092917 Friday Staff Report ( I) City Manager's Office DENTON 215 E. McKinney St., Denton, TX 76201 • (940) 349-8307 MEMORANDUM DATE: Sept. 29, 2017 TO: The Honorable Mayor Watts and Council Members FROM: Todd Hileman, City Manager SUBJECT: Friday Staff Report I. Council Schedule A. Meetings 1. Closed Meeting of the City Council on Monday, October 2, 2017 at 11:00 a.m. in the City Council Work Session Room. 2. Agenda Committee Meeting on Wednesday, October 4, 2017 at 3:30 p.m. in the City Manager's Conference Room 3. Council Airport Committee on Thursday, October 5, 2017 at 9:00 a.m. in the City Hall Conference Room. II. General Information & Status Updates A. Development Services— Please be informed that Munal Mauladad submitted her resignation this week as the City's Development Services Director due to personal reasons. Scott McDonald, Deputy Director/Chief Building Official, has been named the Interim Department Director. Scott recently joined the organization with more than 25 years of experience in the building industry. Scott can be reached at (940) 349-8539 or Scott.McDonald(kcityofdenton.com. Staff contact: Todd Hileman B. US Conference of Mayors —At the September 19 Council meeting, Mayor Watts requested that the information provided to him in advance of a recent US Conference of Mayors Energy Committee meeting be shared with the rest of Council. DUE staff provided an ERCOT quick fact sheet, an American Wind Energy Association fact sheet, and a summary of wind and renewable energy for ECROT and Denton. Please see attached. Staff contact: Bryan Langley C. Solid Waste Specific Use Permit — During the Citizen Comments portion of the August 15, 2017 and September 19, 2017 City Council meetings, resident Robert Donnelly raised concerns about the Solid Waste Department not being in OUR CORE VALUES Integrity • Fiscal Responsibility • Transparency • Outstanding Customer Service compliance with the Specific Use Permit (SUP) that governs the operation's land use at 1527 Mayhill Road. The attached letter was sent to Mr. Donnelly via mail and email on September 28, 2017. It addresses the passages from the SUP related to Mr. Donnelly's concerns and details the City's plans for addressing the issues he cited. During his presentation, Mr. Donnelly raised concerns about landfill height and the lack of an appropriate landscape buffer. The facility's tallest point is currently under the height limitations required by SUP, the facility's permit, and the mediated settlement agreement (MSA) to which Mr. Donnelly is a party. In regards to the landscape buffer, there is adequate landscaping close to the mobile home park, including new plantings. However,as you move north the landscaping ends and there are large gaps with little to no vegetation. It is our understanding that trees in this area were lost over several years due to drought and disease. Staff is in the process of requesting an assessment by a landscape architect that will address issues with utility infrastructure, a future DME transmission project, and the widening of Mayhill Road. We believe the landscape architect will be selected in the next few weeks, and following receipt of the architect's recommendations, staff will implement the recommended tree planting and maintenance program. Staff contact: Ethan Cox D. Resident Newsletter—The first issue of the Resident Update newsletter has been printed and will arrive in mailboxes beginning this weekend or early next week. A PDF version will also be posted on the website early next week. A hard copy has been provided to Council Members in the Friday packet. Additionally, these newsletters will be mailed to our county, state, and federal legislators. Staff will provide an update on any resident feedback received. The next issue is scheduled to be released the first week of December. Staff contact: Brian Daskam E. National Ni Wit Out —National Night Out is this Tuesday, Oct. 3. National Night Out is an annual community-building campaign that promotes police-community partnerships and neighborhood camaraderie to make our neighborhoods safer, more caring places to live. Millions of neighbors take part in National Night Out across thousands of communities from all fifty states, U.S. territories and military bases worldwide. The Denton Police Department has been promoting National Night Out through social media and has received notice that about 10 neighborhoods plan to host events. Officers will be stopping in to visit the neighborhood events. Staff contact: Shane Kizer /Bryan Cose F. 2017 Neighborhood Empowerment Summit — The 2017 Neighborhood Empowerment Summit will be held on Saturday, Oct. 14 from 9 a.m. — 1 p.m. at the MLK, Jr. Recreation Center. At the Summit there will be presentations and tables with lots of information on how to improve the overall quality of life in neighborhoods. The summit is a FREE event and open to the public. Light breakfast, lunch, and door prizes are included. In order to make appropriate accommodations, staff asks interested participants to register at www.ciiyofdenton.com/neighborhoodplannin2 or call us at (940) 349-8328 by Wednesday, Oct. 11. Please see attached flyer. Staff contact: Ron Menguita G. Fred Moore Athletic Field — The Parks and Recreation Department recently installed an athletic field at Fred Moore Park. This project was funded by the General Fund and a Community Development Block Grant. A sidewalk and a security light were relocated, and irrigation and sod were added to improve the grade and enhance drainage. New features include a water fountain, scoreboard, and bleachers, with a new shade structure scheduled for installation in October. Please see before and after pictures below. Staff contact: Emerson Vorel BEFORE: PON- AFTER: H. State of the City event — In last week's Friday report, staff proposed hosting the State of the City event during the evening of Thursday, November 9 after receiving feedback from the Committee on Citizen Engagement to move the event to the fall to coincide with the start of the City's fiscal year and to have more distance from the May election timeframe. Unfortunately, there are a couple conflicts for November 9 and there is very limited availability for a November date based upon other events, meetings, and the Civic Center. December is not recommended due to the holidays. Staff will look for a January date and believes can still meet the feedback and request. Staff contact: Sarah Kuechler L Department Sponsorships — Following Denton Municipal Electric's recent presentation to the City Council regarding department sponsorships, Solid Waste staff identified similar sponsorship expenses within the department's budget. Among those sponsorships, staff found that the department will be sponsoring the upcoming October I st Twilight Tunes event at the Courthouse on the Square. Staff is unaware of any additional commitments, and prior to any further sponsorships being approved,the department will seek direction from the Public Utilities Board and the City Council. Presentations to the Board and Council are currently planned for October. Staff contact: Ethan Cox J. Open Meetings Act Question Regarding Section 3.B. of the Council's Regular Meeting Agenda — There have been questions raised by several citizens as to whether the Texas Open Meetings Act ("TOMA") allows Council to deliberate and take action on "Section 3.B." Public Comments on the Council's Regular Meeting Agenda. As you know, Section 3.B. states, "Receive scheduled citizen reports from member of the public," followed by the name of the citizen and a brief description of the subject matter. This type of agenda item posting significantly differs from the rest of the Regular Meeting agenda item postings where Council deliberates and takes action. The latter type of postings, commonly referred to as "action items", consistently use the word"consider" in connection with"adoption or approval"of a certain item. Also,the action items include Staff reports, ordinances and other documents germane to the item. This has been the City's custom for many years in providing notice to the public, as required by the TOMA, of items that will be considered for deliberation and action. This custom establishes an expectation by the public about the subject to be acted upon at the meeting. Straying away from this custom exposes the Council to a potential TOMA violation. In one case, the San Antonio Court of Appeals concluded that the San Antonio ISD Board of Trustees violated TOMA when it deliberated upon an item that was only noticed as "Discussion" rather than the usual and customary "Discussion and Action" language that it routinely used for its regular meeting agenda action items. The school's district's posting was not sufficient to alert the general public that action would be taken. In the City's case,deliberating and taking action on Section 3.B. Public Comment items would be identical to what occurred in the San Antonio ISD Board of Trustees case,because the Council would be departing from its customary practice of alerting the general public that deliberation and action may take place. This risk is further increased because of the customary practice of including agenda back up materials for each action item, and as the Council has observed on occasion, some speakers have strayed from the posted Section 3.B. Public Comment captions. Staff contact: Aaron Leal K. PARD Project Update — Please see attached the monthly Parks and Recreation project update. Staff contact: Emerson Vorel III. Attachments A. Renewable Energy Information B. Letter to Mr. Donnelly C. 2017 Neighborhood Empowerment Summit D. Parks and Recreation Project Update IV. Informal Staff Reports A. Downtown Square Public Restrooms V. Council Information A. Council Requests for Information B. Draft Agenda (No agenda for this week) C. Council Calendar D. Future Council Items E. Street Construction Report ercot Your Power. Our Promise. Q U I C k Facts 7 p of load is competitive- 5 /p choice customers— What we • • more than 7 million electric-service IDs restructuredThe Texas Legislature 0 (premises) the Texas electric market in 1999 by unbundling investor-owned utilities • _ percent of those '• • • Texas Load primary responsibilities: reliability•System — planning p • production•Wholesale lement for electricity and delivery 71 , 110 MW switching• process . Record peak demand 78,000+ Retailcustomerchoice (Aug. 11, 2016) megawatts (MW) of 24 •Open 66,921 MW Weekend expected capacity million consumers demand record (August 7, 2016) for peak in the ERCOT region megawatt of electricity can power about 200 Texas In 2016, $2 billion in transmission development added homes during periods of to the ERCOT region. peak demand. 1,266 circuit miles of transmission planned with 46,500+ $5.6 billion under development over the next five years. t 70+ circuit miles of high- 1,448 circuit miles of transmission improvements nerating units voltage transmission completed by market participants in 2016. >19,000 MW of installed wind 950 MW of utility-scale capacity, the most of any state in installed solar capacity as the nation. of August 2017 Wind Generation record: Solar capacity in queue: 16,141 MW (March 31, 2017) 2017: 209 MW Wind Penetration record: 2018: 841 MW 50 percent (March 23, 2017) Natural Gas Coal Wind Nuclear 101,107,061 ••• ;• 2016 Energy Use Other* 1,699,114 MWh 351 billion kilowatt-hours of energy used in 2016. 1.1 percent more than 2015. 0.5% *Includes solar,hydro,petroleum coke,biomass,landfill gas and DC Ties Natural Gas Coal Wind Nuclear •• •' Other* 2016 Generation Capacity 1% *Includes solar,hydro and biomass ERCOT, Inc. September 2017 active market participants that generate, move, buy, sell or use 1980 0 + wholesale electricity. 111111111111111111111111 Demand response 7million advanced meters resources include: • Load resources M#"'M 9 8.9% • Emergency response service �Q of ERCOT load settled with (commercial and industrial) • Utility load management 15-minute interval data programs The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 24 million Texas customers — representing about 90 percent of the state's electric load. As the independent system operator for the region, ERCOT schedules power on an electric grid that connects more than 46,500 miles of transmission lines and 570+ generation units. It also performs financial settlement for the competitive wholesale bulk- power market and administers retail switching for 7 million premises in competitive choice areas. ERCOT is a membership-based 501(c)(4) nonprofit corporation, governed by a board of directors and subject to oversight by the Public Utility Commission of Texas and the Texas Legislature. Its members include consumers, cooperatives, generators, power marketers, retail electric providers, investor-owned electric utilities, transmission and distribution providers and municipally owned electric utilities. ERCOT Executive Team Jerry Dreyer Theresa Gage Woody Rickerson Senior Vice President& Vice President, Vice President, Bill Magness Chief Information Officer External Affairs&Corporate Grid Planning and Operations President& Communications Steve Daniels Kenan 0 elman Chad Seely Chief Executive Officer Vice President,Application Services g Vice President, General Counsel and pP Vice President, Corporate Secretary Cheryl Mele and IT Operations Commercial Operations Senior Vice President& Betty Day Mike Petterson Diane Williams Vice President, Chief Operating Officer Vice President, Governance, Vice President and Human Resources Risk and Compliance Chief Financial Officer ERCOT Board of Directors Craven Crowell Nick Fehrenbach DeAnn T. Walker Kevin Gresham Chair City of Dallas Chair, Public Utility E.ON Climate&Renewables (Unaffiliated) (Commercial Consumers) Commission of Texas (Independent Generators) (Ex-officio, non-voting) Judy Walsh Randy Jones Vice Chair Calpine Corporation John Werner Sam Harper Chaparral Steel Midlothian LP (Unaffiliated) (Independent Generators) Source Power&Gas LLC (Industrial Consumers) (Independent Retail Electric Tonya Baer Clifton Karnei Providers) Office of Public Utility Counsel Brazos Electric Cooperative Mike Kezar (Residential Consumers, (Cooperatives) Vacant South Texas Electric Cooperative(Cooperative) Ex-officio) Bill Magness (Unaffiliated) Peter Cramton President and Chief Executive Kenneth Mercado (Unaffiliated) Officer, ERCOT(Ex-officio) CenterPoint Energy Inc. Segment Alternates (Investor-Owned Utility) Jack Durland Karl Pfirrmann Valero Services Inc. (Unaffiliated) Rick Bluntzer Jennifer Richie (Industrial Consumers) Just Energy Texas LP City of Waco Carolyn Shellman (Independent Retail Electric (Commercial Consumers) Keith Emery CPS Energy Providers) Tenaska Power Services (Municipal Utilities) Vacant (Independent Power Marketers) Seth Cochran Wade Smith DC Energy Texas LLC (Municipal Utilities) American Electric Power Corporation (Independent Power Marketers) (Investor-Owned Utilities) ERCOT, Inc. September 2017 i— — Texas is a national leader in the wind energy industry. Texas ranks first in the country for both installed and under construction wind capacity, while supporting over 22,000 wind-related jobs. In fact, with over 21 gigawatts (GW) of wind in the state, only five countries have more wind power than Texas. The wind energy industry in Texas has provided over $38 billion in capital investment and has thrived thanks to smart state policy, such as legislation that created Competitive Renewable Energy Zones (CREZ) for wind power transmission. The state is also home to at least 40 manufacturing facilities, including tower manufacturers Broadwind Towers and GRI Renewable Industries. 00 Jobs & Economic rn An investment in wind power is an investment in p jobs, including jobs in operations and maintenance, construction, manufacturing and many support OF sectors. In addition, wind projects produce lease payments for landowners and increase the tax base A of communities. • 2016 direct and indirect jobs supported: 22,001 to 23,000 N • Total capital investment through 2016: $38.4 ti• billion • Annual land lease payments: >$60 million Wind-Related Manufacturing The United States has over 500 manufacturing facilities producing products for the wind industry that range from blade, tower and turbine nacelle assembly facilities to raw component suppliers, including fiberglass and steel. s- Number of active manufacturing facilities in Online Wind Project Manufacturing Facility the state: 40 Note: Calculations based on national and state averages. to Wind Projects • Installed wind capacity: 21,044 MW • State rank for installed wind capacity: 1st • Number of wind turbines: 11,898 • State rank for number of wind turbines: 1 st • Wind projects online: 129 (Projects above 10 MW: 118) • Wind capacity under construction: 5,437 MW Z • Wind capacity in advanced development: 1,646 MW v n Current Wind Generation During 2016, wind energy provided 12.63% of all in-state electricity production. • Equivalent number of homes powered by wind: 5.3 million to Wind Generation Potential The DOE Wind Vision Scenario projects that Texas could produce enough wind energy by 2030 to power the equivalent of 15.4 million average American homes. • Land based technical wind potential at 80 m hub height: 1,418,439 MW • Land based technical wind potential at 110 m hub height: 1,429,747 MW (source: NREQ Environmental Benefits Generating wind power creates no emissions and uses virtually no water. • 2016 annual state water consumption savings*: 20.1 billion gallons • 2016 equivalent number of water bottles saved: 152 billion • 2016 annual state carbon dioxide (CO2) emissions avoided: 38.9 million metric tons • 2016 equivalent cars worth of emissions avoided: 8.3 million *Based on national average water consumption factors for coal and gas plants �\ A011111111111111Lwpm Renewable Portfolio Standard OTexas established a renewable portfolio standard (RPS) in 1999, amending it in 2005. The cur- t_ rent RPS requires 5,880 MW of renewable energy by 2015. The state also has a target of reach- ing 10,000 MW of renewable capacity by 2025, a target that the Texas wind energy industry met in 2010. ' AMERICAN 1501 M St. NW, Suite 1000 1 Washington, DC 20005 1 p. 202.383.2500 1 f. 202.383.2505 WIND ENERGY ASSOCIATION Current ERCOT Wind installations (Capacity) with planned additions ERCOT Wind Additions by Year (as of August 31. 2017) 35.000 MW �umulatrve MV'J lrrstallera ■IA Signed-Financial Security Posted •IA Signed-No Fin an ial Security 30,000 MW 28,715 27.914 "LS 95� 25,000 MW 21.370 20,000 MW ' 17.604 15.764 15,000 MW 12.470 10.407 1 s.a is 0,000 MW 0.400 9.604 , 5,000 MW �'78' 8,005 11,065 2,875 811; 977 1,173 1.385 1,853 - 2019 2020 Notes: -The data presented here is based upon the latest information provided to ERCOT by resource owners and developers and can change without notice. - Installed capacities for the current year account for changes reported by the facility owners during the reporting month,and will be reflected in subsequent years' totals. - Installed capacities include only wind facilities that have registered with ERCOT(Those larger than one megawatt and supply power to the ERCOT system.) -This chart reports annual planned units with projected Commercial Operations Dates throughoutthe calendar year. In contrast, ERCOT's Capacity, Demand and Reserves (CDR)report shows planned capacity projected to be commercially available on or before the start of the Summer and Winter Peak Load seasons. -Financial security posted forfunding interconnection facilities does not include CREZ security deposits,which are refunded to the Interconnecting Entity when an IA is signed. Average ERCOT day — how different renewable types and locations helps meet demand (not actual example) Not to scale and sources shown as a percentage of each resource's total capacity / capability low 70 ob-Wind 909 Wind-Coastal m4o.Wind-Panhandle 60 8091i (Solar -load 70% SO a MA 0 so% is ---o © -0 30 .. 40% o � . � o o 30% 0 20 0 20% - 10 1096 0% - - - 0 1 2 3 4 S 1S 23 24 Hows of the Dray Source of ERCOT generation by fuel type in total MW's of capacity and renewable only as % of total ERCOT capacity Type 1/1/2000 1/1/2001 1/1/2002 1/1/2003 1/1/2004 1/1/2005 1/1/2006 1/1/2007 1/1/2008 1/1/2009 1/1/2010 1/1/2011 1/1/2012 1/1/2013 1/1/2014 1/1/2015 1/1/2016 1/1/2017 1/1/2018 SOLAR% 0.00% 0.00% 0.0D% O.OD% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.08% 0.13% 0.18% 0.27% 0.65% 1.49% WIND% 0.30% 0.28% 1.65% 1.67% 1.92% 2.22% 2.55% 3.89% 6.33% 9.73% 9.98% 9.85% 10.08% 10.82% 10.86% 10.60% 12.10% 12.27% 13.95% WIND-C% O.OD% O.OD% O.OD% O.OD% O.OD% O.OD% 0.00% 0.00% O.OD% O.OD% 0.63% 1.21% 1.31% 1.55% 2.01% 1.87% 1.79% 2.07% 2.44% WIND-P% O.OD% 0.00% O.OD% O.OD% O.OD% O.OD% 0.00% O.OD% 0.09% 0.29% 0.27% 0.26% 0.25% 0.25% 0.25% 1.42% 2.82% 3.47% 6.23% Total Wind% 0.30% 0.28% 1.65% 1.67% 1.92% 2.22% 2.55% 3.89% 6.42% 10.03% 10.98% 11.31% 11.65% 12.62% 13.12% 13.89% 16.70% 17.81% 22.61% Type 1/1/2000 1/1/2001 1/1/2002 1/1/2003 1/1/2004 1/1/2005 1/1/2006 1/1/2007 1/1/2008 1/1/2009 1/1/2010 1/1/2011 1/1/2012 1/1/2013 1/1/2014 1/1/2015 1/1/2016 1/1/2017 1/1/2018 COAL 15,097 15,097 15,D97 15,097 15,097 15,097 15,097 15,955 15,955 15,955 16,795 18,395 18,395 18,395 19,365 19,965 19,965 19,965 19,965 GAS 15,137 15,137 17,345 18,069 18,097 18,374 18,374 18,374 18,374 18,565 18,914 19,220 19,512 19,716 19,077 19,077 19,647 20,669 21,400 GAS-CC 3,596 6,073 9,862 17,935 20,627 21,948 21,948 22,598 23,286 24,572 25,754 26,409 27,049 27,049 27,049 31,035 31,807 32,894 36,044 NUCLEAR 2,704 2,704 2,704 2,704 2,704 2,704 2,704 2,704 2,704 2,704 5,164 5,164 5,164 5,164 5,164 5,164 5,164 5,164 5,164 SOLAR - - - - - - - - - - - - - 1,655 WIND ,143 1,362 1,569 2,489 4,206 6,981 7,668 7,988 8,213 8,960 9,095 9,523 11,450 12,130 1-5,528 WIND-C - - - - - - - - - - 483 967 1,068 1,280 1,682 1,692 1,682 2,049 2,712 WIND-P - - - - - - - - 207 207 1,277 2,671 3,429 6,935 OTHER 1 1,804 1,804 1,804 1,819 1,819 1,819 1,819 1,819 1,819 1,819 1,819 1,864 1,864 1,969 1,969 1,969 1,969 1,924 1,924 Natural Gas Coal I • Nuclear .-. 2016 Ener Use other >�y 1.699,114 MWh 351 billion kilowatt-hours of energy used in 2016. 1. 1 percent more than 2015. 0.5% *Includes solar, hydro, petroleum coke, biomass, landfill gas and DC Ties Natural Gas Coa I Wind Nuclear • dL Other' 2016 Generation Capacity lei I.— i l— 1-iydro and biomass Points of Note 19,000mw - ERCOT total installed wind capacity (Jul 2017) 14% - of West/Panhandle wind capacity used by ERCOT in summer planning (Capacity Demand Reserves — CDR Report) 58% - of Coastal wind capacity used by ERCOT in summer planning (CDR) 900mw— Current ERCOT solar capacity (additional 800 planned in 2018) 79,000mw - ERCOT Total Available Capacity all generation sources for Summer Peak (2017) 74,150mw - ERCOT Forecasted Expected Summer Peak demand/load (Hour 4:30-5:30pm on highest demand day) 5,850mw— ERCOT forecasted excess summer capacity margin — contingency capacity @ 7.8% is below ERCOT planning 2,500mw — Current largest power plant in ERCOT (at a minimum ERCOT needs every hour 2x largest power source as back up) 50% - at 4:00am 23rd March 2017 Wind output was meeting 50% of total ERCOT demand 16,141 mw — Current record production from wind in ERCOT on 3 1" March 2017 (in the midnight to 4:00am hour) Denton's Journey to Renewable Enemy • 2009 — Denton City Council chose an ambitious plan to take the City and its customers to 40% renewable energy • 2009 — Denton incorporated a small (1.5mw) landfill gas generator into its portfolio at its own landfill site • May-2009 — Denton awarded a contract to commence with Renewable Energy Credits, leading to physical energy deliveries upon completion of a new development project — In Muenster, Tx, near to Denton • July-2011 — Denton began receiving all the contracted quantity of energy from the Muenster farm (30mw) `Wolf Ridge' • 2013-2015 Denton began formation of a plan and strategy to increase renewable energy supply to the City and its customers • June-2015 — Denton awarded a contract for solar energy (30mw) from Bluebell, SW of Abilene, Tx • November 2016 - Denton signed PPA to receive offtake from Santa Rita wind farm (150mw capacity), SW of San Angelo, Tx. • Late 2018- January 2019 - Santa Rita increases Denton's physical renewable percentage to more than 60% • Q4-2017 — Denton is seeking further renewable supply from an existing RFP to bring the renewable % to 70% or more by 2019 Considerations in Renewable Supply • Texas wind for the most part, delivers a significant portion of output at night, when demand is at its lowest • Solar energy is produced when needs are often greatest, but has been more expensive than wind —prices are closer today • Texas wind does not produce equally — different locations have quite different expected output profiles • Solar energy also generates at times of low demand, such as Spring and Fall, producing excess supply • Panhandle wind is often the cheapest but has most congestion (delivery cost) risk and often least desirable output profile • Costal wind is the most consistent but is the most expensive and also has unpredictable congestion risks • Denton continues to evaluate the impact of a rapidly changing and uncontrollable, yet low cost supply, to its rates • Buying cheaper renewables can be offset by the cost of selling excess supply and buying deficit needs — it requires close eyes • Over buying supply that will not be needed carries risks of uncertainty as to what it can be sold for, as excess to needs • There will be times when renewable energy is insufficient to meet demand, traditional sources will be needed • New and future technologies are not developed to deploy competitively or operationally yet, but we are monitoring • Denton is mindful that the reliability over the long term of affordable electric rates is a critical objective Denton's current Green Sense program enrollment and current locally installed non-utility solar systems 1. Residential— 173 2. City of Denton—74 3. Solar installs (Residential and Commercial) - est end 2017— 131 Denton's Current Portfolio Mix This shows that only a relatively small amount of additional supply (25mw) is needed to reach the 70% threshold. Column "Maximum MWhs" is the quantity which would be available if maximum energy was produced every hour — this is not possible with renewable supply. Column "% Capacity" is the projected expected % of quantity Denton is forecast to receive (the capacity factor). Column "Actual Estimated MWhs" is the quantity Denton can realistically expect to receive on average, over a year. Denton has flexibility of different start and end dates for each project/PPA already and to be procured. Actual Annual Maximum Estimated ProjectlPPA MW Hours MWhs % Capacity MWhs Wolf Ridge 30 8,760 262,800 100:10 262,800 Bluebell 3 0 8,760 262,800 36% 94,608 Denton Power 1.5 8,760 13,140 90% 11,826 Santa Rita (Invenergy) 150 8,760 1,314,000 48% 630,720 Solar (Unpurchased) 25 8,760 219,000 36% 78,840 Wholesale Green 0 8,760 - 100% - Wholesale Mkt Avg 0 8,760 - 16.50% - Total MWhs Supply 1,078,794 Total MWIis billed 1,525,000 Renewable 70.7`,>0 I[) Solid Waste & Recycling )F DENTON 1525 S. Mayhill Rd., Denton, TX 76208 • (940) 349-8700 Sept. 28, 2017 Robert Donnelly 3900 Quailcreek Rd. Denton, TX 76208-6108 Dear Mr. Donnelly: This letter is in response to concerns you raised during the Citizen Comments portion of the August 15, 2017 and September 19, 2017 City Council meetings. Based on a review of your comments, I understand your concern to be that the Solid Waste Department is not in compliance with the Specific Use Permit (SUP) which governs the operation's land use. During your presentations, you cited the lack of a landscape buffer and landfill height as issues of concern. In addition to the SUP, the mediated settlement agreement(MSA), to which you are a party, also identifies several points of agreement to which the City agreed to comply. From my meetings with you on May 10, 2017 and June 21, 2017, I recall you identifying the removal of a right hand turn lane on Mayhill Road as non-compliant with the MSA. The purpose of this letter is to identify the passages from the SUP and MSA related to your concerns and, where appropriate, detail the City's plans for addressing your concerns. Vegetative Buffer The vegetative buffer along Mayhill Road and Edwards Road is specified in the following documents: • Staff Report to Planning & Zoning Commission re: S-204 (January 25, 1995) - States that the buffer yard along Edwards Road will be "100 feet wide with 7 canopy and 13 understory trees per 100 linear feet" and the buffer yard along Mayhill Road will be "115 feet wide with 7 canopy and 13 understory trees per 100 linear feet." • Specific Use Permit S-204 (March 21, 1995) - Requires "sufficient landscaping and screening to ensure harmony and compatibility with adjacent property." • Mediated Settlement Agreement (September 12, 1997) — States that the City"shall landscape the `buffer zone' area along Mayhill road and at least 1/4 mile down Foster Road in accordance with the Special Use Permit for the landfill. For every 100 linear feet of frontage along Mayhill Road and Edwards Road, Applicant agrees to provide at least OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989 Solid Waste & Recycling DENTON 1525 S. Mayhill Rd., Denton, TX 76208 • (940) 349-8700 seven canopy and thirteen understory trees." The MSA further states that"trees will not be planted in drainage areas" and"plant locations shall be approved by a licensed Landscape Architect"prior to planting. It is my understanding that the City installed an appropriate vegetative buffer following approval of Permit No. MSW 1590-A; however,portions of the vegetation died in the years that followed. According to a recent inspection by the City's Building Inspections division, there is adequate landscaping close to the mobile home park, including new plantings. However, as you move north the landscaping ends and there are large gaps of no trees. As discussed during our meeting on June 21, 2017, the City intends to reinstall a vegetative buffer that complies with S-204 and, to the extent practical, the MSA. However, we must first address constraints presented by existing utility infrastructure, a future DME transmission project and associated easements, and the widening of Mayhill Road. To that end, the City is in the process of requesting an assessment by a landscape architect that will recommend the species, location, and maintenance required for the planting to be successful. The process for selecting a landscape architect should be concluded in the next few weeks. Once the assessment is complete, the City will implement the recommended tree planting and maintenance program. Landfill Height Landfill height is specified in the following documents: • Staff Report to Planning & Zoning Commission re: S-204 (January 25, 1995)— States that the "maximum height of the landfill shall not exceed 95 feet above the elevation at Mayhill Road." • Mediated Settlement Agreement (September 12, 1997) — States that the landfill may be constructed"to a height of approximately 680 feet MSL." The terms of the MSA require that the City not exceed this height until either 2027 or"upon the transfer or sale of 50% or more of the acreage and/or interest in each protestants current properties to any other person or entity other than a protestants son, daughter or spouse whichever comes first." • Amendment to Permit No. MSW 1590-A(August 10, 1999)—Following the execution of the MSA, the permit was amended to "lower the permitted landfill final height from 704 feet mean sea level (MSL), to 680 ft. MSL, a change resulting from a mediated settlement agreement." The highest existing point of the landfill is 653 feet above MSL which is approximately 53 feet above Mayhill Road. At this height the City is in compliance with S-204, the MSA, and Permit OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989 �I '` Solid Waste & Recycling IM DENTON 1525 S. Mayhill Rd., Denton, TX 76208 • (940) 349-8700 No. MSW 1590-A. The City is in the process of seeking a permit amendment (Permit No. 1590B)which would allow a final height of 813.5 feet above MSL (213.5 feet above Mayhill Road). However, it must be noted that the MSA expires in 2027, and the permit amendment limits maximum height to 675 feet above MSL until 2028. If the City wishes to exceed 675 feet above MSL after 2028, the Solid Waste Department will be required to amend or replace the existing SUP which limits the height above Mayhill Road to 95 feet. Right Hand Turn Lane The right hand turn lane at the intersection of Spencer Road and Mayhill Road is referenced in the below document: • Mediated Settlement Agreement (September 12, 1997) — States that the City will "begin construction of a right hand turn lane from the intersection of Mayhill Road and Spencer to the intersection of Mayhill and the Waste Water Treatment Plan." Based on satellite images, the right hand turn lane was constructed in the prescribed location prior to 2001. In 2005, the landfill entrance was moved north by several hundred feet and equipped with a stop light. Rather than installing a right hand turn lane, the City created a left hand turn lane. We recognize that the present lane construction is not consistent with the language present in the MSA. However, with the impending realignment of Mayhill Road, we believe the need for a right hand turn lane will be eliminated, and we do not feel the construction of such a lane would be in the best interest of the City of Denton or our citizens. Please feel free to contact me if you have additional questions or concerns. Sincerely, Ethan Cox Director of Solid Waste (940) 349-7421 Ethan.cox(a,cityofdenton.corn OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989 ILI& 2017 Neighborhood Empowerment Summit The summit is a FREE event and open to the public. Light breakfast, lunch and door prizes are included. In order to make appropriate accommodations, please register at www.citvofdenton.com/neighborhoodplanning or call us at (940) 349-8328 by October 11 . } 16I��i.1Y M+ Ill P With Door Prizes Breakfast I Lunch d Join us as we learn about the following! OCTOBER Building Smarter, Cleaner and Greener Neighborhoods -" Together L Past Neighborhood 9 a.m-1 p.m. Matching Grant Projects MILK, Jr. Recreation Center 1300 Wilson St Neighborhood Project Denton, TX 76205 Matching Grant Workshop CITY For questions, contact Ron Menguita at (940) 349-8328 OF or Ron.Menguita@cityofdenton.com Neigh Healthy DENTON borhoods Clt'I OF LIFMON NEIGHBORHOOD PUNNING PROGRAM Parks and Recreation Major Projects In Progress Project Location Budget Projected Completion Date Status Managed by Facilities Management Concession Stand at Water Works Park Water Works Park $ 2,677,512 October 2017 Concession stand will open to the public for the 2018 season. Construction started 8/1/17. Hurricane Harvey stalled progress at the factory. 9/18 Spray Ground Carl Young Park $ 200,000 October 2017 construction resumed.New estimated completion date 10 28 17 Developing estimates and determining funding.Presented at Work session on September 12,2017.Per Council direction,staff is exploring the sale of property to help fund this Vela Soccer Complex North Lakes $ 3,120,560 October 2018 project. Facilities and Parks met with TNP.TNP has finalized drawings and Purchasing is sending Oakwood&IOOF Cemetery Fence Oakwood&IOOF $ 508,714 October 2018 out RFP in October 2017. Design complete. Construction will bid after CDBG waiting period. Carl Young Restroom Carl Young $ 59,718 August 2018 Project is 90%complete. Need to place the signal at Hwy 77 and Nicosia and a few Evers Trail TXDOT Grant Evers Elementary to North Lakes $ 1,814,434 November 2017 connectors near that intersection. Contract signed by vendor for$74,559.Medallions are fabricated.Awaiting completion of 135 Art Medallions at North Texas Blvd I-35&N.TX Blvd $ 200,000 October 2017 North Texas Blvd Bridge for installation. Managed by Parks Contract approved by City Manager. Installation begins Fall 2017.(North Lakes and Sr. Center Marquees All rec centers and Civic Center $ 95,000 November 2017 Center will be first). Cattails mowed.Dredging failed-shore will not support a large machine.Exploring other Lake Forest Maintenance Lake Forest TBD options. Fred Moore Athletic Fields Fred Moore Park $ 52,317 September 2017 The project is 97%complete,only lacks shade structure.Field is ready for play. Lake Forest Dam Study Lake Forest $ 80,000 August 2018 Contract signed;PO issued with TNP. Design complete.Real Estate is working with the Wind River HOA to purchase an Loon Lake Trail Connection Wind River $ 63,352 TBD easement. Art purchase approved by Council 06/20/17.Art delivered 06/30/17. Installation Fall Surls Art Civic Center $ 105,000 November 2017 2017. Cemetery Headstone Audit and Repair-Phase 2 Oakwood&IOOF $104,423 Aril 2018 Phase II contract will go to Council in November 2017 Fred Moore Parking Lot Fred Moore Park TBD Bryan and Emerson will meet with Pastor Harden at St.Andrews Church in October Sequoia Trail Sequoia Park $ 65,000 Sept 2018 Staff is preparing a contract to design this trail. Industrial Street Pocket Park Industrial Street $13,000 TBD Staff is working to indentify additional funding for design and development. Parks Certified Playground Inspectors prioritized replacement list from 2014 Bond Sale These three playgrounds will be bundled and bid together.CIP funds available spring 2014 Bond Playground Re lacements Denia $130,000 October 2018 2018. 2014 Bond Playground Replacements Fred Moore $150,000 October 2018 2014 Bond Playground Replacements Milam $140,000 October 2018 Park Foundation is exploring raising funds to help create the City's first inclusive 2014 Bond Playground Replacements McKenna $150,000 November 2018 playground. CIP funds available spring 2018 2014 Bond Playground Replacements Carl Youn $150,000 October 2019 CIP funds available spring 2019 2014 Bond Playground Replacements Nette Schultz $110,000 October 2020 CIP funds available spring 2020 Parks and Recreation Major Projects In Progress Project Location Budget Projected Completion Date Status Recently Completed Wave Pool Waterworks Park $ 2,677,512 May 2017 The Wave Pool o ened on Jul 8,2017. The budget was 18,000. Received 7,626 from Park Foundation. Project under budget Accessible Swing Installation Ernest Dallas Park $ 18,000 May 2017 $7,626. The budget was$40,000. Project completed for$40,000. Amenity rebuild and rearrangement Skate Park $ 40,000 June 2017 Playground Replacement Londonderry $ 113,398 June 2017 The budget was$113,398.Project completed for$89,000.Under budget by$24,398. Shade Structure Installation Golf Driving Range $ 50,207 June 2017 The budget was$50,207.Project completed for$42,538.Under budget b $7,669. Avondale Sidewalk Avondale $ 74,787 Aug2017 The budget was$74,787. Project completed for$74,787. Cemetery Headstone Audit and Repair-Phase 1 Oakwood&IOOF $ 49,000 September 2017 67 monuments repaired. Resurface Avondale Basketball Court Avondale $ 5,000 Sept 2017 Complete 9/11 Firefighters Art Fire Central $ 325,000 Sept 2017 Complete and dedicated on 9/11/17 Date: September 29, 2017 Report No. 2017-071 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Overview of Downtown Square Public Restrooms BACKGROUND: At the August 3, 2017 Council meeting, Council Member Hudspeth requested information about public restrooms for the Downtown Square, the ability to use a non-police security force on the Square, and working with Denton County on the possibility for extended restroom hours. DISCUSSION: Staff has identified that access to public restrooms are available around the Square for the hours listed below: Days Hours Monday- Thursday 8 am—9 m Friday 8 am—9:30 pm Saturday 10 am—9:30 pm Sunday 12 pm—7 pm The restrooms are available from three public facilities within one block of the square: the Discover Denton Welcome Center, the Denton County Courthouse, and the City of Denton Development Services Center. Attachment 1 lists the hours of operation for each facility. Restrooms are most utilized at the Welcome Center with an estimated average of 1,054 visits per month equating to an estimated cost of $356/month for restroom and cleaning supplies. The Welcome Center differentiates and counts the number of visits by guests (people that come in to use restrooms and amenities) separately from visitors (people that come in to shop or find out information about Denton). Denton County estimates there are 400 visits per month for individuals using the restrooms in the Courthouse and Development Services has only a couple visitors per month for restrooms. The Welcome Center and Denton County shared similar issues relating to individuals coming to use the restrooms, such as grooming in the facilities, the excessive use of toiletries, and increased cleaning and maintenance. The Welcome Center has contracted with a janitorial company to clean their facilities three times per week and their staff cleans multiple times per day. Staff has attempted to identify four options to address the availability of restrooms on the Square. Please note that some of these options would need to be thoroughly vetted, but the intent is to provide some context on the range of options that could be further explored. • Option 1 could be to increase education about the available public restrooms by adding signage to the kiosks on the corners of the square identifying which facilities have public restrooms as well as including these facilities on the downtown parking map. Because Date: September 29, 2017 Report No. 2017-071 this option is a modification to services that are already being provided, there are no additional costs. • Option 2 could be to extend the hours of the Welcome Center to allow increased restroom availability. The Welcome Center previously had operating hours that extended beyond current hours, but chose to reduce operating hours based on security issues in October 2016. The Welcome Center is open to the idea of extending hours, but consideration should be given to the safety of staff and additional funding required. The Convention and Visitors Bureau estimates that their cost would be $30 per hour for every additional hour of operation. Depending on the time of the change in operating hours, there may be additional costs, such as a security guard or additional personnel. The Welcome Center has been staffing two employees at all times and has used a security guard in the past during high traffic events like the tree lighting. • Option 3 could be the addition of mobile restrooms to the downtown square. This is being done as a pilot program in a few other cities, such as Denver, Sacramento, and Austin, to assess the need and location of permanent facilities. Restroom trailers are parked in various locations throughout the cities and serve as public restrooms for those areas. The restrooms are ADA compliant and self-contained, meaning they carry water onboard and use a generator for power. Denver has a webpage devoted to the project and can be viewed here. Austin is just beginning their pilot program and have identified three locations near the downtown where they will begin implementation. These cities have chosen to staff an attendant fulltime at the locations to provide security, maintain the restrooms, and survey users. Denver is currently leasing these trailers at a cost of $2,700 per month and Austin has chosen to purchase trailers so they can be used other city needs once permanent restrooms are installed. The estimated cost for staffing an attendant would be $4,000 per month and based on Denver's experience, operation and maintenance costs would be approximately $5,500 per month due to cleaning, offloading waste daily, and use of a generator for electricity and running water. The total cost of the project would be approximately $12,200 per month. Things to consider with this option would be the safety of users and attendants, the need to transport the trailer to replenish water and remove waste, the location on the Square, and the effect to local businesses and residents. • Option 4 could be to install a public restroom on the square. Attachment 1 depicts a "Portland Loo" single stall restroom that some municipalities have chosen to install, such as Portland and San Antonio. This restroom has a design to allow high visibility to decrease crime, outside handwashing station to prevent loitering, and is ADA compliant. The approximate cost with installation for a restroom like this would be between $120,000 and $150,000. The approximate maintenance cost would be $10,500 annually based on the costs of other City restrooms. Things to consider with this option would be the location and possible coordination with the County, the impact to surrounding businesses and residents, and the security issues that installation of a 24 hour public restroom would present. The City of San Diego removed the restroom they installed 13 Date: September 29, 2017 Report No. 2017-071 months prior because of a 130% increase in police calls to the area around the restroom (Sandie gouniontribune.com). The City of Denton Police Department currently staffs officers for the downtown district with between two and six officers on duty at any given time. The downtown patrol radius is from Bell Ave. to Fry St. and Congress St. to Eagle Dr. with a specific emphasis on the Downtown Square. The crime in the area is not significantly higher than other areas of the city. There have been complaints from merchants and residents on the Square about individuals relieving themselves in breezeways. In the past two years, the Police Department has received seven calls for public urination downtown and issued 11 citations. Staff also received a question regarding medical needs and EMS volume in the downtown area related to homeless individuals. The Fire Department recently began tracking EMS calls related to homeless individuals in September 2017. The tracking system is monitoring location, gender, and a description of the incident with EMS tracking number for those calls. This will provide more data to address the type and volume of EMS calls related to homeless individuals across the city and in specific areas, such as the downtown area. Please also note that Denton County has extended hours in which the basement entrance (that allows access to the downstairs restroom on the north side of the building) remains open, but this is only done for special events like the Twilight Tunes. There is a stairwell in the basement that connects to the main building (which is roped off for these events) and would not be feasible to remain open on a regular basis outside of business hours. ATTACHMENT(S): 1. Public Restroom Research and Options STAFF CONTACT: Charlie Rosendahl Management Analyst Charles.Ro sendahl(a)cityofdenton.com 940-349-8433 Sarah Kuechler Assistant to the City Manager Sarah.Kuchlergcityofdenton.com 940-349-8356 - 9/29/2017 Downtown Public Restrooms September 29, 2017 Available Public Restrooms Hours of Operation W ONL NOw lI WOw® NONq O !ar Welcome Center Courthouse Q � Mon.-Thu. 10 a.m.-9 p.m. Mon.-Fri. 8AM—SPM p Fri.-Sat. 10 a.m.-9:30 p.m. Sat. 13AM-3PM Sun. 12 p.m.-7 p.m. Sun. Closed Development Services Mon.—Fri. 8AM-5PM Sat:Sun. Closed psz Hours Unavailable • FW Sun. 7p.m.-8 a.m. ©Y & 0 Mon.-Thu. 9 p.m.—8 a.m. Fri. 9:30 p.m.—10 a.m. ej I Sat. 9:30 p.m.—12 p.m. 1 9/29/2017 Current Restroom Usage Welcome Center • 1054 visits per month Courthouse • 400 visits per month Development Services • 2-3 visits per month Possible Options to Increase Restroom Availability 1. Increased Education 2. Extend Current Hours 3. Mobile Public Restroom 4. Install Public Restroom 2 9/29/2017 DENTON MAIN STREET ASSOCIATION MEMBER BUSINESSES Increase Education Option 00*00) �rr1`►T11 Hickory Sheet • Add public restrooms to the Kam _'_SCK1 103W H�� downtown kiosks. Ata C—dy 105W HmAcry qp Impiessk.Is 10,,'"W Hlck.n 17►G • Add public restrooms to the The ChesaIDt Trve Tea Hoose B FAsbo 107W Hickory (f) Neel—C—try[airtarrw-(M-Tn.3-47r1Flrn tlucxr�un HOW H k.,V 1'l downtown parking map on the r3ii M 1—a,,Wnitomo Cmirte(public ReoronmS) I I W.Hickory 10 website. to Star AvinkJe Fkuge Co 113W Hxkory Lioth klawo (Nd I a:hionod Ito Cream 6 Soda I ovnlam 117 W Hkknry (r� • There would be no cost to I cmfMnW......nW.rn A AW H__ 119W Hickory Roo"implement this change. 14nrth toi 2UT W Hickory SIa.101 IYZy N[mnwc�Aom Alldu.1 207 W HlCkpy 510 I111 vt Sw.ra Inwiorrw Avc wN Corp. 207 W thaory.Slo.207 ^_ • Leave the current public restroom J.—Iq. ,F_ 207WHenry,tiW213 rti situation unchanged. Kr Wr,,Mr..A11—Y 207 W.thclM Sle 214 0, I",1'rtnma 2W..W Hltkory.tits lili * The unavailable hours would remain: Damon Cam—ft TA.V1 214W thaorY rkf Sun. 7p.m.-8 a.m. Wlomsylkids 221 W Hickory ITSI Mon.-Thu. 9 p.m.—8 a.m. Miy.N.J~ty 222W Hickory Ste loI 1►4 Fri. 9:30 p.m.—10 a.m. hymn .U-4 235W Hickory (;) Sat. 9:30 p.m.—12 p.m. lmpiey.p 321 W Ihckary.Ste 10.1 C'I H..Stick 321 W Hk:kory,Sla.1U (64) k&hvaY ktan 406 W.Hickory 10 Lux Star Iops d Caps 505 W.Hickory Ipy Univ ay of North T.— 1155 U—,Qlale r�1 Welcome Center Extended Hours Options • Extend the hours of the Welcome Center to allow for more public restroom availability CHART COm Darin¢Daily Ave Visitors vs Gucs! • $30 per additional hour open •:5000 +50 W 00 00 Considerations .5000 00 00 • Safety 15000 • 2 staff members present '0000 woo In Im is in in In In • Funding options MaadeY Tu de,, We6Ysa/y Trkk fa•! fway 5M.'aay 5arklay ■V,%tWDa1VAy Age ■Guca Daly Ayer;e 3 9/29/2017 Mobile Public Restroom Option Leased Restrooms • Trailer($2,700/mo) �� • Attendant($4,000/mo) • 0&M($5,500/mo) - Why an attendant? r J • Provide security �Y • Maintains the restroom 1 I; • Surveys users to gather feedback Who's doing it? • Denver,Austin,Sacramento Why? • Allows them to assess need and location prior to making larger capital investment. Considerations • Safety • Self-contained-need to replenish water and empty waste • Located in parking space • Impact to residents and businesses Install Public Restroom Option Cost ` ! 1 I1m. • Equipment and Installation • Est.$120,000-$150,000 _ i • Maintenance I • Est.$10,500 annually • 50 Year Lifecycle Recommended Features 'ti• z _ • Hand washing externally • Visible design to decrease crime • ADA compliant Considerations • Safety • Impact to residents and businesses • Location-City vs.County Owned 4 9/29/2017 Options 1. Increased Education 2. Extend Current Hours 3. Mobile Public Restroom 4. Install Public Restroom Next Steps 1. Receive Direction 2. Identify Stakeholders 3. Implement Direction/Develop Recommendation 4. Council Report 5 Revision Date 9/29/17 Council Re uests for Information Request Request Date Staff Responsible Status 1. Report on the background and level of service for gas 3/21/17 Kuechler A work session is scheduled for Oct. well inspections/work session on gas well setbacks 17. 2. Work session to 1)review Comp Plan for Economic 5/30/17 Booth A work session is scheduled for Oct. Development and 2 incentive policy discussion 17. 3. Information on cost determination for curb rate vs drop- 6/5/17 Cox Staff is working on a staffing and off rate at landfill operational analysis first before conducting a revised cost of service stud . 4. Update on stack of railroad ties—are they being picked 6/5/17 Nelson Ties removed from area along Mingo up? Rd near Service Center. Crews are working on downtown area. 5. Discussion of development code criteria for width of 6/6/17 Canizares Water and WW criteria is in process of streets being updated. Street design criteria is next. 6. Work session on planning & development studies 6/20/17 Mauladad A work session will be scheduled for November or December. 7. Full climate cycle analysis for Denton Energy Center 7/25/17 Banks Provide an update later in the year after Black&Veatch study; potential Q 1 2017/18 project. 8. Survey and report of how other municipalities and 7/25/17 Howell Superintendent Wilson asked that this school districts fund their School Resource Officers, as be a larger discussion including the well as analysis of calls to school and efficiency Natatorium and Impact and Drainage Fees. A work session is expected in early Nov. 9. Work session on parking requirements in the Code 8/1/17 Mauladad Staff is working on a proposed parking amendment for a work session in November or December. 10. Analysis and options for public restrooms on the square 8/3/17 Rosendahl An ISR is in the Friday Sept. 29 report. 11. Info on landfill SUP requirement and a plan to replace 8/15/17 Cox Landscape architect being retained. or minimize trees that will be removed Working with legal counsel on updating SUP. 12. Request to consolidate Council subcommittees and 8/22/17 Walters/Kuechler Staff is working on an interim solution, agendas on the website in one spot as well as a plan to transition more meetings to the Granicus platform. Request Request Date Staff Responsible Status 13. Regular Council updates on DDC progression 9/12/17 Mauladad Updates will be provided in the Friday reports. An update will also be presented during the Dev Services work session on Oct. 24. 14. Options for missing sidewalk segments along 9/12/17 Nelson/Gillum An ISR is expected in the Friday Sept. McKinney(across railroad tracks and correcting the rise 29 report. in the sidewalk), in front of Mack Park, and new DME substation 15. Work session on SB4—how it will impact the 9/12/17 Howell/Leal A work session is scheduled for Oct. community and update on lawsuit. Request for closed 24. session in advance. 16. Work session on funding for downtown reinvestment 9/12/17 Booth A work session is scheduled for Oct. rant 17. 17. Consider an ordinance for building height restrictions 9/12/17 Langley/Booth Staff is currently researching. around the Square 18. Work session on recorded rules &procedures for 9/19/17 Leal Council meetings 19. Work session on process for when a use category is not 9/19/17 Leal/Kuechler clearly defined in the DDC (incl. appeals process and communications to surrounding properties) 2017October Nov • Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 11:00 Council Luncheon 9:00 Council Airport 1:30 Connnrttee on the Committee Environment-Cancelled 5:30 Traffic Safety Conni mission- 4 p.m Public Art Committee Cancelled 6 p.m Park Board 8 9 10 11 12 13 14 9:00 Public U ffities Board 11:301Nbbility Committee 5:30 pm Airport Advisory Board N1 eting 5:30 M Hstoric Landmark 2:00 2nd Tuesday Session Commission 6:30 M Planning&Zoning Commission 15 16 17 18 19 20 21 2:00 CC Work Session 4:00pmlhBSCoN eting 6:30 CC Regular Session 22 23 24 25 26 27 28 9:00 Public Wities Board 2:00 4th Tuesday Session 6:30 PN4-Planning&Zoning Commission 29 30 31 Notes: 4:00 P1V4-Zoning Board of Adjustment AL Created with WinCalendar Calendar Creator More Calendar Templates:2017 Calendar,2018 Calendar Oct • • -r 2017 Tue Wed Fri 1 2 3 4 4 pm Public Art Conniuttee 5 6 7 8 9 10 11 11:30 Council Luncheon 2:00 CC Work Session 5:30 pmAirport Advisory 1:30 Committee on the Board feting Environment 6:30 CC Regular Session 6:30 Ply Planning&Zoning 5:30 Traffic Safety Commission Commission 6 p.m Park Board 12 13 14 15 16 17 18 9:00 Public Wities Board 11:30 Ivbbility Connnittee 4:00pmHaBSCo IV}✓eting 5:30 PNt Ilistoric Landmark 2:00 2nd Tuesday Session Coirnlvssion 19 20 21 22 23 24 25 Thanksgiving Dray C ity Ho lid a y City Holiday 26 27 28 29 30 Na 9:00 Public Utilities Board 6:30 Ply Planning&Zoning 4:00 P14 Zoning Board of 2 pm 4th Tuesday Session Commission Adjustment ibdd More Calendars from WinCalendar.com:2017 Calendar,2018 Calendar,Web Calendar with Holidays Created with WinCalendar Calendar Creator More Calendar Templates:2017 Calendar,2018 Calendar 09/26/17 FUTURE CITY COUNCIL ITEMS Note: This is a working draft of pending Council items and is subject to change without notice. Meeting Date Deadlines Item October 2—Luncheon Captions - September 18 Council Appointee Reviews Backup - September 28 October 3 —No Meeting TML, Houston, TX 10/3-6 1 National Night Out October 10—2nd Tuesday Session Captions— September 25 Council Appointee Reviews Backup—October 6 WS —Housing Tax Credit Application Process October 17—Work/Regular Session Captions - October 2 WS —Water Park Update Backup—October 13 WS —Code Parking Requirements WS —Gas Wells WS —Report from Kim Phillips—Visitor Center in Downtown WS —Downtown TIF discussion WS —Economic Development Update October 24—4th Tuesday Session Captions—October 9 WS —Development Department Update Backup—October 20 WS — SB 4 WS —Atmos/Oncor Coalitions Discussion PH—Voluntary Annexation ICMA, San Antonio, TX 10/22-25 October 31 —No Meeting 5th Tuesday November 6—Luncheon Captions—October 23 Backup—November 2 November 7—Work/Regular Session Captions—October 23 Backup—November 3 November 14—2 nd Tuesday Session Captions—October 30 NLC, Charlotte,NC I I/15-18 Backup—November 10 November 21 —No Meeting Thanksgiving, 11/23-24 November 28—4th Tuesday Session Captions—November 13 Backup—November 21 December 4—Luncheon Captions—November 20 Backup—November 30 December 5 —Work/Regular Session Captions—November 20 Backup—December 1 December 12—2 nd Tuesday Session Captions—November 27 Backup—December 8 December 19—No Meeting December 26—No Meeting I Christmas, 12/24-25 City offices closed 12/25 & 12/26 CA-Consent Agenda IC-Individual Consideration WS-Work Session CM-Closed Meeting PH-Public Hearing Construction Projects Report Starting Oct 02-08, 2017 road closures Barthold Rd at Intersection of 135 Service Rd going West 700'will be closed (Jun 12-Oct 15) lane closures Detour Routes Proposed Date of Proposed Date of Contact Street/Intersection (if applicable) Construction Completion BriefDescriptionofConstruction Department RESIDENTIAL Barcelona rno 7 Sep 25,2017 Oct 27,2017 Concrete Panel Replacement Streets Worthington to Ntsa Bell yes Oct 9,2017 Oct 25,2017 MR Overlay and Curb and Gutter Work Streets US380 to Shemian Bentoaks no Sep 25,2017 Jan 19,2018 Street Reconstruction Streets Oakhurst to Teasley Utility Improvements Bernard no Sep 5,2017 Oct 6,2017 Engineering/D1VlE Maple and Bernard Intersection Bolivar yes Jul 6,2017 Oct 30,2017 Street Reconstruction Streets Sunset to College Cannel no Aug 30,2017 Oct 6,2017 Sewer Nhin Construction Wastewater Hobson to Chiquita Emerson yes Aug 14,2017 Oct 9,2017 Street Reconstruction Streets Nottingham to Hanover Emery yes Oct 9, 2017 Nov 9,2017 sty Construction Engineering Thomas to Bellemead Emery yes Oct 9,2017 Nov 9,2017 tUitY Construction Engineering Stanley to Thomas Golden Sands no Sep 25,2017 Oct 27,2017 Sidewalk and ADARamp Replacement Streets Montecito to Canoe Ridge Huisache/Retarm/Sagebmsh no Sep 5,2017 Oct 13,2017 Water Line Replacement Water Yucca to Yuccca IL Kendolph yes Jul 22,2015 Temporary Closure I 35E Hwy Constr. Intersection work Engineering North Bound Kings Row no Aug 7,2017 Oct 15,2017 Curb and Gutter/Drive Approaches Engineering )AB Right Ln Wellington and Sherinan Lookout no Oct 2,2017 Nov 13,2017 Sidewalk Repair Streets Windsor to Westward NtComuck no Sep 27,2017 Oct 10,2017 MR Overlay Streets I 35 to Wrllowvood Manor Ct no Sep 25,2017 Jan 19,2018 Street Reconstruction Streets Oakhurst to Teasley IV>�rro no Oct 2,2017 Dec 2,2017 Wastewater Mhin Construction Wastewater Bolivar to N Carroll 1Vbckingbird yes Sep 25,2017 Oct 20,2017 Concrete Panel Replacement Streets Stockton to Oakshire 0 Oct 2,2017 Nov 13,2017 Sidewalk Repair Streets Windsor to Westward Oakhurst no Sep 25, 2017 Jan 19, 2018 Street Reconstruction Streets Oakhurst to Teasley Overlook no Oct 2,2017 Nov 13,2017 Sidewalk and Panel Repair Streets IL Windsor to Westward jk Paisley yes Oct 2,2017 Jan 5,2018 Wastewater Nhin Construction Wastewater Frame to Ruddell Southway no 10-02-20107 Nov 13,2017 Sidewalk Repair Streets Windsor to Westward Springtree yes Sep 13,2017 Nov 15,2017 Water and Sewer Line Construction Engineering East XtKmney St to Pecan Grove Dr Wellington no Oct 2,2017 Oct 23,2017 Curb and Gutter Repair Streets Stratford to Heather Westward no Oct 2,2017 Nov 13,2017 Panel Repair Streets Lookout to Southway MAJOR ROADS Barthold yes Jun 12'2017 Oct 15 2017 Street Construction Engineering 135 Svc Rd Intersection to 700'West S. Bonnie Brae no Aug 9,2017 Oct 1,2017 Shoulder Widening Engineering Vintage Blvd to 1500 R N of Vintage Blvd Centre Place no Sep 25,2017 Nov 10,2017 Concrete Street Panel Repairs Streets I 35 Service Rd to Alegre Vista Fulton yes Aug 14,2017 Sep 22,2017 LUity Improvements Engineering Crescent to Emery Hrckoiy yes Aug 23, 2017 Nov 22, 2017 Duct Bank Construction Engineering Bonnie Brae to E of Ave H Hickory yes Sep 8,2017 Nov 22,2017 Duct Bank Construction Engineering Stella to Hrckoiy Hrckary yes Sep 5,2017 Nov 3,2017 Waterline Replacement Water North Texas Blvd to Ave D NB B5 Frontage Rd no Aug 3,2017 Oct 1,2017 Drive Approaches Engineering NofScripture to S ofUS380 Oak no Aug 30,2017 Sep 29,2017 Sevwr Line Replacement Wastewater Oak&Bell Intersection to Dead End Riney yes Sep 29,2017 Jul 29,2018 Road Removal and Replacement Engineering N.Ehnto 1300 West Roselawn St Aug 9,2017 Oct 1,2017 Shoulder Widening Engineering Old Bonnie Brae to Roselawn Cemetery E Sherman Dr Aug 7,2017 Oct 15,2017 Curb and Gutter/Drive Approaches Engineering M di NB Right Ln Stafford and Wellington Note: This provides an Estimate of work to be done the next two weeks. Weather,equipment breakdowns,or other unforeseen problems could cause this schedule to change. Drainage 349-7116 / Water Distribution 349-7181 / Wastewater 349-8489 / Traffic 349-7342 / Streets 349-7160,streets@cityofdenton.com Engineering 349-8910,engineering@cityofdenton.com / TXDOT 387-1414,romulo.bahamon@txdot.gov / Denton County 349-3420 COMPLETED PROJECTS Cordell no Sep 29,2017 UhhtyhWrovements Engine Fulton to Crescent 7 !1 Geesling yes Ju124,2017 Sep 1, 2017 Sewer Line Replacement Wastewater 2836 Geesling to Fishtrap Hickory yes Jun 16,2017 Sep 1,2017 Waterline Replacement Water Ave F to North Texas Highland yes Sep 18,2017 Sep 25,2017 Concrete Valley and Curb Repair Streets IOOF to Carroll Kingfisher Ct yes Aug 1,2017 Oct 9, 2017 Street Reconstruction Streets Kingfisher to Dead End Kingfisher Ln yes Aug 1,2017 Oct 9,2017 Street Reconstruction Streets Oriole to Cardinal Knight yes Ju122,2015 Temporary Closure I 35E Hwy Constr. Intersection work Engineering South Bound E Oak yes Aug 14, 2017 Sep 29,2017 Street Reconstruction Streets Wood to Crawford McCormick no Ju131,2017 Oct 6,2017 SidewalWdriveway/Valley gutter repair Streets Willowwood to 135 Service Rd Ponder yes Aug 21, 2017 Oct 6,2017 Street Reconstruction Streets Broadway to Panhandle Ridgecrest no Aug 30,2017 Sep 29,2017 Street Construction Pennsylvania to Southridge Royal Ln no Aug 15,2017 Oct 15,2017 Sewer Main Construction Wastewater Nfistywood to Rockwood US 380 no Aug 7,2017 Oct 1,2017 Drive Approaches Engineering East ofEctorto Bonnie Brae Victoria Dr yes Aug 1,2017 Sep 29,2017 Street Reconstruction Streets Churchill to Nottingham Welch no Sep 5,2017 Sep 22,2017 Utih'Improvements Engineering Nhple and Welch Intersection