, seven people use the Emily Fowler Central Library as a warming station from 3-6 p.m. Three of the people were already in the library using computers and internet when we switched to warming station only. No incidents or issues. Community Services—working with community partners on sheltering of homeless. M KOC—83 total (11 females/72 males) and 10 pets Salvation Army—26 total (10 females/16 males) PIO—Continued sharing information on social media • Continued coordination with departments and messaging. • Published news flash regarding 2/24 closings. • Responded to 3 media inquiries. CMO — City offices have closed at 1500 today and will be closed tomorrow (Thursday, Feb 24, 2022). Email has gone out to all Department Directors and staff. Facilities - Runway condition monitoring and pavement temp. checks. Runway/Taxiway deicing application. Public Works - Traffic is also monitoring the intersections and directing crews to hotspots. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 4 49 DATE: 2/23/2022 TOTAL SHIFT: 12a-8a 8a-4p 4p-12a Yrds3: 5.25 0 5.25 TONS: 7.875 0 7.875 LOADS: 1 1 ICE MELT: 6 6 DATE: 2/24/2022 TOTAL SHIFT: 12a-8a 8a-4p 4p-12a Yrds3: 57.75 0 0 57.75 TONS: 86.625 0 0 86.625 LOADS: 11 11 ICE MELT: 0 24/7 Emerj!ency Shelter MLK, Jr. Recreation Center(1300 Wilson St.)beginning at 18:30 on Wednesday, Feb. 23rd. The MLK,Jr. emergency shelter will be operated by the City of Denton and is available to any person in need of refuge due to the hazardous weather currently being forecast. This may include stranded motorists, residents that have lost electricity or other critical services in their homes, or persons experiencing homelessness. Call Schedule Thursday, Feb 24, 2022—Winter Weather Update (Emergency Management) at 10:30. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 5 50 A51130 90tAk City of Denton Emergency Management CITI' ()F Denton Fire Department DENTON FOR OFFICIAL USE ONLY Situation Report Event Name Winter Weather 2022 February Date February 25, 2022 Time 10:30 Operational Period 0730 - 1700 Report Number 03 EOC Activation Status Level 4 CURRENT SITUATION One final round of light wintery precipitation is possible late tonight (Friday night) into Saturday morning. Freezing rain/drizzle and perhaps a bit of sleet may occur. It is unlikely that surface roads would be impacted. All temperatures should climb above freezing by late morning which would bring an end to any possible impacts due to wintery precipitation. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 1 51 Not as Cold Toda I weather Forecast Office y• Fort Worth,TX Issued Feb 25,2022 4:53 AM CST Some sunshine returns toda >' which will allow afternoon Y 360�� 40° ° highs to climb into the 40s for Sherman Paris most locations. 37�3owie 41° 44° A north wind of 10-15 mph lacksboro Denton ,� as^ will prevail. 43° �° Greenville a Fort Dallas 44° '° 38° Worth on o ~ Cisco 41 44° r Stephenville 42° I fi 44° Hillsboro C42ona 43° as • Hamilton 43° Palestine Mexia warn 41° '' Centerville � Lampasas Temple 42° Hearne -3s° f� �NWSFort Worth weather.gov/fortworth ea er orecas to Saturday: Rain Chances Return Fortwortn,Tx A wintry mix possible in the morning Issued February 25,20222:21 AM CST Saturday Morning Saturday Afternoon •lght rain/drizzle is possible during the predawn hours Rain chances wifl increase during the afternoon especialty which wi continue after daybreak. across central and East Texas. •Some parts of North Texas may be cold enough m aflow 7 /•Rain will be the most common predpnaUon, but some sleet for a brief period of fneezinq ram/drizrle.A few sleet r PeUets cannot be ruled out. peflets are also possible. •Temperatures will warm several degrees above freezing •Minimal impacts are expected with temperatures and no impacts are expected. expected to dmb above treerinq eady in the day. Bowie �.� Paris Bowie � Paris Graham 25 31 Graham 39 42 2� DFW Ca34 n 39 42 Cag2 n� Stephenville Stephenville � 29 Palestine 40 Palestine � Waco 36 � Waco 43 Killeen ^� Killeen 34 42 `'*.�`` Morning Lows `��ARernoon Highs � tJWSFortWorth weather. ov/fortworth City of Denton Situationep FOR OFFICIAL USE ONLY • Mainly North of 1-20 &West of 11-35W R7�_ Noon Midnight Noon Midnight Friday Saturday Saturday Sunday Department Updates and Preparations Solid Waste — Collecting both leftover Wednesday route and Thursday routes today. Commercial collections back to normal schedule. Parks and Rec— MLK Jr. Recreation Center Overnijzht Shelter • 2PM—Guest count is currently 23.Two shelter guests received medical care from EMS and one was transported to the hospital. • 5PM—Guest count is 21 (3 female, 18 male). • 6:OOPM-dinner was served. Guest count 24 • 9:OOPM-Guest count 21 . No issues to report • 10:OOPM-Guest who was brought in from hospital earlier was complaining of not being able to breath. EMS was called. Guest was not transported 2 25 22 1:30AM- EMS was called again for the same guest. He was again complaining of not being able to breath and requested to be taken to a hospital. He was also not able to hold his bowels. EMS transported guest. • 4:OOAM-Quiet, no issues to report. • 5:30AM-Current guest count 21 Parks Maintenance • PM staff have continued to sand City Facilities that are still in operation, Fire Stations, PD, DME, Warming Stations. DME— No system outages last night. ERCOT grid had no issues either and they are reporting that there is plenty of generation to meet demand today.No staffing issues but we are conducting training this morning for our field personnel to keep them off the road and will reassess at mid-day. Library Warming Stations-We had a total of 17 people at the Emily Fowler Warming Station yesterday. Everyone was gone by 8:15 p.m. There were no incidents. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 3 53 Community Services—working with community partners on sheltering of homeless. M KOC—82 total (12 females/70 males) and 10 pets Salvation Army—27 total (11 females/16 males) PIO—Continued coordination with departments and messaging. CMO—City offices will be operating at normal work hours 0800-1700. Facilities— Back to normal operations. Public Works - Traffic is also monitoring the intersections and directing crews to hotspots. Totals TOTAL SHIFT: 12a-8a 8a-4p 4p-12a Yrds3: 57.75 52.5 15.75 126 TONS: 86.625 78.75 23.625 189 LOADS: 11 10 3 24 ICE MELT: 0 0 6 6 Totals TOTAL SHIFT: 23-Feb 24-Feb 25-Feb Yrds3: 21 105 0 126 TONS: 31.5 157.5 0 189 LOADS: 4 20 0 24 ICE MELT: 6 0 0 6 24/7 Emergency Shelter City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 4 54 MLK, Jr. Recreation Center (1300 Wilson St.)will close at 12:OOpm today. Call Schedule No calls scheduled for today. City of Denton Emergency Management Situation Report FOR OFFICIAL USE ONLY Page 5 55 TransparencyStars The Texas Comptroller of Public Accounts awards the City of Denton the Contracts & Procurement Star for exemplary efforts in creating financial transparency around public spending in this area. The Transparency Stars program recognizes local governments across Texas that are striving to meet a high standard for financial transparency online. These efforts provide citizens with clear, consistent information about public spending in user-friendly formats. s'Parencys��� 0 0 dctSandProc�� February 23,2022 56 TransparencyStars The Texas Comptroller of Public Accounts awards the City of Denton the Economic Development Star for exemplary efforts in creating financial transparency around public spending in this area. The Transparency Stars program recognizes local governments across Texas that are striving to meet a high standard for financial transparency online. These efforts provide citizens with clear, consistent information about public spending in user-friendly formats. a�s'P y arenc�� ev February 23,2022 57 I-1 Issue I■I �IJ -1 40 IL 0 ap� ■ , February 2022 tu �• pOL/CE �_— OtN10N .n _ p0�ICE pENTO1� SINCE 1873 The P10 POST Quarterly Newsletter From Your ADLIG�t. Media Relations Denton dispatchers deliver two babies just days apart It is not every day that a dispatcher coaches a husband all the way through a birth, resulting in a baby born and crying. It is certainly out of the ordinary for this to happen days apart. Two of our very own dispatchers, Nichole Figueroa and Michaela Mason, were awarded late last year for delivering babies over the phone only days apart. This January, Media Relations reached out to 1 both families to see if they would be willing to provide an update. Both families said yes, _ and expressed a desire to meet the dispatcher who talked them through one of the most important moments of their lives. DTV's Zach Ashcraft did a fantastic job covering this story and creating a touching video of the two meets. You can watch by ee„r. scanning the QR code below. . =r< Watch dispatchers and families meet in DTV's "A Tale of Two Births"video. I 1 - www.cit com ...... enton.com Quarterly Highlights • • - •• •ht E Shoutouts and Commendations Internal Blotter 0 New Employees E Upcoming Efforts and Training QUARTERLY HIGHLIGHTS >>> I DEA Drug Take Back On Oct. 21, Denton PD and Medical City Denton teamed up for I the second year for the DEA's National Drug Take-Back Day. Due v Medical City to Detective MooneyHam's funeral, we asked the Texas Woman's Imaging I Denton University Police Department to help collect medication. We deeply appreciate MCD PIO Dana Long, TWU Police Chief Sam Garrison, and the officers who stepped up to help. W&CON Ow - _ - ShopmWithmAmCop I ' Dec. 14 marked the 29th year that Denton PD has had the privilege of participating in the annual Shop with a Cop event. This DPOA-hosted event sponsored 95 kids this year, ensuring they would all receive gifts Christmas. We are incredibly grateful for the DPOA, and all of the generous donors who made this happen! MooneyHarn Swim Meet On Nov. 13, Denton PD employees attended Skylar MooneyHam's first swim meet of the year. The MooneyHams , were also recipients of a gift drive this Christmas, and were AA _ invited to (and attended) our internal winter event, Winter Fest. Please continue to keep the MooneyHams in your thoughts, and be a support system to them as we continue to share important I 'a L ENTO dates for their family. ►' 1 Coats for Kids ' S On Dec. 20, our Denton Summer Youth Program, - SROs, and CPAAA volunteers met at the Golden Triangle Mall to collect new coats and shoes for kids in Lill�. need. We appreciate the hard work of these groups to A;z�, °" "''• keep our local students warm this winter! � � � � 11 • • 1 1 • 11 • • 1' 11 1 1' • - •• •-• • • • • :11 • • • • -• ,••, so Catalytic Converter Thieves Caught! While patrolling the perimeter of the Ryan High campus on Dec. 2, Officer Hodges caught some catalytic converter thieves in the process of cutting a catalytic converter off a DISD employee's truck near the bus barn. Officer Hodges detained the three individuals, and Detective Stevenson, Sgt. Carr and Detective Padgett came to the scene to interview the trio. Denton PD and other agencies have been plagued by these thefts in recent months, so crime analysts were looped in as well, and sent out a bulletin to neighboring agencies about the three arrests. Aggravated Robbery Suspect Arrested On Dec. 10, and while working a stolen vehicle case, Detective Millican intuitively checked the area of N. Ruddell and located the vehicle. It had been discussed amongst detectives that this specific vehicle might be found in the same area it was stolen from, as the suspect had suggested to the victim he may return to the area. Once the vehicle was secured, Detective Millican utilized the abilities of Forensics Manager Mike Kessler and discovered evidence inside the vehicle implicating a male suspect in a robbery. Detectives W. Laughlin and Weier located the suspect walking toward a local pawn shop in an effort to pawn a rifle, which turned out to be stolen from a recent burglary in the neighborhood as well. The team served a search warrant on the suspect's residence and located further evidence of his crimes. The suspect was arrested on multiple charges. In addition to those listed above, thanks go to Detectives J. Laughlin, Bailey, Potts, Field, Pizana, and Sgts. Simmons and Salas. QUARTERLY SPOTLIGHT>>> Officer Pattrick Selby On Nov. 7, 2021, Denton Public Safety Communications received a welfare concern call. The woman on the phone was concerned about her daughter being stranded at the bus stop at the Exxon on Bandera Street. Her daughter was homeless according to the caller, and was struggling. The caller was just trying to get her daughter home. Ofc. Selby was assigned the call. Ofc. Selby located the daughter, Ms. Terry who was struggling with getting her bus ticket replaced. Ofc. Selby took over speaking to the bus company, and he was able to get a ticket re-issued for Ms. Terry. While talking with Ofc. Selby, Ms. Terry shared that she l was also concerned because she had no funds, had not eaten for a couple of days, and did not have the required face masks for travel on the bus. Ofc. Selby gave Ms. Terry his packed lunch, several face masks, and some money for the trip home. He later learned that she made it home safe. Ofc. Selby did nothing to draw attention to his actions. Dispatch saw his comments and let his supervisors know about his touching act of kindness. Ofc. Selby is an exceptional officer, and this is not the first time he has done something of this nature. This unsolicited act of kindness from one person to another is an outstanding demonstration of Ofc. Selby's commitment to the Denton community. His actions reflect what is best about the Denton Police Department. Ofc. Selby should be commended for this performance. He is an excellent example to all of us. (Information above provided by Lt. Summitt) SPECIAL RECOGNITION >>> . . . . ... . . . . t, a SHOUTOUTS >>> COMMUNITY COMMENDATIONS >>> Officer Balogun: Traffic, Downtown, and C Shift made over 25 arrests last night.8 of those arrest came from DWIs, and a majority of the DWIs _• • _ • • • ,•• • _ • • came from crashes(we had crashes all over the city, all night long).The jail ran out of space, blankets, and bed rolls.At midnight we started • • • "•- •• • • having to call other night shift officers to see if they could come in and • - •• • • • •- work, due to call load. Even with the extra help we were still unable to _•• _ _ •_• _ • _•_ _•• • _ • get anyone transferred to County during our regular shift. Officer Balogun,who graciously came in around midnight to help us out, • •• • • • • • • volunteered to stay even later than planned to take all the transfers he •• •"• • - • •" "• • could over to county. He is a hero so make sure you let him know when •- • • - • • • you see him. • • • •" • • • • • •• Officers Desai and Serna: I want to personally thank Officer Desai and Officer Serna for coming in and helping us handle the large call load, even when they were not scheduled to work. Shout out to CID and CSI who responded more than they probably had hoped and even after that • • • • • •• stuck around to help us out on a couple other calls when we did not -• ' • • - • • - • have enough officers to cover. I also want to thank UNT for helping us •- • • • •• off with the fight on Fry Street. Ya'IIs help was greatly appreciated!!! • .•• • -• Lt. Hildebrand: Just wanted to give a shoutout to Lt. Hildebrand. I asked him on short notice the other day if he would allow a UNT student to interview him about road rage for her final project. He agreed, and while most everyone"wings"student interviews, Lt. • • • • • • Hildebrand took the time to do research on what she might ask him, •"•- "• • - • • • • and prepare a bulleted list of points he could share with her on the 1 • • topic. His preparation was very apparent to both myself and the _• _ • •_ • • _• • •_ • student,who was very grateful for how well the interview went! SRO Team: We were lucky to have the assistance of the SRO team • • • -• - • • due to school closures today. We answered 174 calls on Day _ •- _••- -• • • • •• Shift. We would have been overwhelmed without their help. Much • •• • _ • _ • _ • gratitude to the SROs and Lt. Mays and Sgt. Bradford for hitting the streets and helping us handle business. a 1 • M. • • - _'A3 'A3 m'13 • ' • • • • '�$ ' _'t _4! 1� 't A _ Now Available: 2021 Annual Report The Denton Police Department 2021 Annual Report was presented to ❑� 'Xrw?� +#❑� City Council on Feb. 15, and it is now live on www.dentonpolice.com. :K You can also scan the QR code to view the document. The Media CE Relations Unit would like to thank everyone who provided information and photos for the report—we couldn't do it without your help! 62 Dates to - - - - - Remember Friday, Feb. 18: Cocoa with a Cop on the Square (South Side) from 3:30 to 5:30 p.m. Saturday, March 19: Civil Service Test. If you know anyone interested in starting a --- career in policing, or officers wanting to laterally transfer, your referrals are always appreciated. Saturday, April 23: Denton Red • -. - - • . - • • . • •- • • • • - Bud Fest • . Citizen Police Academy Returning! . , Denton PD-Citizen Police New Community Resource Officer Gina Whitson, in partnership with our CPAAA Academy volunteers, has been hard at work preparing for the first CPA class in over a year. we are happy to announce that we are There is still time to register, so if you have come into contact with any residents accepting applications for our Spring 2022 wanting to get more involved at the police department, please refer them to Ofc. CPA Class! Whitson. Family members and friends of police employees are permitted to apply as Monday Evenings well. All of our amazingCPAAA volunteers are graduates of this program, so our 6:30pm-May16. 9 p g Feb.2(.2022-May 113.2022 department greatly benefits from having a high attendance rate for the CPA. DENTON PUBLIC SAFETY TRAINING CENTER The academy will take place on Monday evenings from 6:30 to 8:30 p.m. beginning 719 F.HICKOR=ST.DENTON.TX Feb. 21 until May 16, 2022, in the Denton Public Safety Training Center. Learn more or apply at http://dentoncpaaa.org/cpa/. Name Title Start Date Lauren Cook Public Safety Dispatcher Nov. 1 Joanna Garcia Jailer Nov. 1 Rebecca Murphy Public Safety Dispatcher Nov. 8 David Denman Field Training Nov. 15 William Happ Field Training Nov. 15 Gina Kuhn Field Training Nov. 15 Rawley McKinney Field Training Nov. 15 Sean Wooley Field Training Nov. 15 Nicholas Ware Public Safety Dispatcher Nov. 22 Chelsye Hogan Records Technician Dec. 6 Greg Trotta Records Technician Dec. 13 Brittany Webber Records Technician Dec. 13 Marissa Landeros Jailer Dec. 14 Sharla Dollins Lead Crime Scene Investigator Dec. 20 Alberto Valbuena Public Safety Dispatcher Dec. 25 Kyle Gray BPOC - Recruit Dec. 27 Kevin Kuykendall BPOC - Recruit Dec. 27 Tiffanie Nash BPOC - Recruit Dec. 27 UPCOMING TRAINING >>> % REMINDER! Training You now have a wide range of classes available to you for FREE at https://olt.r)oliceoneacademy.com. Please contact Sgt. Beckwith List of FREE Intermediate courses on Police One Academy: Legal ... - TCOLE Intermediate0: TCOLE Intermediate Asset Forfeiture- 3255 TCOLE IntermediateA. TCOLE Intermediate40.: TCOLE Intermediate Cultural Diversity—3939 TCOLE Intermediate • Intermediate Identity Crimes—3277 TCOLE Intermediate • IntermediateIntermediate Special Investigative Topics—3232 TCOLE • Intermediate Missing and Exploited Children —3275 TCOLE Police Skills and Tactics-Block 1 (Tuesdays) https://dentontraining.com/Training/courseDetaii.aspx?courselD=402&ext=False Police Skills and Tactics—Block 2 (Mondays) https://dentontraining.com/Training/courseDetaii.aspx?courselD=401&ext=False Fireproofed Leadership Training—Pete Havel—Author of"The Arsonist in the Office" (1 Free Seat) March 14, 2022—8 Hours $175 Fundamentals of Report Writing—Street Cop Training March 21,2022—6 Hours $149 *Supervisors, please refer any of your officers who could benefit from this training.* Leadership for Front-Line Supervisors—Advanced Police Concepts April 11— 12, 2022— 16 Hours $259 Excellence in Training—Brian Willis—(2 Free Seats) April 25—29, 2022 $595 Texas Case Law that all Cops Need to Know—Street Cop Training—(2 Free Seats) May 19, 2022—7 Hours $175 Scenarios and Tactics for the Field Training Officer—Calibre Press- (2 Free Seats) July 25—26, 2022 �359 Nam" �- /_ el ' L �, •p -0 ••0, i F' r f" .. °!�_•i � .ma's j �\ • i 1 XAS DEPART-MENF OF PURIi, TRAINING OPERATIONSDIVI r .� FITNESS WELLNESSUN/T AC A -C 41� AS Qy n �•►• Cam" k �V _- AW � .I\ - f { Contact Media Relations Media Relations Hotline: 940-349-8558 dentongd.mediarelations(a)citvofdenton.com Allison Beckwith: Cell -940-535-8230 • • - o`� �otra.a��''^ Amy Cunningham: Cell -940-535-8231 • • • - • Notice of Claim Form JCT�The Notice of Claim form must be filed within 90 days of the injury or property damage with: f Risk Management D E N T O N City of Denton 601 E.Hickory, Ste.A Denton,Texas 76205 RiskManagement(a,CityofDenton.com Fax(940)349-7803 Complete the below form in its entirety. An incomplete form may cause a delay in the processing of your claim. Full Name: Phone Number: Mailing Address: Email Address: City: State: Zip Code: The TOTAL amount of your claim against the City is $ Please provide two(2)fully itemized estimates and/or bills,photographs,medical reports,police reports. If applicable fully itemized estimates of damages and/or repairs. Was anyone injured?❑ yes no Provide the specific details of your claim against the City. Describe in your own words where, when, and how the damage or injury occurred. Provide the name, address and phone number(s) of other(s) involved, or witnesses of the incident, if known. Please provide a complete description of the damaged property including brand name, make/model, serial number, date of purchase, purchase cost, etc. Date: Approximate Time: F-1a.mllp.m. Location: 66 NOTE: IF DAMAGE IS TO PROPERTY OR AN APPLIANCE, IT SHOULD BE PRESERVED AND AVAILABLE FOR INSPECTION. Were there any witnesses?❑yes no If yes,please list name, address, and phone number(s). Has this incident been reported to a City employee or department?❑ yes no If yes, please provide the name of the employee or department: Has the Police Department been notified? yes ❑ no Report#, if available I, , do hereby file a claim with the City of Denton for damages incurred to my property and/or person. I understand and acknowledge that the receipt of a Notice of Claim form against the City is not an admission by the City of liability for the alleged damage or injury, nor is it a promise to pay for the injury or property damage. I understand that my claim will be received by the City of Denton's Risk Management Team for investigation. I further understand that the City of Denton does not have liability insurance and a determination whether the City will pay my claim will be based upon applicable laws, statutes, regulations, City standards of service and/or City ordinances and the facts surrounding my claim. The City of Denton's Risk Management Team will contact me directly as to the disposition of this claim. ALL OF THE STATEMENTS MADE IN THIS CLAIM ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. Date: Signature of Claimant: Acceptance of this claim form is not an admission of liability.Your claim will be thoroughly investigated and a determination will be forwarded to you upon completion of this investigation.Our goal is to complete claims investigation within 30 days of a claim being presented to the City;however,time frames will vary greatly depending on the claim presented.Please note that the City of Denton holds immunities for some types of damages or injuries granted by various State and local laws.A few examples include: Texas Civil Practice and Remedies Code,Chapter 101(Texas Tort Claims Act) 1) Immunity for any property damage not caused by motor driven equipment 2) Immunity for damages caused by potholes and road hazards 3) Immunity for water and sewage line breaks caused by ground shifting or any cause outside of motor driven equipment 4) Immunity for wastewater line back-ups 5) Immunity for business interruptions,claims caused by water outages or construction 6) Damage caused by police or fire during the course and scope of essential job duties such as damage to doors,windows,or other items during forced entry events Denton Municipal Electric Service Standards 1) Immunity for outages or lapses in power 2) Immunity for property damage such as damage to electronics or spoiled food caused by an outage 3) Immunity for business interruption caused by an outage Commercial Solid Waste Agreement and Current Rate Ordinance 1) Immunity for pavement damage or deterioration cause by vehicles servicing waste containers 2) Immunity for damage to grease traps and oil water separators opened using hand tools Texas Civil Practice and Remedies Code,Chapter 75(Recreational use statute) 1) Immunity from injuries while using City recreation facilities including parks,playgrounds,pools,fields,splash pads,gyms,etc. City of Denton Development Code,Chapter 7 1) Immunity for damages to items inside of a City easement 67 0 e CONSTRUCTIONC, THE FEB Olt AmWrl' . . CONSTRUCTION INFLATION ALERT Two years after the coronavirus pandemic struck,the U.S.construction industry is still experiencing multiple impacts.Unprecedented increases in materials costs,supply-chain disruptions,and an increasingly tight labor market have made life difficult for contractors and project owners alike. Beginning in March 2021,the Associated General Contractors of America(AGC)has posted several editions of the Construction Inflation Alert,a document to inform project owners,government officials,and the public about these impacts on construction.The current version is the fifth update of that Alert—an indication that the situation is far from"normal." Although the overall economy posted exceptionally strong growth in 2021 and appears to be headed for further expansion,the construction industry has experienced a much more uneven recovery.Until recently,lagging demand for numerous types of nonresidential construction prevented many contractors from fully passing on their added costs.Successive outbreaks of Covid-19 have disrupted production and delivery of goods,labor availability,and the mix of projects. This combination of supply chain bottlenecks, unpredictable costs and delivery times,and smaller bid price increases threatens to push some firms out of business. This report is intended to provide all parties with better understanding of the current situation,the impact on construction firms and projects,its likely course in the next several months,and possible steps to mitigate the damage.The document will be revised to keep it timely as conditions change;download it at AGC Construction Inflation Alert I Associated General Contractors of America. Please send comments and feedback to AGC of America's chief economist, Ken Simonson, ken.simonson@agc.org. www.agc.org Record cost increases Contractors experienced record increases for materials costs in 2021.While some costs have subsided in recent months,others have continued to rise or have become volatile in both directions—a threat in its own way. Around the middle of each month,the Bureau of Labor Statistics(BLS)posts producer price indexes(PPI)for thousands of products and services at www.bls.gov/ppi. Most of these are based on the prices that sellers say they charged for a specific item on the 11th day of the preceding month. Producers include manufacturers and fabricators,intermediaries such as steel service centers and distributors,and providers of services ranging from design to trucking. BLS aggregates these prices into index numbers that cover an entire category of products,such as a weighted average of all concrete products,as well as indexes for the mix of goods and services purchased by industries such as construction.The index readings themselves do not translate into a price found in the market,but the percentage change in an index number from one period to another The producer price indicates the amount of price increase or decrease that has occurred. index soared from - 2020 The PPI for inputs to new nonresidential construction is a weighted average of the goods and services to June 2021. By purchased for every type of new construction other than housing.It does not include a contractor's December, own labor costs,equipment purchases,or direct imports but does cover an importer's or distributor's increases had markup on imported goods. moderated slightly This index rose by a record amount in 2021.As shown in Figure 1,the index soared 24.1%from June but still totaled 19.6% 2020 to June 2021 before moderating slightly. From December 2020 to December2021,the increase for the year. still totaled 19.6%—a huge jump from the 4.4%rise posted in 2020 and the 1.8%gain in 2019. Figure 1 Change in prices for inputs to construction Year-over-year change in PPI,2015-2021,not seasonally adjusted 25% 20% Inputs to new nonresidential construction December 2020-December 2021:19.6% 15% 10% 5% 0% -5% -10% Dec Dec Dec Dec Dec Dec Dec 2015 2016 2017 2018 2019 2020 2021 Source:Bureau of tabor Statistics,producer price indexes,w bls.eov/ont OAGC 2022 CONSTRUCTION INFLATION ALERT 2 THE CONSTRUCTION ASSOCIATION 69 No category of construction has escaped the extreme cost escalation.BLS posts PPIs for inputs to highways and streets; commercial,healthcare,industrial,power and communications,education and vocational,and other miscellaneous nonresidential structures;and for single-and multifamily construction.From December 2020 to December 2021,the increases in these input cost indexes ranged from 14.6%for new multifamily construction to 20.7%for commercial structures. Contributors to runaway costs What has contributed to these extreme cost increases?In brief:nearly everything,as shown in Table 1.From December 2020 to December 2021,the PPI for steel mill products more than doubled,rocketing up 127.2%.There were double-digit increases in the PPIs for plastic construction products,34.0%;aluminum mill shapes,29.8%;copper and brass mill shapes,23.4%;gypsum products,20.7%;lumber and plywood, 17.6%;architectural coatings(paint),13.9%;and asphalt felts and coatings,11.8%. Even items that did not end the year with double-digit gains had unusually large increases.The PPI for concrete products jumped 8.5%from December 2020 to December 2021,the largest rise in 15 years.The index for flat glass also posted an 8.5%gain(from November 2020 to November 2021),a 40-year high, before finishing the year with an increase of 7.3%. In addition to materials that go into structures,prices for items and services used by contractors soared.For instance,contractors pay for huge amounts of diesel fuel—purchased directly to run contractors'own trucks and offroad equipment,as well as indirectly in the freight charges or explicit The retail price of fuel surcharges for myriad deliveries of goods and equipment,and the hauling away of dirt,debris, diesel fuel reached a and equipment.The PPI for diesel fuel leaped 54.9%from December 2020 to December 2021,while nearlyS -• • of the index for truck transportation of freight climbed 17.7%. $3.95 per gallon on ` Contractors also paid much more for equipment and parts.The PPI for construction machinery and February 7, an equipment jumped 10.1%in 2021,and the index for truck and bus(including off-the-highway) increase of $1.15 or pneumatic tires rose 11.2%. from one "• " • As shown in Table 1,all of these increases far exceeded the changes a year earlier. Table 1 Price increases for construction inputs Year-over-year change in December PPI Construction materials 2020 2021 Steel mill products 5.2%p 127% Plastic construction products 5.4% 34% Aluminum mill shapes 4.7% 30% Copper and brass mill shapes 24% 23% Gypsum products 3.6% 21% Lumber and plywood 37% 18% Architectural coatings 1.9% 14% Asphalt felts and coatings 2.1% 12% Used by contractors Diesel fuel -2.8% 55% Truck transport of freight 2.2% 18% Construction machinery and equipment 1.1% 10% Truck and offroad tires 0.3% 11% Sour Bureau d Labor Statistics,producer price indexes,wwwbls_eov/oc OAGC 2022 CONSTRUCTION INFLATION ALERT 3 THE CONSTRUCTION ASSOCIATION 70 What happened to bidprices? The extreme runup in so many input costs caused financial hardship for many contractors and subcontractors,especially for those whose purchases are concentrated in materials with extra-steep increases.Eighty-four percent of the contractors in the 2022 AGC/ Sage Construction Hiring and Business Outlook Survey reported their firms had incurred unanticipated costs in 2021. BLS posts several PPIs for new nonresidential construction and for subcontractors'pricing.Since every construction project is unique,it is not possible to collect prices for identical construction"products"in the same way as for most goods and services. Instead,the agency creates"bid price"PPIs(BLS refers to them as output price indexes)through a two-step process.Each quarter it receives data from construction cost-estimating firms as to the cost of a package of installed components or"assemblies'of a particular nonresidential building. Every month BLS asks a fixed group of contractors the amount of overhead and profit they would charge to erect that building. BLS combines the answers from a set of contractors to create PPIs for new warehouse,school,office, industrial,and healthcare building construction,along with a weighted average of these building types for an overall index for new nonresidential building construction.There are also indexes for maintenance and repair and for all types of nonresidential work performed by concrete,electrical,roofing,and plumbing contractors. Figure 2 Change in prices for new nonresidential construction inputs vs.bid prices Year-over-year change in PPIs,Sep 2020-Dec 2021,not seasonally adjusted 12 months to: 25% Sets Dec 2020 2021 20% Inputs PPI: 1.8% 19.6% 15% Bid price PPI: 1.896 12.5%, 10% 5% 0% Sep Dec Mar Jun Sep Dec 2020 2020 2021 2021 2021 2022 Source:Bureau of labor Statistics,producer price indexes,w bls. /ow {las Figure 2 shows how the gap between input costs and bid prices widened dramatically beginning in September 2020.In that month,both price indexes increased 1.8%from the year-earlier level.Then,through mid-2021,the year-over-year increase in input costs outran the rise in bid prices by larger amounts each month.As noted above,input prices moderated in the second half of 2021,while bid prices rose more than in past years.But the 12.5%annual increase through December in the bid price PPI was far short of the 19.6%input-price increase.As a result,contractors were absorbing more and more of the cost increases. Moreover,the bid-price index only indicates the price contractors propose for new starts.On projects for which they had already submitted a bid or begun work,contractors were stuck with paying elevated materials prices that they could not pass on. Tariffs have also driven up some prices.In November,the Commerce Department doubled the tariff on Canadian softwood lumber from 9%to 18%.The 25%tariff on steel and 10%tariff on aluminum imposed by President Trump have largely been left in place so far by President Biden.In addition,President Trump imposed tariffs on thousands of products from China but created an exclusion process that enabled some items not produced in the U.S.to be imported without the tariff.The Biden administration largely suspended the exclusions,adding to the number of items with tariff-induced price increases. OAGC 2022 CONSTRUCTION INFLATION ALERT 4 �`o THE CONS TRACTION ASSOCIATION 71 Volatility vs. continuous cost increases Despite the steep increase in most input prices last year,several of them slowed or reversed course during 2021.Price indexes for diesel fuel and lumber each more than doubled from mid-2020 to mid-2021 before ending the year higher by"only"55%and 18%, respectively.The PPI for copper and brass mill shapes had a year-over-year gain of 65%earlier in 2021 but wound up"only"23% higher than in December 2020. Prices for each of these items have recently turned higher again.The futures price for lumber,as traded on the CME commodities exchange,tripled from a low in October to early January before partially retreating later in the month.The futures price for copper moved higher in January.The retail price of diesel fuel,as reported each Monday by the Energy Information Administration,reached a nearly eight-year high of$3.95 per gallon on February 7,an increase of$1.15 per gallon or 41%from one year earlier.These changes are likely to show up in PPIs in early 2022,and the fuel price increase will likely spread to higher prices for trucking,especially for deliveries of heavy items such as ready-mix concrete and rebar. As of early February,it does not appear likely that input prices will set new records in 2022.But wide swings in both directions may continue.Such volatility can be as risky to contractors'solvency as a steady change.Firms may submit bids based on the assumption that current prices will hold or slip further,only to be caught by a new upswing.And owners may pressure contractors to pass along recent price declines,not recognizing that current prices may not reflect the price a contractor already committed to pay for materials or the price it will pay months later when it places an order.There have also been recent cases of suppliers refusing to quote firm prices until time of shipment,at which point prices may greatly exceed the current price. When will bid prices catchu ?There is no fixed relationship between input costs and bies. For every firm and time period,the relationsphip depends on specific market conditions and expectations. However, it is possible to look at past relationships. Figure 3 shows the difference between the year-over-year change in the PPI for materials costs for goods inputs to construction and the bid price index for new warehouses (the longest time series available). Figure 3 Cost squeeze on contractors can last two years or more Difference between year-over-year change in materials costs vs.bid prices,Jan 2006-Dec 2021 24`Yp =period when 18% change in costs exceeded change in bid 12% prices 6% 0% A FV -6% -12% Source:Source:Bureau of Labor statistics,www.bls.eov/poi.producer price indexes for goods inputs to construction(material costs) and new warehouse construction(bid prices) OAGC 2022 CONSTRUCTION INFLATION ALERT 5 �`o THE CONS TRn CTION ASSOCIATION 72 The areas in red indicate periods in which the year-over-year change in the PPI for inputs to construction exceeded the PPI for new nonresidential building construction--specifically,warehouses.(Similar patterns exist for the other new-construction"bid price" indexes:the PPIs for new school,office,industrial and healthcare buildings.) Materials costs outrun bid prices for as long as 27 months from late 2009 to early 2012 and for nearly 24 months from late 2016 to late 2018.The current gap hasn't lasted as long—yet—but the peak was twice as high as in previous episodes,indicating the pain for contractors was that much more intense. Supply" chain issues From the first days of the pandemic,availability and delivery times for materials have been never-ending headaches for construction firms.Problems began as early as February 2020,when factories in China and northern Italy were shut down,causing shortages of items as diverse as elevator parts,floor tiles,and kitchen appliances. The following month,as the U.S.economy went into a steep dive,construction firms canceled orders and suppliers lost workers to Covid-19 or shut to comply with governors'edicts.When orders rebounded,there were not enough workers,ships,port berths, containers,chassis,or trucking,rail,and warehouse workers to produce and move goods. Adding to these pandemic-induced problems,a series of unusual mishaps interfered with output or delivery of numerous goods.The biggest impact for construction came from the deep freeze in Texas in February 2021 that damaged all of the petrochemical plants producing resins for a host of construction plastics.Damage to the electrical grid in Louisiana from Hurricane Ida last summer further interfered with the production of some plastics inputs.Wildfires and mudslides in British Columbia and soggy conditions in the Southeast have affected lumber production.The blockage of the Suez Canal and the abrupt closure of an Interstate highway bridge across the Mississippi River in 2021 are further examples of"one-off"events that have disrupted the supply chain. Construction has also been affected by the much-publicized shortage of computer chips.Not only is the industry a major buyer of ` pickup trucks that are in short supply,but deliveries of construction equipment also have been held up by a lack of semiconductors. With so many factors contributing to delays,it is not surprising that 72%of the respondents to AGC's outlook survey reported that projects took longer than anticipated last year.As a result,44%report that their firms are putting longer completion times into bids or contracts. So far,there is little sign that the supply chain will consistently improve in 2022.While the lead time for some items has shortened, deliveries for many materials remain delayed or unpredictable.Dealers and contractors continue to report being informed shortly before an expected delivery that the item will not arrive for months or the quantity will be less than expected —and needed.Other items have shown up unexpectedly early,without warning,causing problems when they cannot be used, installed,or stored onsite. 39000 Construction job openings at the • of I21 totaled 273,000, • jump of nearly 30%from the end of 2020. OAGC 2022 CONSTRUCTION INFLATION ALERT 1 6 THE CONSTRUCTION ASSOCIATION 73 Worker availabilit yo The construction industry lost 1.1 million employees from February to April 2020—a 15%decline in just two months and nearly half as many as in the industry's five-year downturn from 2006 to 2011.While both residential and nonresidential construction employment rebounded somewhat in May 2020,employment stalled for more than a year after that among nonresidential firms—general and specialty trade contractors plus civil and heavy engineering construction firms.During that period,thousands of experienced workers moved into residential construction(homebuilding and remodeling),found jobs in other sectors,or left the workforce completely. Nonresidential employment grew strongly in the last four months of 2021.But job openings increased even faster.Openings at the end of 2021 totaled 273,000,a jump of nearly 30%from the end of 2020,according to BLS's Job Openings and Labor Turnover Survey. The total exceeded the 220,000 employees hired in December,implying that construction firms would have added twice as many workers as they were able to,if there had been enough qualified applicants. In order to attract,retain,and bring back workers,construction firms are raising pay.Average hourly earnings in construction rose 5.8%from February 2021 to January 2022 for"production and nonsupervisory employees"—mainly hourly craft workers.But the average for such workers in the overall private sector climbed 6.9%.The implication is that construction companies will have to raise pay even more in the coming months to remain competitive. What can contractors and owners do.? While contractors cannot unclog ports or rescind tariffs,they can provide project owners with timely and credible third-party information about changes in relevant material costs and supply-chain snarls that may impact the cost and completion time for a project that is underway or for which a bid has already been submitted. Owners can authorize appropriate adjustments to design, completion date, and payments to accommodate or work around these impediments. Nobody welcomes a higher bill, but the alternative of having a contractor go out of business because of impossible costs or timing is likely to be worse for many owners. For projects that have not been awarded or started,owners should start with realistic expectations about current costs and the llikelihood of increases.They should provide potential bidders with accurate and complete design information to enable bidders to prepare bids that minimize the likelihood of unpleasant surprises for either party. Owners and bidders may want to consider price-adjustment clauses that would protect both parties from unanticipated swings in materials prices.Such contract terms can enable the contractor to build in a smaller contingency to its bid,while providing the owner an opportunity to share in any savings from downward price movements(which are likely at some point,particularly for long-duration projects).The ConsensusDocs set of contract documents(www.consensusdocs.org)is one source of industry-standard model language for such terms.The ConsensusDocs website includes a price escalation resource center(https://www.consensusdocs.org/ price-esca lation-cla use/). The parties may also want to discuss the best timing for ordering materials and components. Buying items earlier than usual can provide protection against cost increases. But purchase before use entails paying sooner for the items; potentially paying for storage, security against theft and damage;and the possibility of design changes that make early purchase unwise. OAGC 2022 CONSTRUCTION INFLATION ALERT 1 7 �`o THE CONS TRACTION ASSOCIATION 74 Conclusion The construction industry is in the midst of a period of exceptionally steep and fast-rising costs for a variety of materials,compounded by major supply-chain disruptions and a shortage of available workers—a combination that threatens the financial health of many contractors. No single solution will resolve the situation,but there are steps that government officials,owners,and contractors can take to lessen the pain. Federal trade policy officials can act immediately to end tariffs and quotas on imported products and materials.With many U.S.mills and factories already at capacity,bringing in more imports at competitive prices will cool the overheated price spiral and enable many users of products that are in short supply to avoid layoffs and shutdowns. Officials at all levels of government should review all regulations,policies,and enforcement actions that may be unnecessarily driving up costs and slowing importation,domestic production,transport,and delivery of raw materials,components,and finished goods. Owners need to recognize that significant adjustments are probably appropriate regarding the price or delivery date of projects that were awarded or commenced early in the pandemic or before,when conditions at suppliers were far different. For new and planned projects,owners should expect quite different pricing and may want to consider building in more flexibility regarding design,timing, or cost-sharing. Contractors need,more than ever,to closely monitor costs and delivery schedules for materials and to communicate information with owners,both before submitting bids and throughout the construction process. Materials prices do eventually reverse course.Owners and contractors alike will benefit when that happens.Until then,cooperation and communication can help reduce the damage. AGC resources This document will be updated if market conditions warrant.Check https://www.agc.org/learn/construction-data/agc-construction- inflation-alert for the latest edition. The AGC website,www.agc.org,has a variety of resources available to contractors,owners,and others wanting to know more about l the construction industry. is AGC posts tables showing changes in PPls and national,state,and metro construction employment each month at https:// www.agc.org/learn/construction-data AGC's Data DIGest is a weekly one-page summary of economic news relevant to construction.Subscribe at https://store.agc.org/ Store/Sto re/Store Layouts/Item_Detail.aspx?i Prod uctCode=4401 or email chief economist Ken Simonson at ken.simonson@agc.org. Construction documents are available for viewing and purchase from ConsensusDocs at www.consensusdocs.org,including the price escalation resource center,www.consensusdocs.org/price-escalation-clause/ OAGC 2022 CONSTRUCTION INFLATION ALERT 18 THE CONSTRUCTION ASSOCIATION 75 Date: February 25,2022 Report No. 2022-013 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Debt Summary Report of City's outstanding debt BACKGROUND: Attached is the Debt Summary Report with principal and interest outstanding as of September 30, 2021. This report is prepared on an annual basis to provide residents and the public with a comprehensive and easy-to-understand summary of the City's debt profile. Additionally, this report includes required information in accordance with Texas Local Government Code 140.008 (House Bill 1378). The report provides a high-level introduction to the types and uses of debt issued by the City as well as the most recent bond ratings. Staff has differentiated between tax-supported and revenue- supported debt to give the public a better understanding of which debt is paid for by property taxes versus rate revenues. Furthermore, the report details the principal and interest for each major service area of the City and provides two visual representations by dollar amount and percentages. This Debt Summary Report is provided annually to City Council for any additional feedback. CONCLUSION: If no feedback is received within a week, staff will post the report on the City's website for the public on Tuesday, March 8, 2022. The report is intended to be updated annually in conjunction with the City's fiscal year end. ATTACHMENT(S): Debt Summary Report as of September 30, 2021 STAFF CONTACT: Randee Klingele, Treasury Manager (940)-349-8206 Randee.klingele kcityofdenton.com 76 City of Denton Debt Summary Report Fiscal Year Ending September 30, 2021 Contact: City of Denton Finance Department Attn: Cassandra Ogden—Director of Finance 215 E. McKinney St. Denton, Texas 76201 Email: Cassandra.Ogdengcityofdenton.com Phone: 940-349-7195 Fax: 940-349-7206 Website: www.cityofdenton.com Published: February 25, 2022 Disclaimer: Data provided in this report is as of the date of publication, constitutes existing long- term debt obligations only, and has been prepared pursuant to Texas Local Government Code 140.008 (House Bill 1378). This report does not include forward looking statements nor does it include debt that may be incurred in the future. Interested parties should refer to the City's audited financial statements and other disclosure documents when investing. 1 77 TABLE OF CONTENTS Introduction.......................................................................................................3 CITYDEBT SECTION Schedule—Total Annual Debt Service by Type of Debt....................................................6 Bar&Pie Charts—Total Annual Debt Service by Type of Debt...........................................7 Schedule—Tax Supported Debt Service..................................................................... 8 Bar&Pie Charts—Tax Supported Debt Service............................................................9 Schedule—Revenue Supported Debt Service................................................................10 Bar&Pie Charts—Revenue Supported Debt Service...................................................... 11 Schedule—General Government Debt Service...............................................................12 Bar&Pie Charts—General Government Debt Service.....................................................13 Schedule—Electric Debt Service..............................................................................14 Bar&Pie Charts—Electric Debt Service.....................................................................15 Schedule—Water Debt Service................................................................................ 16 Bar&Pie Charts—Water Debt Service.......................................................................17 Schedule—Wastewater Debt Service......................................................................... 18 Bar&Pie Charts—Wastewater Debt Service................................................................19 Schedule—Solid Waste Debt Service.........................................................................20 Bar&Pie Charts—Solid Waste Debt Service................................................................21 HOUSE BILL 1378 SECTION Summary of Debt Obligations...................................................................................23 Individual Debt Obligations.....................................................................................24 Glossaryof Terms................................................................................................32 2 78 INTRODUCTION This report is divided into two sections. The first section(City Debt)presents the City's outstanding debt by the manner in which the City intends to pay for such debt (tax-supported versus revenue- supported). Additionally, this section provides a breakdown of the City's outstanding debt by purpose (General Government, Electric, Water, Wastewater, Solid Waste and Airport). The second section(House Bill 1378)is intended to comply with reporting requirements pursuant to Texas Local Government Code 140.008. The City of Denton utilizes long-term debt to finance non-operating expenses, which may include equipment, facilities, and the acquisition of land. Unlike the Federal Government, the City generally issues debt for the purchase or construction of capital assets and infrastructure improvements and cannot issue debt to fund operating expenses or deficit spending. All debt issued by the City must be approved by the Texas Attorney General's Office prior to the final sale of the debt. Additional information on the City's outstanding debt including statistical comparisons and ratios can be found in the City's Comprehensive Annual Financial Report, which is located on the City's website under the Finance Department. (www.cityofdenton.com) The City issues two types of long-term debt: General Obligation Debt and Revenue Bond Debt. The City also differentiates between tax-supported and revenue-supported debt to provide the public with a clear understanding of which debt will be paid by property taxes versus rate revenues. The following table shows the latest bond ratings for each type of debt for which ratings are given: Mood 's' Standard&Poor's Fitch General Obligation Debt Not Rated AA+ AA+ Revenue Bond Debt2 Not Rated A+ A 'Moody's does not currently rate any of the City's outstanding debt. 'Ratings for the Utility System Revenue Bonds,Series 2017&2021 were updated in 2021 at issuance. GENERAL OBLIGATION DEBT. The largest category of debt is General Obligation Debt. It consists of two categories of bonds: General Obligation Bonds (GOs) and Certificates of Obligation(COs). GOs are generally voter approved and backed by the full faith and credit of the City (property tax pledge) and must be approved at an election. Voter approval may be granted during one of two general election dates each year. GOs which are issued to refund outstanding debt do not require voter approval. Under the City's debt policy, GOs strive to have a final maturity of twenty (20) years or less. COs do not require voter approval and generally have a dual pledge of a specific City revenue source as well and the full faith and credit of the City. Some examples of pledged City revenues are electric, water, wastewater, and drainage revenues. Under the City's debt policy, COs will strive to have a final maturity of thirty (30) years or less. Historically, COs have mostly been issued with twenty (20) year final maturities for general government purposes. In 2010, the City began issuing COs not only for general government purposes which are repaid by property taxes,but also for utility related projects of the City. The COs issued for utility purposes are repaid from the specific utility fund for which the debt was issued. COs have a lower interest rate than revenue bonds, due to the pledge of full faith and credit of the City. A portion of the interest savings to the City's utilities through issuing COs (instead of revenue bonds) is being paid to the general government and placed in the Street Improvement Fund. 3 79 REVENUE BOND DEBT: The second category of debt is Revenue Bond Debt. This debt is secured by only a pledge of the operating revenues of the City's Electric, Water and Wastewater Funds (collectively known as the "Utility System") and not the full faith and credit of the City. Under the City's debt policy, revenue bonds will strive to have a final maturity of thirty (30) years or less. Historically, most revenue bonds have been issued with a twenty (20) year final maturity. As of September 30, 2021, the City has the Utility System Revenue Bonds, Series 2017 and 2021's outstanding. OUTSTANDING DEBT: The City's total outstanding principal and interest as of September 30, 2021, is shown in Table 1 on page 6 of this report. 4 80 CITY DEBT SECTION 5 81 Table 1 -Total Outstanding Debt(in millions) as of September 30,2021 Principal Interest Total GOs $ 304.18 $ 69.08 $ 373.26 COs $ 552.40 $ 226.58 $ 778.98 Revenue Bonds $ 341.33 $ 159.84 $ 501.17 Total $ 1,197.91 $ 455.50 $ 1,653.41 City of Denton Total Annual Debt Service(Principal&Interest)-All Debt Fiscal Year Ending September 30,2021 FY End General Obligation Bonds(GOs) Certificates of Obligation(COs) Revenue 9-30 Tax Supported Revenue Supported Tax Supported Revenue Supported Bonds Total 2022 $ 19,422,898 $ 26,957,976 $ 13,184,891 $ 34,214,459 $ 20,570,668 $ 114,350,893 2023 18,131,569 21,789,339 11,752,994 32,050,993 25,295,259 109,020,153 2024 17,600,888 19,444,244 10,922,169 31,629,044 25,300,313 104,896,658 2025 16,725,505 16,735,504 10,119,219 31,164,269 25,298,018 100,042,515 2026 16,087,375 9,750,100 9,320,944 30,990,519 25,295,282 91,444,220 2027 15,503,146 9,337,375 8,403,256 30,745,871 25,298,300 89,287,949 2028 14,023,950 8,111,100 7,959,838 30,332,475 25,300,530 85,727,892 2029 12,856,278 6,945,325 7,325,894 30,222,371 25,300,299 82,650,168 2030 12,855,300 6,991,575 7,181,181 30,277,105 25,298,164 82,603,325 2031 12,539,172 1,547,875 7,173,000 30,313,356 25,298,194 76,871,596 2032 12,352,631 - 7,030,169 30,347,794 25,299,853 75,030,447 2033 12,152,884 7,000,222 27,791,200 25,295,276 72,239,582 2034 11,860,122 6,408,319 24,570,219 25,301,145 68,139,805 2035 11,592,056 5,906,391 23,154,831 25,296,215 65,949,493 2036 10,015,759 5,674,269 22,260,644 25,299,258 63,249,930 2037 8,934,628 5,436,981 21,095,044 25,297,732 60,764,385 2038 7,802,291 4,850,394 21,064,394 7,223,309 40,940,387 2039 6,428,563 2,716,309 21,072,838 7,224,204 37,441,913 2040 5,182,944 2,453,550 20,266,547 7,225,700 35,128,741 2041 3,577,613 1,071,925 19,680,563 7,222,724 31,552,824 2042 - - 17,175,759 7,225,125 24,400,884 2043 17,175,638 7,223,201 24,398,839 2044 17,168,953 7,221,587 24,390,540 2045 13,803,044 7,224,314 21,027,357 2046 9,931,481 7,221,224 17,152,705 2047 6,937,400 7,222,160 14,159,560 2048 3,393,388 7,221,888 10,615,275 2049 3,392,038 7,225,170 10,617,207 2050 3,014,575 7,221,849 10,236,424 2051 - - - 1,852,875 7,221,769 9,074,644 $ 245,645,572 $ 127,610,413 $ 141,891,913 $ 637,089,686 $ 501,168,729 $ 1,6539406,313 6 82 Total Annual Debt Service $ ■GO-Tax Supported ■GO-Revenue Supported ■CO-Tax Supported $120 $100 S80 a $60 $40 $20 $- N l- 00 D\ CD ►+ N M "I, V-1 �O [- 00 ON CD �-+ N M V'1 �0 l- 00 ON CD .-� N N N N N f`J N N M M M M M M M fn M K1 '"- d �t <J' "I d' 'I" �P V-1 V'1 CD CD CD O CD CD CD O CD O O O O O O CD O O O O O O CD CD CDO O CJ fV CIA N CIA N N N N N N fV N N N N N N N N N N cV N N N N N N N Total Annual Debt Service (%) ■ 14.86% ■ 30.31% ■ 7.72% ■ 8.58% ■ 38.53% ■GO-Tax Supported ■GO-Revenue Supported ■CO-Tax Supported ■CO -Revenue Supported ■Revenue Bonds 7 83 City of Denton Total Annual Debt Service(Principal&Interest)-Tax Supported Debt Fiscal Year Ending September 30,2021 FY End General Obligation Bonds Certificates of Obligation 9-30 (GOs) (COS) Total 2022 $ 19,422,898 $ 13,184,891 $ 32,607,789 2023 18,131,569 11,752,994 29,884,562 2024 17,600,888 10,922,169 28,523,057 2025 16,725,505 10,119,219 26,844,724 2026 16,087,375 9,320,944 25,408,318 2027 15,503,146 8,403,256 23,906,403 2028 14,023,950 7,959,838 21,983,787 2029 12,856,278 7,325,894 20,182,172 2030 12,855,300 7,181,181 20,036,481 2031 12,539,172 7,173,000 19,712,172 2032 12,352,631 7,030,169 19,382,800 2033 12,152,884 7,000,222 19,153,106 2034 11,860,122 6,408,319 18,268,441 2035 11,592,056 5,906,391 17,498,447 2036 10,015,759 5,674,269 15,690,028 2037 8,934,628 5,436,981 14,371,609 2038 7,802,291 4,850,394 12,652,684 2039 6,428,563 2,716,309 9,144,872 2040 5,182,944 2,453,550 7,636,494 2041 3,577,613 1,071,925 4,649,538 $ 245,645,572 $ 141,891,913 $ 387,537,485 8 84 Tax Supported Debt ($) $35 $30 $25 $'_0 a 0 im $15 $io $5 O O O O O O O O O O O O O O O O O O O O N N N N N N N N N N l`J N N N N N N N N N ■CO ■GO Tax Supported Debt (%) ■ 36,61% ■ 63.39% ■GO NCO 9 85 City of Denton Total Annual Debt Service(Principal&Interest)-Revenue Supported Debt Fiscal Year Ending September 30,2021 FY End General Obligation Bonds Certificates of Obligation Revenue 9-30 GOs Cos Bonds Total 2022 $ 26,957,976 $ 34,214,459 $ 20,570,668 $ 81,743,103 2023 21,789,339 32,050,993 25,295,259 79,135,591 2024 19,444,244 31,629,044 25,300,313 76,373,601 2025 16,735,504 31,164,269 25,298,018 73,197,791 2026 9,750,100 30,990,519 25,295,282 66,035,902 2027 9,337,375 30,745,871 25,298,300 65,381,546 2028 8,111,100 30,332,475 25,300,530 63,744,105 2029 6,945,325 30,222,371 25,300,299 62,467,996 2030 6,991,575 30,277,105 25,298,164 62,566,844 2031 1,547,875 30,313,356 25,298,194 57,159,424 2032 - 30,347,794 25,299,853 55,647,647 2033 - 27,791,200 25,295,276 53,086,476 2034 - 24,570,219 25,301,145 49,871,364 2035 - 23,154,831 25,296,215 48,451,046 2036 - 22,260,644 25,299,258 47,559,902 2037 - 21,095,044 25,297,732 46,392,776 2038 - 21,064,394 7,223,309 28,287,703 2039 - 21,072,838 7,224,204 28,297,041 2040 - 20,266,547 7,225,700 27,492,247 2041 - 19,680,563 7,222,724 26,903,286 2042 - 17,175,759 7,225,125 24,400,884 2043 - 17,175,638 7,223,201 24,398,839 2044 - 17,168,953 7,221,587 24,390,540 2045 - 13,803,044 7,224,314 21,027,357 2046 - 9,931,481 7,221,224 17,152,705 2047 6,937,400 7,222,160 14,159,560 2048 3,393,388 7,221,888 10,615,275 2049 3,392,038 7,225,170 10,617,207 2050 3,014,575 7,221,849 10,236,424 2051 - 1,852,875 7,221,769 9,074,644 $ 127,610,413 $ 637,089,686 $ 501,168,729 $ 1,265,868,828 10 86 Revenue Supported ($) $90 $80 - - $70 $60 $50 0 $40 $30 $20 $10 $- N M -t u1 4D 1- O C1 O ri N M -t VI w I- co Q1 O rl N M to tD f, O Dl O ei O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N ■GO■CO■Revenue Revenue Supported (%) e• li2.C18'% ■ 39.59% r� IF 50.33% ■GO ■CO m Revenue Bonds 11 87 City of Denton Total Annual Debt Service(Principal&Interest)- General Government Fiscal Year Ending September 30,2021 FY End 9-30 General Airport Water Park Warehouse Total 2022 $ 31,601,740 $ 724,659 $ 232,027 $ 49,364 $ 32,607,789 2023 $ 28,979,532 686,259 170,542 48,230 29,884,562 2024 $ 27,661,734 690,672 170,650 - 28,523,057 2025 $ 26,049,912 623,838 170,974 - 26,844,724 2026 $ 24,617,979 619,913 170,426 - 25,408,318 2027 $ 23,154,575 581,388 170,440 - 23,906,403 2028 $ 21,229,183 583,875 170,730 - 21,983,787 2029 $ 19,433,171 578,181 170,820 - 20,182,172 2030 $ 19,283,243 582,581 170,657 - 20,036,481 2031 $ 18,960,451 581,363 170,358 - 19,712,172 2032 $ 18,627,661 584,484 170,655 - 19,382,800 2033 $ 18,390,690 591,625 170,791 - 19,153,106 2034 $ 17,642,425 455,150 170,866 - 18,268,441 2035 $ 16,994,792 332,878 170,776 - 17,498,447 2036 $ 15,218,444 332,563 139,022 - 15,690,028 2037 $ 14,039,897 331,713 - - 14,371,609 2038 $ 12,327,084 325,600 - - 12,652,684 2039 $ 9,144,872 - - - 9,144,872 2040 $ 7,636,494 - - - 7,636,494 2041 $ 4,649,538 - - - 4,649,538 $ 375,643,417 $ 9,206,739 $ 2,589,735 $ 97,593 $ 387,537,485 12 88 General Government ($) $35 $30 $25 $20 a $15 $10 $5 $- f V M h %O 1- 00 Q) O �-+ N M '�t �� �O [— 00 C O -+ N N N l`J N N N N M M M M M M M M M M rt �r O O O O O O O O O O O O O O O O O O O O N N N N N f4 N N f4 N ell N (^1 N N N N N N f4 Warehouse ■Water Park ■Au oil ■General General Government (%) 0.03% 0.67% ■ 2.38% ■ 96.93% Warehouse ■Water Park ■Airport ■General 13 89 City of Denton Total Annual Debt Service(Principal&Interest)-Electric Fiscal Year Ending September 30,2021 FY End General Obligation Bonds Certificates of Obligation Revenue 9-30 GOs Cos Bonds Total 2022 $ 15,684,175 $ 21,382,491 $ 20,570,668 $ 57,637,334 2023 14,161,550 21,368,400 25,295,259 60,825,209 2024 12,816,225 21,349,126 25,300,313 59,465,664 2025 10,140,500 21,318,476 25,298,018 56,756,994 2026 5,072,375 21,308,326 25,295,282 51,675,983 2027 4,777,150 21,319,713 25,298,300 51,395,163 2028 4,301,125 21,311,131 25,300,530 50,912,786 2029 3,494,125 21,271,216 25,300,299 50,065,640 2030 3,524,000 21,307,555 25,298,164 50,129,720 2031 1,319,500 21,335,700 25,298,194 47,953,393 2032 - 21,360,013 25,299,853 46,659,865 2033 19,773,116 25,295,276 45,068,391 2034 17,046,869 25,301,145 42,348,014 2035 17,059,050 25,296,215 42,355,265 2036 17,086,763 25,299,258 42,386,021 2037 17,110,563 25,297,732 42,408,294 2038 17,137,925 7,223,309 24,361,234 2039 17,155,938 7,224,204 24,380,141 2040 17,174,294 7,225,700 24,399,994 2041 17,177,719 7,222,724 24,400,442 2042 17,175,759 7,225,125 24,400,884 2043 17,175,638 7,223,201 24,398,839 2044 17,168,953 7,221,587 24,390,540 2045 13,803,044 7,224,314 21,027,357 2046 9,931,481 7,221,224 17,152,705 2047 6,937,400 7,222,160 14,159,560 2048 3,393,388 7,221,888 10,615,275 2048 3,392,038 7,225,170 10,617,207 2049 3,014,575 7,221,849 10,236,424 2050 - 1,852,875 7,221,769 9,074,644 $ 75,290,725 $ 485,199,531 $ 501,168,729 $ 1,061,658,985 14 90 Electric ($) $70 $60 $50 $40 a $30 $20 $10 vl � r 00 0\ CD --+ N M et v1 "O l— 00 01 O --+ lV M v1 �0 l— m 00 0\ O N N N ellfV N CA N enfn M M M en M M enM d" 'I. ,I. eh �' er d' `, It 11, r" 0 0 0 0 N N f4 N N N N N N N N N . N N N N N N N N N N N N N N N N N ■GO ■CO ■Revenue Bonds Electric (%) ■ 7.0900 ■ 47.21% ■ 45.70% ■GO ■CO ■Revenue Bonds 15 91 City of Denton Total Annual Debt Service(Principal&Interest)-Water Fiscal Year Ending September 30,2021 FY End General Obligation Bonds Certificates of Obligation Revenue 9-30 GOs Cos Bonds Total 2022 $ 7,724,825 $ 3,147,262 $ 10,872,087 2023 5,453,375 3,138,937 8,592,312 2024 5,542,850 3,134,762 8,677,612 2025 5,565,950 3,124,562 8,690,512 2026 3,700,575 3,123,237 6,823,812 2027 3,710,175 3,123,571 6,833,746 2028 3,060,750 3,114,193 6,174,943 2029 2,749,325 3,093,606 5,842,931 2030 2,763,825 3,099,218 5,863,043 2031 3,100,100 3,100,100 2032 - 3,103,194 3,103,194 2033 2,668,231 2,668,231 2034 2,662,231 2,662,231 2035 2,034,619 2,034,619 2036 1,833,619 1,833,619 2037 1,340,456 1,340,456 2037 1,338,794 1,338,794 2038 1,338,391 1,338,391 2039 1,147,219 1,147,219 2040 - 1,142,713 1,142,713 $ 40,271,650 $ 49,808,914 $ - $ 90,080,564 16 92 Water ($) �12 $10 $s 0 $6 $4 $2 $- ell M et V+ %D [— 00 C1 O �--� ell en �f Vt I'O l— 1— 00 m CDf d Cl N ell CA CACV N M M M en M M M M M M M � O O CD O O O O O O O O O O O O O CDO O ell f4 N N f`I ell N N ri N f11 N N ell c11 N N l4 ell (4 ■GO ■CO Water (%) ■ 44.71% ■ 55.290 ■GO ■CO 17 93 City of Denton Total Annual Debt Service(Principal&Interest)-Wastewater Fiscal Year Ending September 30,2021 FY End General Obligation Bonds Certificates of Obligation Revenue 9-30 GOs Cos Bonds Total 2022 2,506,300 4,392,775 6,899,075 2023 1,329,300 4,386,525 5,715,825 2024 262,475 4,370,725 4,633,200 2025 260,550 4,370,425 4,630,975 2026 267,250 4,370,150 4,637,400 2027 273,350 4,364,375 4,637,725 2028 272,750 4,372,775 4,645,525 2029 280,250 4,318,750 4,599,000 2030 281,875 4,330,031 4,611,906 2031 - 4,341,669 4,341,669 2032 - 4,338,575 4,338,575 2033 - 3,835,191 3,835,191 2034 - 3,476,856 3,476,856 2035 - 3,018,856 3,018,856 2036 - 2,548,994 2,548,994 2037 - 2,322,919 2,322,919 2037 - 2,328,744 2,328,744 2038 - 2,325,128 2,325,128 2039 - 1,691,806 1,691,806 2040 - 1,107,319 1,107,319 $ 5,734,100 $ 70,612,583 $ - $ 76,346,683 18 94 Wastewater($) 7 6 5 4 3 1 N K1 '11 V1 %0 [- 00 0� O ,1, V1 %D [— [— 00 0� O f`J N N N N N [V N M M M M M M M M M M M � O O O O O O O O O O O O O O O O O O O O N N N N N " f11 l4 N N f11 fY f4 f J N ell N ■GO ■CO Wastewater(%) ■ 7.51% ■ 92.49% ■GO ■CO 19 95 City of Denton Total Annual Debt Service(Principal&Interest)-Solid Waste Fiscal Year Ending September 30,2021 FY End General Obligation Bonds Certificates of Obligation Revenue 9-30 GOs Cos Bonds Total 2022 $ 1,026,492 $ 4,664,126 $ $ 5,690,617 2023 829,301 2,567,151 3,396,452 2024 822,694 2,184,951 3,007,644 2025 768,504 2,097,176 2,865,679 2026 709,900 1,934,601 2,644,501 2027 576,700 1,680,257 2,256,957 2028 476,475 1,279,544 1,756,019 2029 421,625 1,282,469 1,704,094 2030 421,875 1,287,844 1,709,719 2031 228,375 1,281,732 1,510,107 2032 - 1,294,556 1,294,556 2033 1,256,306 1,256,306 2034 1,128,331 1,128,331 2035 786,800 786,800 2036 535,775 535,775 2037 - 66,300 66,300 $ 6,281,940 $ 25,327,917 $ - $ 31,609,858 20 96 Solid Waste ($) $6 $5 $4 0 $3 $2 $1 r, ao rn c r- N N C`J N N CA CV N M M M M M M �Y1 M O CD O O CD CD CD CD CDO O O CD O O CI N N N N N N N N N CAN N CA N N N ■Go ■Co Solid Waste (%) ■ 19.87% ■ 80.13°0 ■GO ■CO 21 97 HOUSE BILL 1378 SECTION 22 98 City of Denton Summary of Debt Obligations Fiscal Year Ending September 30,2021 TOTAL TAX-SUPPORTED AND REVENUE DEBT HB 1378 Calculation tlt City Calculation t21 Total Authorized Debt Obligations $ 1,346,300,000 $ 1,346,300,000 Total Principal Of All Outstanding Debt Obligations $ 1,197,910,000 $ 1,197,910,000 Combined Principal And Interest Required To Pay All Outstanding Debt Obligations On Time And In Full $ 1,653,406,313 $ 1,653,406,313 TOTAL DEBT SECURED BY AD VALOREM TAXATION Total Authorized Debt Obligations Secured By Ad Valorem Taxation $ 1,004,970,000 $ 456,911,854 Total Principal Of All Outstanding Debt Obligations Secured By Ad Valorem Taxation $ 856,580,000 $ 308,521,854 Combined Principal And Interest Required To Pay All Outstanding Debt Obligations Secured By Ad Valorem Taxation On Time And In Full $ 1,152,237,584 $ 393,710,223 PER CAPITA TOTAL DEBT SECURED BY AD VALOREM TAXATION Total Authorized Debt Obligations Secured By Ad Valorem Taxation Expressed As A Per Capita Amount $ 7,010 $ 3,187 Total Principal Of Outstanding Debt Obligations Secured By Ad Valorem Taxation As A Per Capita Amount $ 5,975 $ 2,152 Combined Principal And Interest Required To Pay All Outstanding Debt Obligations Secured By Ad Valorem Taxation On Time And In Full As A Per Capita Amount $ 8,037 $ 2,746 Population Total Used To Calculate Per Capita Figures 143,366 143,366 Source And Year of Data Used To Calculate Per Capita Figures City of Denton City of Denton Planning Department, Planning Department, 2021 2021 tl)For all"Authorized Debt Obligations"amounts and calculations,the City has included all voted but unissued amounts and all amounts of debt that were authorized by the City Council to be issued,but,as of the end of the fiscal year remained unissued,as well as all outstanding debt as of the end of the fiscal year.The City currently has a$100 million GO ECP Program under existing GO debt authorization- (2)City Calculation excludes general obligation debt issued for Enterprise Funds(Electric,Water,Wastewater and Solid Waste)since the City has paid that debt with revenues from each respective fund. General obligation debt is issued with a limited pledge of Utility System revenue for this purpose. The City currently has a$300 million Utility ECP Program under existing utility debt authorization. 23 99 City of Denton Individual Debt Obligations Fiscal Year Ending September 30, 2021 Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding I Principal&Interest Date Ad Valorem Taxes Received Spent Unspent Moody's S&P Fitch Certificates of obligation, $ 44,675,000.00 $ 23,425,000.00 $ 29,350,028.18 February 15,2032 Yes $ 48,950,741.64 $ 48,950,741.64 $ - Not Rated AA+ AA+ Series 2012 Proceeds from the sale of the Certificates will be used for(a)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions, extensions,renovations and improvements to,the City's solid waste disposal system;(b)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment and flooring;(c)acquisition of vehicles and equipment for the fire,police,streets and traffic control,facilities management,and parks and recreation departments;(d)constructing and improving streets,including installation of traffic signals;(e)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's waterworks and sewer system;(f) acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's electric light and power system;and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers, auditors,and financial advisors,in connection the design of an animal shelter and with said projects and said Certificates General Obligation $ 33,590,000.00 $ 10,460,000.00 $ 11,322,781.29 February 15,2032 Yes $ 4,152,706.97 $ 4,152,706.97 $ - Not Rated AA F A.A i Refunding and Improvement Bonds, Series 2012 Proceeds of the Bonds are expected to be used(i)to refund certain outstanding obligations of the City for debt service savings and(ii)for various street improvements and park land acquisitions and improvements,and(iii)to pay the costs associated with the issuance of the Bonds. Certificates of $ 63,520,000.00 $ 37,815,000.00 $ 45,925,000.27 February 15,2033 Yes $ 67,807,600.00 $ 67,807,600.00 $ - Not Rated AA+ AA+ Obligation,Series 2013 Proceeds from the sale of the Certificates will be used for(a)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions, extensions,renovations and improvements to,the City's solid waste disposal system,including the acquisition of land for the City landfill;(b)renovations to,and equipping of, existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(c)acquisition of vehicles and equipment for the fire,police,building inspections,animal services,streets and traffic control,facilities management,and parks and recreation departments;(d) constructing and improving streets,including installation of traffic signals;(e)acquisition of land for the municipal airport;(t)acquiring,constructing,installing and equipping a public safety training facility;(g)acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to existing fire stations,(h)acquiring, constructing,installing and equipping two animal shelters;(i)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions, renovations and improvements to,the City's waterworks and sewer system;and G)acquisition of equipment for,and acquiring,constructing,installing and equipping additions, extensions,renovations and improvements to,the City's electric light and power system;and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates. 24 100 Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding I Principal&Interest Date Ad Valorem Taxes Received Spent Unspent Moody's S&P Fitch General Obligation $ 10,735,000.00 $ 5,490,000.00 $ 6,340,468.81 February 15,2033 Yes $ 4,081,275.34 $ 4,081,275.34 $ - Not Rated AA+ AA+ Refunding and Improvement Bonds, Series 2013 Proceeds of the Bonds are expected to be used(i)to refund certain outstanding obligations of the City for debt service savings;(ii)for various street improvements,and(iii)to pay the costs associated with the issuance of the Bonds. Certificates of Obligation, $ 89,180,000.00 $ 69,000,000.00 $ 100218,768.75 February 15,2044 Yes $ 93,781,044.89 $ 93,781,044.89 $ - Not Rated AA+ AA+ Series 2014 Proceeds of the sale of the Certificates will be used(a)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions,extensions, renovations and improvements to,the City's solid waste disposal system,including the acquisition of land for the City landfill;(b)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(c)acquisition of vehicles and equipment for the fire,police,building inspections,animal services,streets and traffic control,facilities management,and parks and recreation departments;(d) constructing and improving streets,including installation of traffic signals;(e)acquiring,constructing,installing and equipping hangars for the municipal airport;(f)acquiring, constructing,installing and equipping additions,extensions,renovations and improvements to the Civic Center Pool facilities;(g)acquiring,constructing,installing and equipping replacement facility for Fire Station Number 21 including related site preparation;(h)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's waterworks and sewer system;(i)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's electric light and power system;and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates. Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding Principal&Interest Date Ad Valorem Taxes Received Spent Unspent Moody's S&P Fitch General Obligation $ 7,330,000.00 $ 2,880,000.00 $ 3,542,750.02 February 15,2034 Yes $ 4,063,543.45 $ 4,063,543.45 $ - Not Rated AA+ AA+ Refunding and Improvement Bonds, Series 2014 Proceeds of the Bonds are expected to be used(i)to refund certain outstanding obligations of the City for debt service savings;(ii)for various street improvements,and(iii)to pay the costs associated with the issuance of the Bonds. General Obligation $ 27,155,000.00 $ 13,200,000.00 $ 14,065,000.00 February 15,2025 Yes $ 147,264.26 $ 147,264.26 $ - Not Rated AA+ AA+ Refunding Bonds,Series 2014 Proceeds of the Bonds are expected to be used(i)to refund certain outstanding obligations of the City for debt service savings;(ii)to refinance a portion of the City's contractual obligations to the Texas Municipal Power Agency(the"TMPA")under a power sales contract with the TMPA,specifically in respect to the refunding of approximately $13,430,000 in maturity value of certain outstanding TMPA bonds;and(iii)to pay the costs associated with the issuance of the Bonds. Certificates of Obligation, $ 93,015,000.00 $ 72,320.00 $ 110,278,528.00 February 15,2045 Yes $ 97,983,335.00 $ 96,003,428.72 $ 1,979,906.28 Not Rated AA+ AA+ Series 2015 25 101 Proceeds of the sale of the Certificates will be used(a)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions,extensions, renovations and improvements to,the City's solid waste disposal system,including the acquisition of land for the City landfill;(b)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(c)acquisition of vehicles and equipment for the fire,police,building inspections,animal services,streets and traffic control,facilities management,and parks and recreation departments;(d)acquiring, constructing,installing and equipping parking facilities;(e)acquisition of land and buildings to be used for administration facilities and/or park purposes;(f)acquiring, constructing,installing and equipping additions,extensions,renovations and improvements to the Civic Center Pool facilities;and(g)acquiring,constructing,installing and equipping replacement facility for Fire Station Number 2,including related site preparation,and acquiring,constructing,installing and equipping a new fire station,including the acquisition of land therefor;(h)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's waterworks and sewer system;and(i)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions, renovations and improvements to,the City's electric light and power system,and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates. Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding I Principal&Interest Date Ad Valorem Taxes Received Spent Unspent Moody's S&P Fitch General Obligation $ 37,640,000.00 $ 26,755,000.00 $ 32,762,458.00 February 15,2035 Yes $ 23,013,424.58 $ 23,013,424.58 $ - Not Rated AA+ AA+ Refunding and Improvement Bonds, Series 2015 Proceeds of the Bonds are expected to be used(i)to refund certain outstanding obligations of the City for debt service savings;(ii)for street improvements,public safety facilities improvements,stormwater drainage and flood control improvements,and park system improvements,and(iii)to pay the costs associated with the issuance of the Bonds. General Obligation $ 33,945,000.00 $ 6,675,000.00 $ 7,126,250.00 February 15,2026 Yes $ 163,600.05 $ 163,600.05 $ - Not Rated AA+ AA+ Refunding Bonds,Series 2015 Proceeds of the Bonds will be used(i)to currently refund in part,and advance refund in part,certain outstanding obligations of the City for debt service savings;(ii)to refinance a portion of the City's contractual obligations to the Texas Municipal Power Agency(the"TMPA")under a power sales contract with the TMPA,specifically in respect to the refunding of approximately$3,430,000 in maturity value of certain outstanding TMPA bonds;and(iii)to pay the costs associated with the issuance of the Bonds. Certificates of Obligation, $ 83,305,000.00 $ 66,445,000.00 $ 98,299,872.11 February 15,2046 Yes $ 92,340,554.08 $ 80,935,881.54 $ 11,404,672.54 Not Rated AA+ AA+ Series 2016 Proceeds from the sale of the Certificates will be used(a)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions,extensions, renovations and improvements to,the City's solid waste disposal system,including the acquisition of land for the City landfill;(b)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(c)acquisition of vehicles and equipment for the fire,police,building inspections,community improvement services,animal services,streets and traffic control,facilities management,and parks and recreation departments;(d)acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to parking facilities;(e)constructing and improving streets,including landscaping,drainage,utility line relocations and the acquisition of land and rights-of-way therefor;(f)acquiring,constructing,installing and equipping a new fire training facility;and(g)acquisition of land for a new fire station;(h)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's waterworks and sewer system;and(i)acquisition of equipment for,and acquiring,constructing, installing and equipping additions,extensions,renovations and improvements to,the City's electric light and power system,and also for the purpose of paying all or a portion of 26 102 the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates. Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding Principal&Interest Date Ad Valorem Taxes Received Spero Unspent Moody's S&P Fitch General Obligation $ 28,930,000.00 $ 22,390,000.00 $ 27,280,950.00 February 15,2036 Yes $ 16,915,296.52 $ 16,915,296.52 $ - Not Rated AA+ AA+ Refunding and Improvement Bonds, Series 2016 Proceeds of the Bonds are expected to be used(i)to refund certain outstanding obligations of the City for debt service savings;(ii)for street improvements,public safety facilities improvements,stormwater drainage and flood control improvements,and park system improvements,and(iii)to pay the costs associated with the issuance of the Bonds. General Obligation $ 38,425,000.00 $ 24,825,000.00 $ 29,637,650.00 February 15,2030 Yes $ 175,656.87 $ 175,656.87 $ - Not Rated AA+ AA+ Refunding Bonds,Series 2016 Proceeds from the sale of the Bonds,together with funds contributed by the City,are expected to be used(i)refund all outstanding obligations of the City's Utility System for debt service savings;and(ii)to pay the costs associated with the issuance of the Bonds. Utility System Revenue $ 214,890,000.00 $ 199,340,000.00 $ 289,210,000.00 December 1,2037 No $ 246,164,298.03 $ 238,155,809.06 $ 8,008,488.97 Not Rated AA- A+ Bonds,Series 2017 Proceeds from the sale of the Series 2017 Bonds will be used to(a)acquire and construct additions and improvements to the City's electric light and power system including new quick start peak power generation facilities;(b)fund capitalized interest on the Series 2017 Bonds;and(c)pay the costs of issuance in connection with the issuance of the Series 2017 Bonds. Certificates of Obligation, $ 90,800,000.00 $ 72,140,000.00 $ 110,903,600.00 February 15,2047 Yes $ 98,365,003.11 $ 79,530,796.59 $ 18,834,206.52 Not Rated AA+ AA+ Series 2017 Proceeds from the sale of the Certificates will be used for(a)acquisition of vehicles and equipment for,and acquiring,constructing,installing and equipping additions, extensions,renovations and improvements to,the City's solid waste disposal system;(b)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(c)acquisition of vehicles and equipment for the fire,police,building inspections,community improvement services,animal services,streets and traffic control,facilities management,and parks and recreation departments;(d)acquiring, constructing,installing and equipping additions,extensions,renovations and improvements to parking facilities;(e)constructing and improving streets,including landscaping, drainage,utility line relocations and the acquisition of land and rights-of-way therefor;(f)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's electric light and power system;and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates. 27 103 Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding I Principal&Interest Date Ad Valorem Taxes Received Spent Unspent Moody's S&P Fitch General Obligation $ 29,105,000.00 $ 15,590,000.00 $ 19,708,365.81 February 15,2037 Yes $ 17,294,870.71 $ 15,797,309.36 $ 1,497,561.35 Not Rated AA+ AA+ Refunding and Improvement Bonds, Series 2017 Proceeds of the Bonds are expected to be used(i)to refund certain outstanding obligations of the City described on Schedule I attached hereto(the"Refunded Obligations")for debt service savings;(ii)for street improvements and public safety facilities improvements,and(iii)to pay the costs associated with the issuance of the Bonds. General Obligation Bonds, $ 19,235,000.00 $ 17,375,000.00 $ 23,294,812.87 February 15,2038 Yes S 19,871,127.54 $ 2,277,313.44 $ 17,593,814.10 Not Rated AA+ AA+ Series 2018 Proceeds of the Bonds are expected to be used(i)street improvements,storm water drainage and flood control improvements,and park system improvements;and(ii)to pay the costs associated with the issuance of the Bonds. Certificates of Obligation, $ 9,555,000.00 $ 6,940,000.00 $ 8,701,687.56 February 15,2038 Yes $ 10,020,369.57 $ 9,534,741.93 $ 485,627.74 Not Rated AA+ AA+ Series 2018 Proceeds will be used for(a)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(b)acquisition of vehicles and equipment for the fire,police,building inspections,community improvement services,animal services,streets and traffic control,facilities management,and parks and recreation departments;(c)acquiring,constructing,installing and equipping additions,extensions, renovations and improvements to runways and taxiways at the municipal airport;and(d)acquiring,constructing,renovating,installing and equipping fire stations,including the acquisition of land therefor:and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects, attorneys,map makers,auditors,and financial advisors,in connection with said projects and the Certificates(see"Plan of Financing"). Certificates of Obligation, $ 29,545,000.00 $ 25,795,000.00 $ 34,845,128.26 February 15,2038 Yes $ 31,802,096.74 $ 11,213,890.69 $ 20,588,206.05 Not Rated AA+ AA+ Series 2018A Proceeds from the sale of the Certificates will be used for(a)renovating,constructing,expanding,improving and equipping existing municipal service center building;(b) constructing and improving streets,including landscaping,drainage,utility line relocations and the acquisition of land and rights-of-way therefor;(c)constructing,reconstructing and improving vehicle roadways at the municipal airport;(d)acquiring,constructing,installing and equipping fire stations,including the acquisition of land therefor;(e) acquiring,constructing,installing and equipping a public safety facility for the police department,including the acquisition of land therefor;(acquiring and installing a radio communications system for the City;and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers, architects,attorneys,map makers,auditors,and financial advisors. General Obligation $ 44,340,000.00 $ 35,110,000.00 $ 42,453,200.00 February 15,2039 Yes $ 48,176,707.02 $ 28,738,853.14 $ 19,437,853.88 Not Rated AA+ AA+ Refunding&bnprovemera Bonds,Series 2019 (i)up to$28,620,000 for the public purpose of refunding the Refunded Obligations,(ii)for the purpose of the acquisition of property and making improvements for public purposes in said Issuer,to wit:(A)$14,580,000 for street improvements,(B)$705,000 for stormwater drainage and flood control improvements,and(C)$4,085,000 for park system improvements. 28 104 Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding Principal&Interest Date Ad Valorem Taxes Received spent Unspent Moody's S&P Fitch Certificates of Obligation, $ 28,755,000.00 $ 25,480,000.00 $ 34,168,875.00 February 15,2049 Yes $ 30,516,238.82 $ 8,201,693.07 $ 22,314,545.75 Not Rated AA+ AA+ Series 2019 Proceeds will be used for acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the(a) Issuer's waterworks system;(b) Issuer's wastewater system;and(c)the Issuer's electric light and power system;and also for the purpose of paying all or a portion of the Issuer's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates of Obligation;and up to$10,110,000 in principal amount for the purpose of:renovations to,and equipping of,existing municipal buildings,(a)including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(b)acquisition of vehicles and equipment for the fire,police, building inspections,community improvement services,animal services,streets and traffic control,facilities management,and parks and recreation departments;(c) constructing and improving streets,including landscaping,drainage,utility line relocations and the acquisition of land and rights-of-way therefor;(d)acquiring,constructing, installing and equipping a public safety facility for the police department,including the acquisition of land therefor;(e)acquiring,extending,constructing,renovating,improving and equipping parking facilities,including the acquisition of land therefor;and(f)acquisition and installation of technology equipment including computer equipment and software for various municipal departments;and also for the purpose of paying all or a portion of the Issuer's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates of Obligation. General Obligation $ 62,080,000.00 $ 54,950,000.00 $ 67,084,325.00 February 15,2040 Yes $ 70,866,955.65 $ 44,329,910.81 $ 26,537,044.84 Not Rated AA+ AA+ Refunding&Improvement Bonds,Series 2020 Proceeds of the Bonds are expected to be used for(i)various street improvements,park system improvements and public safety facilities for the police department,(ii)to refund the bonds described in Schedule I—Schedule of Refunded Obligations(the"Refunded Obligations")for debt service savings and(iii)to pay the costs associated with the issuance of the Bonds(see"Plan of Financing"). Certificate of0bligations, $ 58,080,000.00 $ 56,005,000.00 $ 73,656,525.00 February 15,2050 Yes $ 64,267,138.90 $ 3,548,011.30 $ 60,719,127.60 Not Rated AA+ AA+ Series 2020 Proceeds will be used for the purpose of paying all or a portion of the Issuer's contractual obligations incurred pursuant to contracts for the purchase,construction and acquisition of certain real and personal property,to wit:up to$37,120,000 in principal amount for the purpose of:(a)acquisition of equipment for,and acquiring,constructing, installing and equipping additions,extensions,renovations and improvements to,the Issuer's wastewater system;and(b)acquisition of equipment for,and acquiring, constructing,installing and equipping additions,extensions,renovations and improvements to,the Issuer's electric light and power system;and also for the purpose of paying all or a portion of the Issuer's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates of Obligation;and up to$27,250,000 in principal amount for the purpose of:(a)acquisition of vehicles and equipment for the fire,police,building inspections,community improvement services,animal services,streets and traffic control,facilities management,and parks and recreation departments;(b) acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to existing fire stations;(c)acquiring,constructing,reconstructing, renovating,installing and equipping a municipal government building for municipal development services and other municipal administrative purposes,and the acquisition of land and interests in land and properties therefor;(d)acquiring,constructing,reconstructing,renovating,installing and equipping municipal parks;(e)acquiring land and building for facility for homeless and indigent shelter and services;and also for the purpose of paying all or a portion of the Issuer's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and said Certificates of Obligation(collectively, the"Projects"). 29 105 Outstanding Debt Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Current Credit Rating Obligations Issued Outstanding I Principal&Interest Date Ad Valorem Taxes Received Spent Unspent Moody's S&P Fitch General Obligation $ 14,150,000.00 $ 13,770,000.00 $ 17,012,250.00 February 15,2031 Yes $ 17,031,194.53 $ - $ 17,031,194.53 Not Rated AA+ AA+ Refunding Bonds,Series 2020A Proceeds of the Bonds are expected to be used for(i)to refund the bonds described in Schedule I—Schedule of Refunded Obligations(the"Refunded Obligations")for debt service savings and(ii)to pay the costs associated with the issuance of the Bonds(see"Plan of Financing"). Certificates of Obligation, $ 97,035,000.00 $ 97,035,000.00 $ 132,633,585.91 February 15,2021 Yes $ 104,246,452.67 $ 40,231,923.09 $ 64,014,529.58 Not Rated AA+ AA+ Series 2021 Proceeds from the sale of the Certificates will be used for(i)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's waterworks and wastewater system;(ii)acquisition of equipment for,and acquiring,constructing,installing and equipping additions, extensions,renovations and improvements to,the City's electric light and power system;(iii)constructing and improving streets,including landscaping,drainage,utility line relocations and the acquisition of land and rights-of-way therefor;(iv)acquisition of vehicles and equipment for the fire,police,building inspections,community improvement services,animal services,streets and traffic control,facilities management,and parks and recreation departments;(v)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(vi)acquisition and installation of technology equipment including computer equipment and software for various municipal departments;(vii)constructing,reconstructing,renovating,installing and equipping facility for homeless and indigent shelter and services;and(viii)renovations to,expansion of,and equipping existing municipal vehicle maintenance facility;and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and the Certificates(see"Plan of Financing"). General Obligation Bonds, $ 54,710,000.00 $ 54,710,000.00 $ 71,624,723.12 February 15,2041 Yes $ 59,608,180.12 $ 4,898,180.12 $ 54,710,000.00 Not Rated AA+ AA+ Series 2021 Proceeds from the sale of the Certificates will be used for(i)acquisition of equipment for,and acquiring,constructing,installing and equipping additions,extensions,renovations and improvements to,the City's waterworks and wastewater system;(ii)acquisition of equipment for,and acquiring,constructing,installing and equipping additions, extensions,renovations and improvements to,the City's electric light and power system;(iii)constructing and improving streets,including landscaping,drainage,utility line relocations and the acquisition of land and rights-of-way therefor;(iv)acquisition of vehicles and equipment for the fire,police,building inspections,community improvement services,animal services,streets and traffic control,facilities management,and parks and recreation departments;(v)renovations to,and equipping of,existing municipal buildings,including the acquisition and installation of replacement heating,venting and air conditioning equipment,roofing and flooring;(vi)acquisition and installation of technology equipment including computer equipment and software for various municipal departments;(vii)constructing,reconstructing,renovating,installing and equipping facility for homeless and indigent shelter and services;and(viii)renovations to,expansion of,and equipping existing municipal vehicle maintenance facility;and also for the purpose of paying all or a portion of the City's contractual obligations for professional services,including engineers,architects,attorneys,map makers,auditors,and financial advisors,in connection with said projects and the Certificates(see"Plan of Financing"). Utility System Revenue $ 141,990,000.00 $ 141,990,000.00 $ 211,958,729.15 December 1,2036 No $ 141,990,000.00 $ - $ 141,990,000.00 Not Rated AA A+ Refunding Bonds,Taxable Series 2021 Proceeds from the sale of the Taxable Series 2021 Bonds will be used to(a)refund outstanding commercial paper notes("Refunded Notes");and(b)pay the costs of issuance in connection with the issuance of the Taxable Series 2021 Bonds(See"Plan of Financing—Purpose"and"Plan of Financing—Refunded Notes") 30 106 Principal Principal Combined Final Maturity Secured By Total Proceeds Proceeds Proceeds Issued Outstanding Principal&Interest Date Ad Valorem Taxes Received Spent Unspent $ 1,528,660,000.00 $ 1,125,662,320.00 $ 1,653,406,313.11 $ 1,448,510,900.65 $ 961,364,120.92 $ 487,146,779.73 31 107 GL OSSAR Y OF TERMS The HB 1378 Section of the Annual Debt Report contains terminology provided by the Texas Comptroller's Office. To assist the reader of this document in understanding these terms, a glossary of terms has been included in the document as provided by the Texas Comptroller's Office. Political Subdivision. Political subdivisions are counties, municipalities, school districts, junior college districts, other special districts, or other subdivisions of state government. Total Authorized Debt Obligations. Debt obligations are defined in the bill as issued public securities which are instruments, including bonds, certificates, notes, or other types of obligations authorized to be issued by an issuer under a statute, a municipal home-rule charter, or the constitution of this state. Issuance is the process of authorizing, selling, and delivering public debt. Public security authorization means a resolution, order or ordinance that is approved or adopted, or any other action taken in a proceeding, by the governing body of an issuer in authorizing the issuance of a public security. Total Principal of all Outstanding Debt Obligations. Total amount borrowed (par) of all obligations that have yet to be repaid. Combined Principal and Interest required to pay all Outstanding Debt Obligations on time and in full. Total amount borrowed (par)that has yet to be repaid plus the cost of interest. Total Authorized Debt Obligations Secured by Ad Valorem Taxation. Total debt obligations secured by a pledge of property taxes. Total Principal of all Outstanding Debt Obligations secured by Ad Valorem Taxation. Total amount borrowed (par) of obligations secured by a pledge of property taxes that have yet to be repaid. Combined Principal and Interest required to pay all Outstanding Debt Obligations secured by Ad Valorem Taxation on time and in full. Total amount borrowed (par) of all property tax-secured obligations plus the cost of interest. Total Authorized Debt Obligations secured by Ad Valorem Taxation expressed as a Per Capita Amount. Total authorized debt obligations secured by a pledge of property taxes divided by the population of the political subdivision. Total Principal of Outstanding Debt Obligations secured by Ad Valorem Taxation as a Per Capita Amount.Total amount borrowed (par) secured by a pledge of property taxes divided by the population of the political subdivision. Combined Principal and Interest required to pay all Outstanding Debt Obligations secured by Ad Valorem Taxation on time and in full as a Per Capita Amount. Total debt obligations secured by a pledge of property taxes plus the cost of debt service on these obligations divided by the population of the political subdivision. Population total used to calculate per capita figures. The denominator used to calculate per capita figures. This is a population total for the political subdivision. Source and Year of population figure used to calculate Per Capita figures. The source of population data comprising the denominator of per capita figures. Outstanding Debt Obligation. An issued public security that has yet to be repaid. 37 108 GL OSSAR Y OF TERMS Conduit or Component Debt. Debt that is not a legal liability of the political subdivision but is secured by another entity. Principal Issued. Total amount borrowed (par). Principal Outstanding.Total amount borrowed (par) of obligation that has yet to be repaid. Combined principal and interest required to pay each Outstanding Debt Obligation on time and in full. The total amount borrowed (par) plus the cost of interest for each individual debt obligation or bond series. Final Maturity Date. The final payment date of individual debt obligation at which point all principal and interest will be paid off. Secured in any way byAd Valorem Taxes. Indicates which individual debt obligations are in part or whole pledged with property taxes. Total Proceeds Received. Total assets received from the sale of a new issue of public securities. Proceeds Spent. The portion of total proceeds received that have been spent. Proceeds Unspent.The portion of total proceeds received that are remaining to be spent. Official stated purpose for which the debt obligation was authorized. The reason for the debt issuance as defined in ballot language, if applicable, or the Official Statement. Current Credit Rating. Existing rating given by any nationally recognized credit rating organization to debt obligations. 38 109 Date: February 25,2022 Report No. 2022-014 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Motor vehicle equipment enforcement EXECUTIVE SUMMARY: A request for information about Denton Police Department enforcement of equipment violations and dispositions was received from Council Member Armintor on February 11, 2022. This Informal Staff Report provides Mayor Hudspeth and Council information on where enforcement authority originates from as well as information on traffic stops from the 2021 Annual Traffic Contact Report. DISCUSSION: For well over three decades, the policy of the Denton Police Department has been to educate the motoring public regarding traffic regulations. This approach is facilitated through education programs as well as enforcement of those regulations on the street. Enforcement of traffic regulations may consist of verbal warnings, written warnings, citations, and/or physical arrests. The intention of these efforts is to achieve voluntary compliance of the motoring public with these traffic regulations. When delving into the authority that the Denton Police Department has for enforcement of traffic regulations, it begins with statutory authority. Officers of the Denton Police Department are recognized,by definition, as Peace Officers in Art. 2.12 of the Code of Criminal Procedure. As part of this recognition, they are granted the ability to regulate traffic under Section 541.002 of the Transportation Code. Under the City of Denton Municipal Ordinances, Section 23-1, officers are invested with the power and authority given to them as peace officers to enforce all City of Denton ordinances and regulations within the corporate limits of the city. The majority of equipment-related regulations within the city fall under State law. The State takes the viewpoint that having mechanically safe vehicles on the roadway equipped with identified pieces of equipment is beneficial for the safety of the motoring public. When an officer makes a stop on a vehicle for a violation, that identified violation is the first item of business for the officer to resolve. If the equipment violation is the only violation discovered and the driver has a current license along with proof of financial responsibility, then a warning may be applicable. It should be noted that equipment-related offenses are ones that can be dismissed by the court if the defendant remedies the defective equipment prior to their first court appearance and pays a reimbursement fee, not to exceed$10 (Sec. 547.004 Transp. Code). Once contact with the driver of the vehicle stopped is made, officer observations and investigations can have an effect on the outcome of the stop. If once contact is made, the officer makes other observations that warrant additional investigation for other violations,potentially criminal, then it is quite possible that the driver may be arrested from a stop that began with an equipment violation. Examples of these type of offenses may be Driving While Intoxicated (DWI), weapons offenses, narcotics violations, or outstanding warrants. Furthermore, if the 110 Date: February 25,2022 Report No. 2022-014 officer determines that the violation warrants a citation, but the officer is unable to positively identify the driver, or the driver refuses to sign the citation (promise to appear), an arrest may be made to bring that person in front of a magistrate immediately. Section 543.001 and 543.005 of the Transportation Code provides the authority for this outcome. As a part of the Annual Traffic Contact Report, there were 12,018 traffic stops conducted by the Department. The report shows 2,281 traffic stops were for issues related to equipment violations. From the information available from the Annual Traffic Contact Report, the following disposition for the overall number of traffic stops showed the following: • Verbal Warning—5716 • Written Warning— 1361 • Citation—4152 • Written Warning and Arrest— 5 • Citation and Arrest—62 • Arrest—722 o Arrest Based on Violation of Traffic Law—40 These numbers indicate a very low percentage of traffic stops for violations of traffic law that resulted in arrests. The department continues to utilize our social media channels and the City of Denton Communications team to facilitate the sharing of pertinent information related to traffic safety and will continue in this effort. Please feel free to reach out to me if you have any questions or concerns. STAFF CONTACT: Frank Dixon, Chief of Police/Interim Assistant City Manager 940-349-7925 Frank.dixon(aD cityofdenton.com REQUESTOR: Council Member Deb Armintor STAFF TIME TO COMPLETE REPORT: 4 hours 111 FY 21/ 22 Council Requests Open Requests Requests Answered by Department FY All Time Request Volume by 20/21 Council Person Paul Meltzer Deb Armintor Community Svcs - Jesse Davis Environmental Svcs Mayor Gerard Hudspeth Public Works - Vkki Byrd Capital Projects Brian Beck Utilities 11°Y. 23% Alison Maguire CMO - 0 2 4 6 8 10 Library Legal Fire 1 Police - Requests made by Quarter Tech Services 1 Airport 1 200 Public Affairs/Customer Svc _ 97 101 Economic Development 100 0 0 Development Svcs 0 Finance Paul Meltzer• Deb Armintor• Jesse Davis Q121/22 022122 Q32122 Q42122 Audit • Mayor GerardHudspeth• VkkiByrd Municipal Court Brian Beck• Alison Maguire Procurement Real Estate 1 Risk Total Open Elected Official Other Some requests involve multiple departments,causing the Requests 0 10 20 30 40 total requests by department to add up higher than the Submit New total request count 18 Request 112 Policy and Worksession Requests smartsheet DepartmentI . Rom -nary of ReqUest Staff Assigned 1 Council Member Davis 01/31/22 Can staff provide a winter weather update on city facilities? Scott Gray Facilities Information will be provided in a future Friday Report. 0 Mayor Pro Tom Meltzer 02/08/22 When was the issue of the historic-style lamp posts being non-Dark Skies compliant last presented Antonio Puente DME Information will be provided in a future Friday Report. Z to council?Regarding the lights,could there be a cone inside the globe over the bulb that would accomplish what we want without altering the exterior appearance as dramatically as the exterior "hat"we looked at would? 3 Council Member Armintor 02/11/22 Question whether DPD initiates traffic stops for broken tail lights and if those stops escalate to Frank Dixon Police Information will be provided in a future Friday report. arrests 4 Mayor Hudspeth 02/14/22 Coordinate meeting to discuss tuition-free preschools. David Gaines,Edcs Sullivan Economic Development Information will be provided in a future Friday report. 5 O Mayor Pro Tem Meltzer 02/15/22 Can staff assist resident with HLC approval for home improvements? Scott McDonald,Tina Firgens Development Services Information will be provided in the Feb.25 Friday report. 6 Council Member Maguire 02/16/22 Can staff review the lactation policy to determine whether any updates are needed? Tiffany Thomson Human Resources Information will be provided in a future Friday report. 7 O Council Member Beck 02/17/22 Can staff interpret demand based on recent bed counts at the city's partner agencies during cold Dani Shaw Community Services Information will be provided in a future Friday report. weather? 6 O Mayor Pro Tom Meltzer 02/17/22 Can staff investigate a barking dog complaint sent to MPT Meltzer&CM Beck? Dani Shaw Animal Services Information will be provided in the Feb.25 future Friday report. g O Mayor Pro Tom Meltzer 02/17/22 Can staff address a resident's concern that some developers can bypass the city's review/approval Scott McDonald,Tina Firgens Development Services Information will be provided in a future Friday report. process for new developments? 10 Mayor Pro Tom Meltzer 02/18/22 Can staff provide contact information on the owners of the property to the south and west of Good Scott McDonald,Tina Firgens Development Services Information will be provided in a future Friday report. Sam on Hinkle and arrange for those properties to be kept free of brush and overgrowth? 1 1 Council Member Maguire 02/21/22 Forward of a resident concern regarding trash near a construction site Dan!Shaw,Scott McDonald Community Services Development Information will be provided to CM Maguire and in a future Friday Services report. 17 Q Mayor Pro Tom Meltzer 02/21/22 Location of an ADA restroom at the MILK Rec.Center Gary Packan,Scott Gray Facilities Parks Information will be provided to MPT Meltzer and included in the Feb.25 Friday Report 13 Q Council Member Beck 02/21/22 Forwarding of a resident concern with towing companies and inquiry on policies,procedures and Frank Dixon Police Information will be provided in a future Friday report obligations relating to towing 14 Mayor Pro Tom Meltzer 02/21/22 Forwarding of resident concern with utility pole leaning on shed Antonio Puente DME Staff will reach out to cusotmer and information will be provided in a future Friday report 15 Mayor Pro Tom Meltzer 02/21/22 Can HOT(Homeless Outreach Team)make contact with a group of unhoused individuals behind a Dani Shaw,Frank Dixon Community Services Police Information will be provided in a future Friday report. local business? 16 Council Member Davis 02/23/22 Can staff from Risk Management contact a resident regarding damage to their vehicle from a Deby Skawinski Risk Management Information will be provided in a future Friday report. construction plate in the road? 17 U Council Member Beck 02/24/22 Can staff comment on the use,cost,and efficacy of"speed cushions"in speed regulation and Becky Diviney,Daniel Kremer Capital Projects/Engineering Public Information will be provided in a future Friday report. provide any examples of their use in Denton,if applicable? Works-Streets Council Member Davis 02/24/22 Two-minute Pitch Request:I am requesting a work session for the Council to consider the creation Gary Packer,Tiffany Thomson Human Resources Parks Two-minute pitch request will be scheduled for the 3/22 meeting. 18 of a Emergency Volunteer Corp--from something as simple as an email list of willing helpers,up to an organized group with specific skills and resources including transportation,hauling,tree and brush clearing,meal prep,shelter staffing,etc. Exported on February 25,2022 3:19:19 PM CST 113 Page 1 of 1 February 2022 1 2 3 4 5 2:00 pm-CC Work Session 3:00 PM-Animal Shelter Advisory 8:00 a.m.Agenda Committee 6:30pm-CC Regular Session Committee 8:30 a.m.DEDC 3:00 PM-Health and Building Standards Commission 4:00 PNL Public Art Conurvttee 6 7 8 9 10 11 12 5:30 PM-Internal Audit Advisory 10:00 am-CC Work Session 11:00 a.m.EDPB 8:30 a.m.DEDC 10:00 a.m.-D welopment Code Review Committee 6:00 PM Parks Recreation and Cancelled-3:00 PM-Airport 4:00 M Public Art Committee Beautification Board Advisory Board 12:00 p.m Community Services Advisory 5:00 PM-Planning and Zoning 13 14 15 16 17 18 19 Cancelled-9:00 AM-Public 3:00 pin-CC Work Session 9:00 AM-Nbbility Conurrittee 9:00 am Public Utilities Board Utilities Board 6:30 pin-CC Regular Session Nketing 10:00 am-Joint CC/P&Z Cancelled-3:00 PM-Health and Building Standards Commission 5:30 pm Library Board 5:30 PM-IListoric Landmark Commission 20 21 22 23 24 25 26 4:00 PM-Special Called CC 12:00 PM-CC-City Ivhnager 1:00 PM-Civil Service 3:00 PM-Board ofEthics 10:00 a.m.-Development Code Nbeting Interviews Conmisson Review Committee 5:00 PM-Planning and Zoning 12:00 PM-Bond Oversight Comuttee 6:00 PM-Police Chiefs Advisory Board 1:00 PM-Sustainabrlily Framework 27 28 9:00 AM-Public Utilities Board 11:00 AM-Civil Service Commission 5:30 PM-Zoning Board of Adjustment 5:30 PM-Internal Audit Advisory 5:30 PM-Traffic Safety Commmsion Ngetin 114 March 2022 EMISSION 1 2 3 4 5 2:00 pm-CC Work Session 5:30 PM—historic Landmark 8:00 a.m Agenda Committee 6:30pm-CC Regular Session Conumssion Cancelled-8:30 a.m DEDC 4:00 M Public Art Committee 6 7 8 9 10 11 12 6:00 M Parks Recreation and 3:00 PM—Airport Advisory Board 10:00 a.m—Development Code Beautification Board ReviewConm-&ee 4:00 PM—Planning and Zoning 13 14 15 16 17 18 19 9:00 AM—Public Utilities Board 3:00 PM—Persons w/Disabilities 3:00 PM-Health and Building Standards Corunission 20 21 22 23 24 25 26 5:30 PM—Hstoric Landmark 2:00 pm-CC Work Session 9:00 AM-Mrbility Conmvttee 10:00 a.m—Development Code Commission 6:30 pm-CC Regular Nketing Review Committee Session 1:00 PM—Civil Service Conmvssion 4:00 PM—Planning and Zoning 27 28 29 30 31 9:00 AM—Public Utilities Board 6:00 PM—Board ofEthics 5:30 PM—Zoning Board of Adjustment 115 April 2022 1 2 3 4 5 6 7 8 9 6:00 PIVL Parks Recreation and 2:00 pm-CC Work Session 4:00 M Public Art Committee 10:00 a.m—Development Code Beautification Board 6:30 pm-CC Regular ReviewCorrnnittee Session 3:00 PM-Health and Building Standards Connnission 10 11 12 13 14 15 16 9:00 AM—Public Utilities Board 3:00 PM—Airport Advisory Board 4:00 PM—Planning and Zoning 5:30 PM—Hstoric Landmark Commission 17 18 19 20 21 22 23 5:30 PM-Traffic Safety 2:00 Pm-CC Work Session 9:00 AM-Mobility Conaruttee 3:00 PM-Health and Building 10:00 a.m—Development Code Commission feting 6:30 pm-CC Regular meeting Standards Connnission Review Committee Session 24 25 26 27 28 29 30 9:00 AM—Public Utilities Board 1:00 PM—Civil Service 6:00 PM—Board ofEthics Commisson 5:30 PM—Zoning Board of 4:00 PM—Planning and Zoning Adjustment 5:30 PM—Internal Audit Advisory 116 Tentative Work Session Topics and Meeting Information Updated: February 25, 2022 Meeting Date Item Le istar ID I Departments Involved Type Estimated Time Audit of Energy Management Office Admin(&Closed Meeting) 21-2402 Internal Audit Internal Audit Report 0:30 Public Safety Drone Program 22-120 Police City Business 1:00 Solid Waste Strategy Follow-up 22-373 Solid Waste Council Priority 0:45 March 1,2022 Parkland Dedication and Park Development Fees 21-2142 Parks&Recreation City Business 1:00 Work Session(@2:00 p.m.) Covid Update 22-501 City Manager's Office Council Priority 0:30 Regular Meeting(@6:30 p.m.) Closed Meeting Item(s): Energy Mgmt Office Audit 22-311 Internal Audit;Legal City Business 0:30 Total Est.Time: 4:15 Other Major Items for Meeting: Public Hearing on Comp Plan&Mobility Plan March 15,2022 NO MEETING-Spring Break(March 14-18) Audit: Energy Portfolio Management:Renewable Denton Plan Reporting 22-475 Internal Audit City Business 0:30 Leave Policies 22-179 Human Resources Council Request 1:00 Annual Financial Audit 21-2786 Finance City Business 0:30 March 22,2022 Sustainability Framework Fund Workplan(FY 21-22) 22-161 Environmental Services City Business 1:00 Work Session(@2:00 p.m.) Tax Abatement and Incentives Policy 22-355 Economic Development City Business 1:00 Special Called Meeting Covid-19 Update 22-316 City Manager's Office Council Priority 0:30 Two-Minute Pitch: 22-156 City Manager's Office Council Request 0:30 Closed Meeting Item(s) I N/A Legal I City Business 0:30 Total Est.Time: 5:30 Other Major Items for Meeting: (1)Public Hearing on Comp Plan;(2)Consideration of Disaster Declaration and Order;(3)NDO Wastewater Collections Audit 21-2781 Internal Audit City Business 0:30 CIP:Property Acquisition Follow-Up 21-2779 Internal Audit City Business 0:30 Prioritizing Area Plans 21-2676 Development Services City Business 1:00 Building Codes,International Residential Code,International Fire Code 21-2633 Building Inspections City Business 0:30 Roadway Impact Fees 21-2604 Engineering/Capital Projects City Business 1:00 April 5,2022 Council Request Work Session(@2:00 p.m.) Street Sign Topper Program 22-469 Planning Byrd(9/14/2021 and 1:00 Regular Meeting(@6:30 p.m.) 2/1/2022) Two-Minute Pitch: None this meeting lCity Manager's Office lCouncil Request N/A ooseoeoet N/A Legal City BusinessTotal Est.Time: 5:00 Meeting: Wastewater Reclamation Audit 22-243 Internal Audit City Business 0:30 Automated Notification Dashboard 22-386 Development Services Council Request 0:30 Tent/Tiny Home Village RFI 22 374 Community Development Council Initiated 1:00 April 19,2022 Procurement Work Session(@2:00 p.m.) Fire Department Staffing 22-395 Fire City Business 0:30 Regular Meeting(@6:30 p.m.) Update from City DCTA Board Representative 21-2804 City Manager's Office City Business 0:30 Two-Minute Pitch: 22-054 City Manager's Office Council Request 0:30 Closed Meeting Items) N/A Legal City Business 0:30 Total Est.Time: 4:00 Other Major Items for Meeting: May 3,2022 Work Session(@2:00 p.m.) Regular Meeting(@6:30 p.m.) Two-Minute Pitch: 22-121 City Manager's Office Council Request 0:30 Closed Meeting Item(s) N/A Legal City Business 0:30 Total Est.Time: 1:00 Other Major Items for Meeting: American Rescue Plan Act of 2021&2nd Year ARP Funds 22-266 Finance City Business 1:00 May 17,2022 Work Session(@2:00 p.m.) Regular Meeting(@6:30 p.m.) Two-Minute Pitch: 22-122 City Manager's Office Council Request 0:30 Closed Meeting Item(s) N/A Legal City Business 0:30 Total Est.Time: 2:00 Other Major Items for Meeting:Canvass General Election,Order Runoff if needed Electric Rates and Budget 21-2405 Finance City Business 3:00 Update from City DCTA Board Representative 21-2805 City Manager's Office City Business 0:30 Audit Project 028-Warehouse Operations 21-281 Internal Audit City Business 0:30 June 7,2022 Work Session(@2:00 p.m.) Regular Meeting(@6:30 p.m.) Two-Minute Pitch: 22-419 City Manager's Office Council Request 0:30 Closed Meeting Item(s) N/A Legal City Business 0:30 Total Est.Time: 5:00 Other Major Items for Meeting: FY 2022-23 CIP 22-246 Finance City Business 3:00 June 28,2022 Work Session(@2:00 p.m.) Regular Meeting(@6:30 p.m.) Two-Minute Pitch: 22-420 City Manager's Office Council Request 0:30 Closed Meeting Item(s) N/A Legal City Business 0:30 Total Est.Time: 4:00 Other Major Items for Meeting: Item Legistar ID Departments Type Estimated Work Session Date Economic Development Programs and Policy Discussion 21-1330 Economic Development City Business Date/:45 Sanger ETJ Boundary Adjustment 21-2653 Development Services City Business Date/:45 Work Session Dates to be Determined Estimated Work Item Dates Departments Type Session Date Council Priorities and Significant Work Plan FY 2022-23 Budget Development February-October Finance Budget Summer 2022 Items to be Scheduled 2022 All other departments Procurement of a"tiny home"Housing Solution(requested from Housing Study Work Session) June Community Services Council Priority June Item Date Approved Department Estimated Hours to Requestor Complete Approved Council Request Work Sessions to be Traffic Feedback Signs(Report only;no work session) I Feb.1,2022 IPublic Works-Streets I I Hudspeth Scheduled *This is for planning purposes only.Dates are subject to change. 117 1 Street Closure Report: Upcoming Closures smartsheet SCR Feb 28th - Mar 6th Street/Intersection I Description Department Contact Bell Ave Texas St Withers St 03/12/22 04/15/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bernard St Hickory St Chestnut St 07/11/23 08/21/23 Water Distribution will be Water Tiffany Sherrane 2 replacing the water main line and services. Bonnie Brae Scripture Emery 03/21/22 04/01/22 DME is performing OPGW Other Mark Zimmerer 3 conductor replacement on the Hickory to Bonnie Brae electric transmission line. 4 Mockingbird LN Paisley St. Barnes Dr. 03/07/22 02/18/22 Storm Drain connection Private Development Public Armando Beltran Works Inspections Exported on February 25,2022 11:06:34 AM CST 118 Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End I Street/Intersection From To Date Date Description Department Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 03/11/22 Street Reconstruction Streets Roy San Miguel 3 Athens Tawakoni New Ballinger 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel Bell Ave Withers St Mingo Rd 01/07/22 03/11/22 Water Distribution will be Water Tiffany Sherrane 4 installing a new water main line and services. Bolivar Mimosa Northridge 03/02/22 03/09/22 Restoring Asphalt from Gas Public Works Inspections Ryan Dromgoole 5 Repair,intersection closed for phase 2,half intersection for phase 1. 6 Brookside Meadow Park Meadow Creek 02/28/22 03/18/22 Concrete Panel Repair Streets Rogelio San Miguel 7 Chestnut Street South Welch Street Bernard Street 10/18/21 03/31/22 Utility installations and Engineering Scott Fettig pavement replacement. 8 Cyrus Way Teal Harvest Glen 01/10/22 03/04/22 Concrete Panel and Sidewalk Streets Roy San Miguel Repair Davis St Jennie St Hattie St 01/31/22 03/22/22 Wastewater Collections will be Wastewater Tiffany Sherrane 9 installing a new wastewater main line and services. Foxcroft Cir Emerson Old North 01/18/22 03/04/22 Residential roadway Engineering Dustin Draper 10 reconstruction and during the construction only resident traffic will be allowed. 11 Jackpine Dr Potterstone St Barrydale Dr 02/21/22 03/11/22 Concrete Panel Repair Streets Rogelio San Miguel 12 Mockingbird Christopher Dr Penniman Dr 03/07/22 03/18/22 Installing Junction Box and Private Development Armando Beltran connecting waterline 13 Montecito Settlement Field Bend 01/18/22 03/04/22 Concrete Street Panel and Streets Roy San Miguel Sidewalk Repair 14 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig closures.Will not be all at one pavement replacement. Scripture St Marietta St Bradley St 02/01/22 03/04/22 Installation of 24"RCP pipe Drainage Gabriel Rodriguez across the Street to a Storm 15 Drain Inlet on the south side of the road on the south side of the Road 16 Stella St. North Texas Blvd Bonnie Brae 10/29/21 05/01/22 Utility installations and Engineering Scott Fettig pavement replacement. 17 Welch Street Eagle Street West Collins St. 11/29/21 03/04/22 Utility installations and Engineering Scott Fettig pavement replacement. Exported on February 25,2022 11:06:43 AM CST 119 Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet I Closure Starr, Closure End I Street/Intersection From Date Date Description Department Department Contact Archer Trail Foxcroft Circle Emerson 11/08/21 02/16/22 Residential roadway Engineering Dustin Draper 1 reconstruction and during the construction only resident traffic will be allowed. Bonnie Brae Street Scripture Panhandle 02/10/22 02/18/22 The contractor will begin Engineering Robin Davis making the connection of the new 42-inch Transmission Main to the existing Main.Therefore, both northbound lanes of Bonnie Brae Street from 2 Scripture to Panhandle Street will be closed.North bound Traffic will be detoured to turn right on Scripture,left on Thomas,and left on Panhandle to finally arrive back on Bonnie Brae Street.Detour signs will be posted accordingly. Foxcroft CIR Archer Trail Emerson 01/05/22 02/04/22 Residential roadway Engineering Dustin Draper reconstruction and during the construction only resident traffic will be allowed. 4 Stuart Rd South of Keystone Court North of Keystone Court 01/24/22 02/02/22 Replacing concrete road panels Private Development Tucker Eller 5 Sweet Gate Lake View Autumn Path 01/03/22 02/18/22 Concrete Street Panel Repair Streets Roy San Miguel Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 01/28/22 Wastewater Collection will be Wastewater Tiffany Sherrane 6 installing a new wastewater main line and services Exported on February 25,2022 11:06:53 AM CST 120 Page 1 of 1