041924 Friday Staff Report
City Manager’s Office
215 E. McKinney St., Denton, TX 76201 (940) 349-8307
OUR CORE VALUES
Inclusion Collaboration Quality Service Strategic Focus Fiscal Responsibility
MEMORANDUM
DATE: April 19, 2024
TO: The Honorable Mayor Hudspeth and Council Members
FROM: Sara Hensley, City Manager
SUBJECT: Friday Staff Report
Upcoming Meetings
A. Public Utilities Board on Monday, Apr. 22, 2024, at 9:00 a.m. in the City Council Work
Session Room.
B. Cancelled - Historic Landmark Commission on Monday, Apr. 22, 2024, at 5:30 p.m. at the Development Service Center.
C. Cancelled - Zoning Board of Adjustment on Monday, Apr. 22, 2024, at 5:30 p.m. at the
Development Service Center.
D. Committee on the Environment on Tuesday, Apr. 23, 2024, at 9:30 a.m. at Pratt Industries.
E. Sustainability Framework Advisory Committee on Tuesday, Apr. 23, 2024, at 9:30 a.m. at Pratt Industries.
F. Mobility Committee on Wednesday, Apr. 24, 2024, at 10:00 a.m. in the City Council Work
Session Room.
G. Civil Service Commission on Wednesday, Apr. 24, 2024, at 1:00 p.m. in the Central Fire Station Emergency Operations Room.
H. Planning and Zoning Commission on Wednesday, Apr. 24, 2024, at 5:00 p.m. in the City Council Work Session Room and Council Chambers.
I. Community Partnership Committee on Friday, Apr. 26, 2024, at 8:00 a.m. in the City
Council Work Session Room.
Please check the City of Denton website for final meeting days and times as information is subject to change after the Friday Report is published. Public Meetings & Agendas | Denton, TX (civicplus.com)
General Information & Status Updates
A. Bell Ave. Closure – Work to install a new waterline in the intersection of Prairie St. and Bell Ave. continues into next week with the detours along Elm St. and Locust St. remaining in place. Staff estimates Bell Ave. will be at least partially reopened by Friday, Apr. 26. A partial opening will allow traffic on Bell Ave. while still allowing for roadway
restoration. Staff contact: Scott Fettig, Capital Projects
B. Department Performance Scorecards – Strategic Services launched the Animal Services' Performance Scorecard, accessible via the City's Strategic Plan Dashboard under "Other Plans and Data.” These scorecards assist departments with service delivery and continuous
improvement efforts. The Animal Services scorecard presents key metrics such as response
to community calls, provision of animal care, and facilitation of placement for animals under the care of Denton Animal Services. Staff contact: Aimée Kaslik, City Manager’s Office
C. Animal Care & Control Appreciation Week – On Apr.
16, Mayor Hudspeth proclaimed the week of Apr. 14-20 as Animal Care and Control Appreciation Week to acknowledge the contributions of Animal Services staff to the community and their commitment to animal
welfare. Staff contact: Monica Benavides, Animal
Services D. Office of Economic Development on Social Media – The Office of Economic Development (OED) is now on social media. Visit their Facebook and LinkedIn pages to
view the latest economic development updates including business news and downtown
events. Staff contact: Brittany Sotelo, Economic Development
E. Road Closures for Fry Street Fair – Portions of Hickory St., Fry St., and Ave. A will be closed in accordance with the attached traffic control plan (TCP) from 4:00 AM on
Saturday, Apr. 27 through 6:00 AM on Monday, Apr. 30 for the Fry Street Fair event.
Staff contact: Autumn Natalie, Parks and Recreation
F. Avondale Park Streambank Restoration – To address damage from erosioin, and to prevent
future damage the City’s Avondale Park Streambank Restoration Project will include the
installation of a stone bank protection wall on the south side of Cooper Creek through
Avondale Park. Construction will begin in May and is planned to be completed in a month.
Staff will host a virtual community meeting on Thursday, Apr. 25, at 6:00 PM to address
questions about the project. To learn more about the project and join the community
meeting visit the project website. Staff contact: Dustin Draper, Capital Projects
2
Responses to Council Member Requests for Information
A. Grant Information Request - On Apr. 17, Council Member Meltzer requested staff contact a Denton County non-profit regarding grant funding opportunities. Staff contacted the non-profit to inform them of opportunities and added them to related communications
distributions. Staff contact: Dani Shaw, Community Services
Upcoming Community Events and Public Meetings
Please visit the City of Denton website for upcoming community events and details.
Attachments
A. Fry Street Fair Traffic Control Plan (TCP) ............................................................................4
Council Information
A. Council Requests for Information .........................................................................................6 B. Public Meetings Calendar .....................................................................................................8 C. Future Work Session Items .................................................................................................12
D. Street Closure Report ..........................................................................................................13
3
M4-9S
M4-9LM4-9R M4-9SM4-9LM4-9RM4-9R
M4-9LM4-9RM4-9SM4-9S
M4-9RM4-9LROADWORKAHEADCW20-1DDETOUR
AHEADCW20-2DROADCLOSEDAHEADCW20-3DROADWORKAHEADCW20-1DROAD
WORK
AHEADCW20-1DROADWORKAHEADCW20-1DROADWORKAHEADCW20-1DDETOUR
AHEADCW20-2DDETOUR
AHEADCW20-2DDETOUR
AHEADCW20-2DROADWORKAHEADCW20-1DROADWORKAHEADCW20-1DROAD
WORK
AHEADCW20-1D
DETOURAHEADCW20-2DROADWORKAHEADCW20-1DROADCLOSEDAHEADCW20-3DROADCLOSED
AHEADCW20-3DROAD
CLOSED
AHEADCW20-3DROADWORK
AHEADCW20-1D
ROAD
CLOSED
AHEADCW20-3DROADCLOSED TYPE III R11-2 / CW1-7ROAD CLOSEDTOTHRU TRAFFICDETOUR
AHEADCW20-2DDETOURAHEADCW20-2DDETOURAHEADCW20-2DONLYONLYM4-9L
M4-9LM4-9R120ft 120ft 120ft
120ft 120ft
120ft 120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft
120ft120ftROADCLOSEDDETOUR TYPE III R11-2 / M4-10RTYPE III R11-2ROADCLOSEDHickory St
Oak St
Mulberry St Mulberry StAve AFry StWelch StAve BJagoe StAvenue CFry StWelch StFulton StHickory St
Scripture St
Avenue CAve B120ft 120ft 120ft
ROADWORKAHEADCW20-1DROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DDETOUR
AHEADCW20-2DType 1 Type 2 Type 3 ADA
Phase 1
Sheet 1
Hamilton Duffy, PC
Consulting
Tex Reg F-5260
90ft
Buffer120ft 245ft
Taper
320ft
Taper
155ft
Buffer240ft
400ft
350ft
Buffer
720ft
Taper
780ft
Taper
Arrow
Board
MB
Part A
50ft
Work
Zone
100ft
Work
Zone
150ft
Work
Zone
200ft
Work
Zone
250ft
Work
Zone
300ft
Work
Zone
350ft
Work
Zone
400ft
Work
Zone
450ft
Work
Zone
500ft
Work
Zone
1000ft
Work
Zone
1500ft
Work
Zone
RIGHT LANE
MUST EXIT
R3-33R
ONLYONLY
STOP
HERE ON
RED
ONLYONLYONLYONLYONLYONLY
ONLY
Navigator
ONLYONLY
ONLY
ONLYONLYONLYONLY
ONLYONLY
Navigator
Type 3 Barricade
Navigator
Type 3 Barricade
Type 1 Barricade
Navigators
Type 3 Barricade
2-Way Traffic
Vertical Panel
Type 3 Barricade
Barrels
Type 3 Barricade
Barrels
Type 3 Barricade
2-Way Traffic
Vertical Panel
Barrels
Type 3 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
ONLY
ROAD CLOSEDTOTHRU TRAFFIC
TYPE III
R11-2
ROAD
CLOSED
ROAD CLOSEDTO
THRU TRAFFIC
ROAD
CLOSED
TYPE III
R11-2 / CW1-7
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10R
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10L
DETOUR
TYPE III
R11-4 / M4-10R
ROAD CLOSEDTOTHRU TRAFFIC
DETOUR
TYPE III
R11-4 / M4-10L
ROAD CLOSEDTOTHRU TRAFFIC
RAMP
CLOSED
ROAD
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
100ft
Taper
100ft
Buffer
90ft
Shifting
Taper 100ft
1000ft 1600ft
85ft
SIDEWALKCLOSED
600ft
Taper
240ft
Buffer
180ft
Taper
540ft
Taper
660ft
Taper
160ft
320ft
120ft
Buffer
195ft
Buffer
295ft
Buffer 500ft
700ft410ft
Buffer
900ft
600ft
800ft 475ft
Buffer
840ft
Taper
900ft
Taper
540ft
Buffer
N
EW
S
xxft
Shoulder
Taper
KEEP
RIGHT
RIGHT LANE
MUST
TURN RIGHT
R3-7R
LEFT LANE
MUST
TURN LEFT
R3-7L
SIDEWALK CLOSED
USE OTHER SIDE
NOTE: Plan design based on engineered stamped plans provided by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
Type 2 Barricade
Navigators
Type 3 Barricade
Water Barrier
Type 1 Barricade
Barrels
Type 3 Barricade
Water Barrier
Navigators
Type 3 Barricade
Flagger w/Cones
Barrels
Type 3 Barricade
Flagger w/Cones
NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
ALLEY CLOSEDTOTHRU TRAFFIC
TYPE III
R11-2
ALLEY
CLOSED
ROAD CLOSEDTOTHRU TRAFFIC
SIDEWALK CLOSED USE OTHER SIDE
TO BE PLACED AT
DO
NOT
PASS
DONOTDRIVE
ON
SHOULDER
Barrels
SIDEWALKCLOSED
MatchlineStreet NameALL
TRAFFIC
MUST
EXIT
2600ftPRELIMINARY
FOR REVIEW ONLY
PE NO. DATE
KEITH M. HAMILTON 87384 XX/XX/2024
xx
YOUR SPEED
XX
Radar
Trailer
MBSZ
Q-Lynx
MatchlineSIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALKCLOSED
Rumble Strips
Crash Truck/TMA
Water Barrier
Concrete Barrier
***
***
ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1 R5-1YIELDR1-2WRONGWAYR5-1a ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10R ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONExx M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEAD ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4bL CW1-4bRTORAMPR1-2YIELD
CROSSWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
CROSSWALKCLOSED
CROSSWALK CLOSED
USE OTHER SIDE
CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
Fencing
Street Name
ONLYONLY
Water Barrier w/Fence
ADA Pedestrian Barricade
xx
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALKCLOSED
SIDEWALK CLOSED
USE OTHER SIDE
ROADWORK1 MILECW20-1Fxxxx
ONLYONLY
Gate
POLICE
XXXXXXXXXXX CLOSEDBIKE LANExxMPH
BEGIN
ONE
WAY
DETOUR
C S
Navigator w/Lights CW20-5RRIGHTLANECLOSED
1/2 MILE CW20-5RRIGHTLANECLOSED
1000ft CW20-5LLEFTLANECLOSED
1/2 MILE CW20-5LLEFTLANECLOSED
1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1000ft
2LEFT LANESCLOSEDCW20-5aTL1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1/2 MILE
2LEFT LANESCLOSEDCW20-5aTL1/2 MILE
1000ft
1/2 MILE
RAMP
CLOSED
AHEADCW20-3D1000ft
RAMPCLOSEDAHEADCW20-3D1/2 MILE
THRUTRAFFICMERGERIGHTCW4-1ATRTHRUTRAFFICMERGELEFTCW4-1ATLxxCW3-5BUMPCW8-1R9-3 RUMBLESTRIPSAHEADCW17-2TLEFT LANE
MUST EXIT
R3-33L
N
EW
S
Ave A
Denton
Fry St & Hickory St
Fry Street Entertainment
District and Merchants Association
Road Closure
682-268-1982
03/20/2024
Ernie Morales
Matchline
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
ROAD
WORK
1 MILECW20-1FROADWORKAHEADCW20-1D30 180 90 120
Speed Taper Buffer Sign
Spacing
35
40
45
50
245
320
540
600
120
155
195
240
160
240
320
400
55 660 295 500
60 720 350 600
65 780 410 700
70 840 475 800
75 900 540 900
Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”
Fort Worth
-Arrow Board 40MPH+
Richardson
-Sign Sequence (RWA, LCA, LEML/R)
2L Rule-On freeways, FIRST buffer length shall be 2x the length of the Taper fordouble lane closures.
“Diamond” rule for Crossovers
-On the diamonds made to push traffic back over from a 2-way application,
the spacing is to be a 1/2L taper length
1/2L
-”1 Block Rule”
-First Buffer length shall be 2x the length of the Taper for
double lane closures.
Carrollton
-ADA Pedestrian Barricades for sidewalk closures
San Antonio/Austin/Surrounding Areas
-TMAs on all TxDOT plans
- Barrels for sidewalk closures
-Double up signs on TxDot plans
-On freeways, FIRST and SECOND buffer length shall be 2x the length of the Taper for Triple lane closures.Freeway Closure Rule-TMAs to be placed after Type IIIs NTE - LBJ-Flags on “Road Work” signs
Austin
-Must be drawn in black and white
-Arrow Board on all lane closures
Houston
-Arrow Board on all lane closures Downtown
General Notes:
1.Lane Closure from 8.30am - 4.00pm only.
2.Lane shall be open in non-working hours by removing (or turn down)
all lane closure signs (e.g 'Right Lane closed' sign)
Garland
-Double-up Signs
-Add General Notes
-”1 Block Rule”
City of Plano Traffic Control Plan General Notes (rev. 04-18-2022): 1.Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices (TMUTCD) for Streets and Highways, particularly Part 6 – Temporary Traffic Control, and according to any notes provided on the TCP by the City engineer. 2.Lanes may be closed to traffic during 9 AM-4 PM only. Lane closures outside this time window require separate approval. 3.ADA compliant accessible pedestrian routes shall be maintained at all times. 4.Temporary Traffic Control (TTC) devices (cones, signs, barricades) shall only be in place or visible during times while work is in progress. When possible, unnecessary or incorrect devices for the implemented work zone shall be
removed or covered as the work zone changes.
5.Contractor shall contact the City of Plano Project Manager or the Traffic Management Center (972) 941-7289
at least one week prior to lane closing if work is to occur within 100' of a signalized intersection.
6.Any portion of a traffic control plan on an approach to a signalized intersection within 200' of the intersection must
have a maximum traffic control device spacing of 20'.
7.Contactor shall coordinate with the owner or related entity regarding lane closures on any private right of way
(ROW) or street. Contractor shall follow the TMUTCD guidelines during lane closures.
8.Contractor shall coordinate with respective schools regarding any lane closures near or within a school zone.
9.Contractor shall contact any related public transportation agency or DART if lane closures involve, or are near, a
public transportation facility, including Bus Stops.
10.Contractor shall notify homeowners with alley access one week prior to alley closing.
11.Contractor shall contact the City Environmental Waste Services Department and coordinate the work so as to
not interrupt the trash pickup schedule.
12.Any excavation more than 2" below the road surface and within 10' of the open path of travel for vehicles will
require vertical panel or barrel delineation. Any excavation more than 24" below the road surface will require
positive lateral control barriers, such as water filled barricades or concrete barriers. Positive lateral control barriers
must be compliant in design and installation with TxDOT Standards 8-01 "Treatment for various edge conditions".
Houston BRANCH
_TMA on all TxDOT TCPs CW1-3R CW1-3LG20-1bR NEXT MILESXXROAD WORKWHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10TG20-1bL NEXT MILESXXROAD WORK NEXT MILESXXROAD WORK NEXT MILESXXWORK ZONExxROADWORKAHEADCW20-1DENDROAD WORKG20-2ENDWORK ZONEG20-2
Flagger w/Cones
2-Way Traffic
Vertical Panel
Project Limits SHARETHEROADBIKELANECLOSEDSHARETHEROAD
Keith Hamilton
BEGINROAD WORKNEXT X MILESG20-TNAMEADDRESSCITYSTATECONTRACTORG20-6T
Devices spaced on 35ft centers
Posted speed limit 45MPH
Devices spaced on 25ft centers
Posted speed limit 35MPH
Devices spaced on 30ft centers
Posted speed limit 40MPH
Devices spaced on 40ft centers
Posted speed limit 50MPH
Devices spaced on 20ft centers
Posted speed limit 30MPH
Devices spaced on 45ft centers
Posted speed limit 55MPH
Devices spaced on 50ft centers
Posted speed limit 60MPH
Devices spaced on 55ft centers
Posted speed limit 65MPH
Devices spaced on 60ft centers
Posted speed limit 70MPH
Devices spaced on 65ft centers
Posted speed limit 75MPH
Devices spaced on 70ft centers
Posted speed limit 80MPH
Tony Troxclair
Daniel Barron
Matt Sauer
Cole Benton
Michael Cooper
Devan Diviney
Cristian Martinez
Eric Putnam
Alex Thlang Lauren Putnam
Cisco Meza
Cole Wilson
Chuy DeSantiago
Bianca Ortiz
Cristobal Olvera
Josh Aumiller
Jesse Barron
Cody Harvey
Justin LaRose
Russell Johnson
Roland Campa
Ronald GreenSteven Rodriguez
Ivan Espinosa
Ashley Clark
Brian Barraza
Deven DeRouenMaribel Chavez
Ruben Hernandez
Wesley Campbell
Ivan Espinosa
Navigator
Type 3 Barricade
Type 1 Barricade
Flashing Electronic
Arrow Board
Sheet 1
4
M4-9S
M4-9LM4-9R M4-9SM4-9LM4-9RM4-9R
M4-9LM4-9RM4-9SM4-9S
M4-9RM4-9LROAD
WORK
AHEADCW20-1D
DETOUR
AHEADCW20-2DROAD
CLOSED
AHEADCW20-3DROADWORKAHEADCW20-1DROADWORK
AHEADCW20-1D
ROAD
WORK
AHEADCW20-1DROADWORKAHEADCW20-1DDETOURAHEADCW20-2DDETOURAHEADCW20-2DDETOURAHEADCW20-2DROAD
WORK
AHEADCW20-1D
ROAD
WORKAHEADCW20-1DROADWORKAHEADCW20-1DDETOURAHEADCW20-2DROAD
WORK
AHEADCW20-1D
ROAD
CLOSED
AHEADCW20-3DROADCLOSEDAHEADCW20-3DROADCLOSED
AHEADCW20-3DROADWORKAHEADCW20-1DROADCLOSEDAHEADCW20-3DROADCLOSED TYPE III R11-2 / CW1-7ROAD CLOSEDTOTHRU TRAFFICDETOURAHEADCW20-2DDETOUR
AHEADCW20-2DDETOUR
AHEADCW20-2DONLYONLYM4-9L
M4-9LM4-9R120ft120ft120ft
120ft120ft
120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft120ft
120ft120ftROADCLOSEDDETOUR TYPE III R11-2 / M4-10RTYPE III R11-2ROADCLOSEDHickory St
Oak St
Mulberry StMulberry StAve AFry StWelch StAve BJagoe StAvenue CFry StWelch StFulton StHickory St
Scripture St
Avenue CAve B120ft120ft120ft
ROAD
WORKAHEADCW20-1DROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DDETOURAHEADCW20-2DType 1 Type 2 Type 3 ADA
Phase 1
Sheet 1
Hamilton Duffy, PC
Consulting
Tex Reg F-5260
90ft
Buffer120ft 245ft
Taper
320ft
Taper
155ft
Buffer240ft
400ft
350ft
Buffer
720ft
Taper
780ft
Taper
Arrow
Board
MB
Part A
50ft
Work
Zone
100ft
Work
Zone
150ft
Work
Zone
200ft
Work
Zone
250ft
Work
Zone
300ft
Work
Zone
350ft
Work
Zone
400ft
Work
Zone
450ft
Work
Zone
500ft
Work
Zone
1000ft
Work
Zone
1500ft
Work
Zone
RIGHT LANE
MUST EXIT
R3-33R
ONLYONLY
STOP
HERE ON
RED
ONLYONLYONLYONLYONLYONLY
ONLY
Navigator
ONLYONLY
ONLY
ONLYONLYONLYONLY
ONLYONLY
Navigator
Type 3 Barricade
Navigator
Type 3 Barricade
Type 1 Barricade
Navigators
Type 3 Barricade
2-Way Traffic
Vertical Panel
Type 3 Barricade
Barrels
Type 3 Barricade
Barrels
Type 3 Barricade
2-Way Traffic
Vertical Panel
Barrels
Type 3 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
Type 1 Barricade
Navigator
Type 3 Barricade
Type 2 Barricade
Barrels
Type 3 Barricade
Type 2 Barricade
ONLY
ROAD CLOSEDTOTHRU TRAFFIC
TYPE III
R11-2
ROAD
CLOSED
ROAD CLOSEDTO
THRU TRAFFIC
ROAD
CLOSED
TYPE III
R11-2 / CW1-7
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10R
ROAD
CLOSED
DETOUR
TYPE III
R11-2 / M4-10L
DETOUR
TYPE III
R11-4 / M4-10R
ROAD CLOSEDTOTHRU TRAFFIC
DETOUR
TYPE III
R11-4 / M4-10L
ROAD CLOSEDTOTHRU TRAFFIC
RAMP
CLOSED
ROAD
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
100ft
Taper
100ft
Buffer
90ft
Shifting
Taper 100ft
1000ft 1600ft
85ft
SIDEWALKCLOSED
600ft
Taper
240ft
Buffer
180ft
Taper
540ft
Taper
660ft
Taper
160ft
320ft
120ft
Buffer
195ft
Buffer
295ft
Buffer 500ft
700ft410ft
Buffer
900ft
600ft
800ft 475ft
Buffer
840ft
Taper
900ft
Taper
540ft
Buffer
N
EW
S
xxft
Shoulder
Taper
KEEP
RIGHT
RIGHT LANE
MUST
TURN RIGHT
R3-7R
LEFT LANE
MUST
TURN LEFT
R3-7L
SIDEWALK CLOSED
USE OTHER SIDE
NOTE: Plan design based on engineered stamped plans provided by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
Type 2 Barricade
Navigators
Type 3 Barricade
Water Barrier
Type 1 Barricade
Barrels
Type 3 Barricade
Water Barrier
Navigators
Type 3 Barricade
Flagger w/Cones
Barrels
Type 3 Barricade
Flagger w/Cones
NOTE: Plan requested by Contractor may not conform to TXDOT/MUTCD standards.
Buyers Barricades shall not be held responsible for results of deviation from standardized traffic/safety control.
ALLEY CLOSEDTOTHRU TRAFFIC
TYPE III
R11-2
ALLEY
CLOSED
ROAD CLOSEDTOTHRU TRAFFIC
SIDEWALK CLOSED USE OTHER SIDE
TO BE PLACED AT
DO
NOT
PASS
DONOTDRIVE
ON
SHOULDER
Barrels
SIDEWALKCLOSED
MatchlineStreet NameALL
TRAFFIC
MUST
EXIT
2600ftPRELIMINARY
FOR REVIEW ONLY
PE NO. DATE
KEITH M. HAMILTON 87384 XX/XX/2024
xx
YOUR SPEED
XX
Radar
Trailer
MBSZ
Q-Lynx
MatchlineSIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALKCLOSED
Rumble Strips
Crash Truck/TMA
Water Barrier
Concrete Barrier
***
***
ROADWORKAHEADCW20-1DCW20-5RRIGHTLANECLOSED CW20-5DLLEFTLANECLOSEDAHEAD RIGHTLANECLOSEDAHEADCW20-5DRTURNLANECLOSEDCW20-5TCENTERLANECLOSEDCW20-5CROADCLOSEDAHEADCW20-3DDETOURAHEADCW20-2DONE LANEROADAHEADCW20-4DBEPREPAREDTOSTOPCW3-4CW20-7LANE ENDSMERGERIGHTCW9-2TRLANE ENDSMERGELEFTCW9-2TL2RIGHT LANESCLOSEDCW20-5aTRSHOULDERWORKCW21-5ROADNARROWSCW5-1TRUCKSENTERINGROADWAYCW27-1TCW3-2CW4-3RCW4-3LCW21-1aT CW1-4LCW1-4RCW6-3CW12-1CW12-1CW12-1ENDROAD WORKG20-2ENDROAD WORKG20-2CW20-5LLEFTLANECLOSEDTOONCOMINGTRAFFICR1-2YIELDR1-2 APSTOPR1-1 R5-1YIELDR1-2WRONGWAYR5-1a ONE WAYR6-1L ONE WAYR6-1RCW1-7DETOURM4-10L DETOURM4-10R ROADCLOSEDR11-2R11-3ROAD CLOSEDAHEADLOCAL TRAFFIC ONLYROAD CLOSEDTOTHRU TRAFFICR11-4****LOOSEGRAVELCW8-7FRESHOILCW21-2TURNLANECLOSEDAHEADCW20-5DTCENTERLANECLOSEDAHEADCW20-5DCCW28-1TPOWER LINESCW23-2NEWTRAFFICPATTERNAHEADUTILITYWORKAHEADCW21-7DWORK ZONExx M4-9SM4-9L M4-9RR3-2R3-1 PR8-3R5-2R3-4INTERSTATETEXAS**ONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LONE WAYR6-1RONE WAYR6-1LCONSTRUCTIONENTRANCE**M4-9RM4-9L RAMPCLOSEDAHEADCW20-3DSLOW ALLEYCLOSEDAHEAD2RIGHT LANESCLOSED1/2 MILECW20-5aTR2LEFT LANESCLOSEDCW20-5aTLSPECIALEVENTAHEAD ENDWORK ZONEG20-2ENDWORK ZONEG20-2CW3-3CW3-1FRWYCLOSEDAHEADCW20FY-3D CW1-4bL CW1-4bRTORAMPR1-2YIELD
CROSSWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
CROSSWALKCLOSED
CROSSWALK CLOSED
USE OTHER SIDE
CITY:
CONTRACTOR:
JOB NAME:
NOTESSALESMAN EXECUTIVE
TCP DESIGNER
LEGEND
SCOPE OF WORK:
LOCATION:
CONTACT NUMBER:
CONTACT:
DATE:Reedie Lea
THIS PLAN IS FOR ILLUSTRATIVE PURPOSES ONLY AND
IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM THE REQUIREMENTS SET FORTH BY RELATED CONTRACT DOCUMENTS, THE TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) OR THE OVERALL
RESPONSIBILITY TO TRAFFIC CONTROL SAFETY.
All Traffic Control Plans (TCPs) are the property of Buyers
Barricades, Inc. and are included with Buyers Barricades
rental agreements. Traffic Control Plans issued without a
rental agreement will be charged to the customer.
Fencing
Street Name
ONLYONLY
Water Barrier w/Fence
ADA Pedestrian Barricade
xx
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALKCLOSED
SIDEWALK CLOSED
USE OTHER SIDE
ROADWORK1 MILECW20-1Fxxxx
ONLYONLY
Gate
POLICE
XXXXXXXXXXX CLOSEDBIKE LANExxMPH
BEGIN
ONE
WAY
DETOUR
C S
Navigator w/Lights CW20-5RRIGHTLANECLOSED
1/2 MILE CW20-5RRIGHTLANECLOSED
1000ft CW20-5LLEFTLANECLOSED
1/2 MILE CW20-5LLEFTLANECLOSED
1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1000ft
2LEFT LANESCLOSEDCW20-5aTL1000ft
2
RIGHT LANES
CLOSEDCW20-5aTR1/2 MILE
2LEFT LANESCLOSEDCW20-5aTL1/2 MILE
1000ft
1/2 MILE
RAMP
CLOSED
AHEADCW20-3D1000ft
RAMPCLOSEDAHEADCW20-3D1/2 MILE
THRUTRAFFICMERGERIGHTCW4-1ATRTHRUTRAFFICMERGELEFTCW4-1ATLxxCW3-5BUMPCW8-1R9-3 RUMBLESTRIPSAHEADCW17-2TLEFT LANE
MUST EXIT
R3-33L
N
EW
S
Ave A
Denton
Fry St & Hickory St
Fry Street Entertainment
District and Merchants Association
Road Closure
682-268-1982
03/20/2024
Ernie Morales
Matchline
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
Flashing Electronic
Arrow Board
ROAD
WORK
1 MILECW20-1FROADWORKAHEADCW20-1D30 180 90 120
Speed Taper Buffer Sign
Spacing
35
40
45
50
245
320
540
600
120
155
195
240
160
240
320
400
55 660 295 500
60 720 350 600
65 780 410 700
70 840 475 800
75 900 540 900
Special RulesPlano-Double-up Signs-Add General NotesDallas-Intersections Count As Buffer-No “End Road Work”
Fort Worth
-Arrow Board 40MPH+
Richardson
-Sign Sequence (RWA, LCA, LEML/R)
2L Rule-On freeways, FIRST buffer length shall be 2x the length of the Taper fordouble lane closures.
“Diamond” rule for Crossovers
-On the diamonds made to push traffic back over from a 2-way application,
the spacing is to be a 1/2L taper length
1/2L
-”1 Block Rule”
-First Buffer length shall be 2x the length of the Taper for
double lane closures.
Carrollton
-ADA Pedestrian Barricades for sidewalk closures
San Antonio/Austin/Surrounding Areas
-TMAs on all TxDOT plans
- Barrels for sidewalk closures
-Double up signs on TxDot plans
-On freeways, FIRST and SECOND buffer length shall be 2x the length of the Taper for Triple lane closures.Freeway Closure Rule-TMAs to be placed after Type IIIs NTE - LBJ-Flags on “Road Work” signs
Austin
-Must be drawn in black and white
-Arrow Board on all lane closures
Houston
-Arrow Board on all lane closures Downtown
General Notes:
1.Lane Closure from 8.30am - 4.00pm only.
2.Lane shall be open in non-working hours by removing (or turn down)
all lane closure signs (e.g 'Right Lane closed' sign)
Garland
-Double-up Signs
-Add General Notes
-”1 Block Rule”
City of Plano Traffic Control Plan General Notes (rev. 04-18-2022): 1.Contractor shall be responsible to maintain traffic control as set forth in the Texas Manual on Uniform Traffic Control Devices (TMUTCD) for Streets and Highways, particularly Part 6 – Temporary Traffic Control, and according to any notes provided on the TCP by the City engineer. 2.Lanes may be closed to traffic during 9 AM-4 PM only. Lane closures outside this time window require separate approval. 3.ADA compliant accessible pedestrian routes shall be maintained at all times. 4.Temporary Traffic Control (TTC) devices (cones, signs, barricades) shall only be in place or visible during times while work is in progress. When possible, unnecessary or incorrect devices for the implemented work zone shall be
removed or covered as the work zone changes.
5.Contractor shall contact the City of Plano Project Manager or the Traffic Management Center (972) 941-7289
at least one week prior to lane closing if work is to occur within 100' of a signalized intersection.
6.Any portion of a traffic control plan on an approach to a signalized intersection within 200' of the intersection must
have a maximum traffic control device spacing of 20'.
7.Contactor shall coordinate with the owner or related entity regarding lane closures on any private right of way
(ROW) or street. Contractor shall follow the TMUTCD guidelines during lane closures.
8.Contractor shall coordinate with respective schools regarding any lane closures near or within a school zone.
9.Contractor shall contact any related public transportation agency or DART if lane closures involve, or are near, a
public transportation facility, including Bus Stops.
10.Contractor shall notify homeowners with alley access one week prior to alley closing.
11.Contractor shall contact the City Environmental Waste Services Department and coordinate the work so as to
not interrupt the trash pickup schedule.
12.Any excavation more than 2" below the road surface and within 10' of the open path of travel for vehicles will
require vertical panel or barrel delineation. Any excavation more than 24" below the road surface will require
positive lateral control barriers, such as water filled barricades or concrete barriers. Positive lateral control barriers
must be compliant in design and installation with TxDOT Standards 8-01 "Treatment for various edge conditions".
Houston BRANCH
_TMA on all TxDOT TCPs CW1-3R CW1-3LG20-1bR NEXT MILESXXROAD WORKWHEN WORKERS ARE PRESENT WORK ZONETRAFFIC FINES DOUBLE TALK OR TEXT LATERSTAY ALERTG20-10TG20-1bL NEXT MILESXXROAD WORK NEXT MILESXXROAD WORK NEXT MILESXXWORK ZONExxROADWORKAHEADCW20-1DENDROAD WORKG20-2ENDWORK ZONEG20-2
Flagger w/Cones
2-Way Traffic
Vertical Panel
Project Limits SHARETHEROADBIKELANECLOSEDSHARETHEROAD
Keith Hamilton
BEGINROAD WORKNEXT X MILESG20-TNAMEADDRESSCITYSTATECONTRACTORG20-6T
Devices spaced on 35ft centers
Posted speed limit 45MPH
Devices spaced on 25ft centers
Posted speed limit 35MPH
Devices spaced on 30ft centers
Posted speed limit 40MPH
Devices spaced on 40ft centers
Posted speed limit 50MPH
Devices spaced on 20ft centers
Posted speed limit 30MPH
Devices spaced on 45ft centers
Posted speed limit 55MPH
Devices spaced on 50ft centers
Posted speed limit 60MPH
Devices spaced on 55ft centers
Posted speed limit 65MPH
Devices spaced on 60ft centers
Posted speed limit 70MPH
Devices spaced on 65ft centers
Posted speed limit 75MPH
Devices spaced on 70ft centers
Posted speed limit 80MPH
Tony Troxclair
Daniel Barron
Matt Sauer
Cole Benton
Michael Cooper
Devan Diviney
Cristian Martinez
Eric Putnam
Alex Thlang Lauren Putnam
Cisco Meza
Cole Wilson
Chuy DeSantiago
Bianca Ortiz
Cristobal Olvera
Josh Aumiller
Jesse Barron
Cody Harvey
Justin LaRose
Russell Johnson
Roland Campa
Ronald GreenSteven Rodriguez
Ivan Espinosa
Ashley Clark
Brian Barraza
Deven DeRouenMaribel Chavez
Ruben Hernandez
Wesley Campbell
Ivan Espinosa
Navigator
Type 3 Barricade
Type 1 Barricade
Flashing Electronic
Arrow Board
Sheet 2
5
FY 23/24 Council Requests
Number of Requests Per Quarter Total Requests Made by Council Member Requests by Department
Please Note: the total number of requests per council member or department may not match, as several council members and/ or departments may be associated with a single request.
Council
Requests
4
Number of Pending Requests by Council Member
6
Friday Report - Council RequestsSummary of RequestCouncil Member Requestor Date Received Staff AssignedDepartmentCommentsStatus1Council Member requesting information onno-mow zones near wildflowersCouncil Member Meltzer04/19/24Ziad KharratParksReferred to staff.2Council Member forwarded a request forinformation on On-Site Septic Facilitiesrequirement variances.Council Member Meltzer04/15/24Michael Gange, ScottMcDonaldDevelopment Services EnvironmentalServicesStaff formulating aresponse.3Council Member forwarded an email from anonprofit organization interested in seekinggrants with the City of Denton.Council Member Meltzer04/17/24Danielle ShawCommunity ServicesCommunity servicesconnected with groupabout City grant programs.4Resident inquiry regarding drainage issueon S. Bonnie Brae.Council Member Meltzer04/15/24Ethan Cox, Trevor Crain Capital Projects/Engineering/Public WorksRisk ManagementStaff responded toresident with the results ofthe City's investigation intothe issues.Page 1 of 1Exported on April 19, 2024 12:15:08 PM PDT7
Meeting Calendar
City of Denton City Hall
215 E. McKinney St.
Denton, Texas 76201
www.cityofdenton.com
Criteria : Begin Date: 4/1/2024, End Date: 6/30/2024
Date Time Meeting LocationMeeting Body
April 2024
4/1/2024 5:30 PM Board of Ethics Cancelled
4/1/2024 6:00 PM Parks, Recreation and Beautification
Board
Civic Center Community Room
4/2/2024 11:00 AM City Council Development Service Center
4/2/2024 2:00 PM City Council Council Work Session Room
&
Council Chambers
4/4/2024 8:00 AM Agenda Committee CANCELLED
4/4/2024 8:30 AM Economic Development Partnership
Board
Development Service Center
4/4/2024 4:00 PM Public Art Committee Civic Center Community Room
4/8/2024 9:00 AM Public Utilities Board Council Work Session Room
4/8/2024 5:30 PM Historic Landmark Commission CANCELLED
4/8/2024 5:30 PM Library Board South Branch Library
4/10/2024 11:00 AM Economic Development Partnership
Board
Development Service Center
4/10/2024 3:00 PM Airport Advisory Board CANCELLED
4/10/2024 5:30 PM Planning and Zoning Commission Council Work Session Room
&
Council Chambers
4/11/2024 2:30 PM City Council Chamber Testing
4/11/2024 3:00 PM Committee on Persons with Disabilities Development Service Center
4/11/2024 3:00 PM Health & Building Standards
Commission
Development Service Center
4/12/2024 12:00 PM Community Services Advisory
Committee
Development Service Center
4/16/2024 2:00 PM City Council Council Work Session Room
&
Council Chambers
4/16/2024 2:30 PM Downtown Plan Update Advisory Group Development Service Center
4/22/2024 9:00 AM Public Utilities Board Council Work Session Room
Page 1City of Denton Printed on 4/19/2024
8
Date Time Meeting LocationMeeting Body
Meeting Calendar continued...
4/22/2024 5:30 PM Historic Landmark Commission CANCELLED
4/22/2024 5:30 PM Zoning Board of Adjustment CANCELLED
4/23/2024 9:30 AM Committee on the Environment Pratt Industries
4/23/2024 9:30 AM Sustainability Framework Advisory
Committee
Pratt Industries
4/24/2024 10:00 AM Mobility Committee Council Work Session Room
4/24/2024 1:00 PM Civil Service Commission Central Fire Station
Emergency Operations Room
4/24/2024 5:00 PM Planning and Zoning Commission Council Work Session Room
&
Council Chambers
4/26/2024 8:00 AM Community Partnership Committee City Council Work Session Room
4/29/2024 5:30 PM Internal Audit Advisory Committee Council Work Session Room
May 2024
5/2/2024 8:00 AM Agenda Committee Council Work Session Room
5/2/2024 8:30 AM Economic Development Partnership
Board
Development Service Center
5/3/2024 1:00 PM Bond Oversight Committee Development Service Center
5/6/2024 9:00 AM Public Utilities Board Council Work Session Room
5/6/2024 6:00 PM Parks, Recreation and Beautification
Board
Civic Center Community Room
5/7/2024 2:00 PM City Council Council Work Session Room
&
Council Chambers
5/8/2024 10:00 AM Animal Shelter Advisory Committee Animal Services Training Room
5/8/2024 11:00 AM Economic Development Partnership
Board
Development Service Center
5/8/2024 3:00 PM Airport Advisory Board Airport Terminal Meeting Room
5/9/2024 3:00 PM Health & Building Standards
Commission
Development Service Center
5/10/2024 12:00 PM Community Services Advisory
Committee
Development Service Center
5/13/2024 5:30 PM Historic Landmark Commission Development Service Center
5/13/2024 5:30 PM Library Board Emily Fowler Central Library
5/14/2024 12:30 PM City Council Council Work Session Room
&
Council Chambers
5/15/2024 5:00 PM Planning and Zoning Commission Council Work Session Room
&
Council Chambers
Page 2City of Denton Printed on 4/19/2024
9
Date Time Meeting LocationMeeting Body
Meeting Calendar continued...
5/16/2024 3:00 PM Committee on Persons with Disabilities Development Service Center
5/20/2024 5:30 PM Zoning Board of Adjustment Development Service Center
5/21/2024 2:00 PM City Council Council Work Session Room
&
Council Chambers
5/22/2024 12:00 PM Tax Increment Reinvestment Zone
Number One Board
Development Service Center
5/24/2024 1:00 PM Sustainability Framework Advisory
Committee
Council Work Session Room
5/29/2024 10:00 AM Mobility Committee Council Work Session Room
5/29/2024 5:00 PM Planning and Zoning Commission Council Work Session Room
&
Council Chambers
June 2024
6/3/2024 5:30 PM Board of Ethics Council Work Session Room
6/3/2024 6:00 PM Parks, Recreation and Beautification
Board
Civic Center Community Room
6/4/2024 2:00 PM City Council Council Work Session Room
&
Council Chambers
6/6/2024 8:00 AM Agenda Committee Council Work Session Room
6/6/2024 8:30 AM Economic Development Partnership
Board
Development Service Center
6/10/2024 5:30 PM Historic Landmark Commission Development Service Center
6/10/2024 5:30 PM Library Board North Branch Library, AMP Room
6/12/2024 11:00 AM Economic Development Partnership
Board
Development Service Center
6/12/2024 3:00 PM Airport Advisory Board Airport Terminal Meeting Room
6/12/2024 5:00 PM Planning and Zoning Commission Council Work Session Room
&
Council Chambers
6/13/2024 3:00 PM Health & Building Standards
Commission
Development Service Center
6/14/2024 12:00 PM Community Services Advisory
Committee
Development Service Center
6/18/2024 2:00 PM City Council Council Work Session Room
&
Council Chambers
6/24/2024 5:30 PM Zoning Board of Adjustment Development Service Center
6/26/2024 10:00 AM Mobility Committee Council Work Session Room
Page 3City of Denton Printed on 4/19/2024
10
Date Time Meeting LocationMeeting Body
Meeting Calendar continued...
6/26/2024 5:00 PM Planning and Zoning Commission Council Work Session Room
&
Council Chambers
6/28/2024 1:00 PM Sustainability Framework Advisory
Committee
Council Work Session Room
Page 4City of Denton Printed on 4/19/2024
11
Meeting Date Item Legistar ID Departments Involved Type Estimated Time
A. Charter Election Discussion - Municipal Judge 24-809 Municipal Court City Business 0:30
B. Council Vote Record 24-810 City Manager's Office Council Request 0:30
C. Two Minute Pitch:24-083 City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 2:00
A. Community Housing Initiatives Audit 23-2458 Internal Audit City Business 0:30
B. Charter Election Discussion 24-113 City Manager's Office Council Request 0:45
C. Affordable Housing Bond Discussion 24-287 Community Development City Business 0:45
D. Two Minute Pitch:24-084 City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 3:00
A. Electric Systems Operations : Phase 1 Audit 23-2459 Internal Audit City Business 0:30
B. Charter Election Discusssion - Summary and Presentation of Charges TBD City Manager's Office Council Request 0:30
C. Board of Ethics Update TBD Internal Audit City Business 1:00
D. Design Criteria Manual Updates 23-1855 Engineering Council Request 0:30
E. Two Minute Pitch:TBD City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 3:30
A. Electric Systems Operations: Phase 2 Audit 23-2460 Internal Audit City Business 0:30
B. Ad Valorem Rates and General Fund Forecast 24-239 Finance City Business 1:00
C. Two Minute Pitch:TBD City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 2:30
A. Fiscal Year 2024-25 preliminary Capital Improvement Program.24-225 Finance City Business 0:30
B. Water and Wastewater Impact Fee Study Update 24-020 Water Utilities City Business 1:00
C. Two Minute Pitch:TBD City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 2:30
A. Audit of Vendor Management 24-249 Internal Audit City Business 0:30
B. Fiscal Year 2024-25 preliminary utility budgets and rates for Solid Waste, Water,
Wastewater/Drainage, Electric and Customer Service 24-226 Finance City Business TBD
C. Affordable Housing Strategic Toolkit 24-653 Community Development City Business 0:30
D. Two Minute Pitch:TBD City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 2:00
A. Follow-Up of Payroll Admin. Audit 24-250 Internal Audit City Business 0:15
B. Follow-Up of Fleet Services Audit 24-251 Internal Audit City Business 0:15
C. Two Minute Pitch:TBD City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 1:30
A. Fiscal Year 2024-25 City Manager’s Proposed Budget, Capital Improvement Program, and
Five-Year Financial Forecast 24-227 Finance City Business TBD
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 0:30
A. Audit of Development Planning 24-252 Internal Audit City Business 0:30
B. Affordable Housing Strategic Toolkit 24-654 Community Development City Business 0:45
C. Fiscal Year 2024-25 City Manager’s Proposed Budget, Capital Improvement Program, and
Five-Year Financial Forecast 24-228 Finance City Business 1:00
D. Two Minute Pitch:TBD City Manager's Office Council Request 0:30
Closed Meeting Item(s):Legal (if any)City Business 0:30
Total Est. Time: 3:15
Item Legistar ID Departments Type Estimated Work
Session Date
Parking Minimum TBD Development Services Council Request TBD
Second Follow-Up of Police Property Room Audit (15 min.)24-253 Internal Audit City Business 09/17/2024
Follow-up of EMS: Ambulance Billing Audit (15 min.)24-254 Internal Audit City Business 09/17/2024
Audit of Park Management & Planning (30 min.)24-255 Internal Audit City Business 09/24/2024
Roadway Impact Fees TBD City Manager's Office City Business TBD
Non-Annexation Agreements TBD City Manager's Office City Business TBD
Item Dates Departments Type Estimated Work
Item Date Approved Department Estimated Hours to Complete Requestor
Vote Centers Resolution 10/17/2023 City Manager's Office TBD
Other Major Items for Meeting:
May 14
Canvassing of Election Results
Special Called (@12:30 p.m.)
Other Major Items for Meeting:
Canvass of May 4 General Election Returns, Oaths/Statement of Office, Certificate of Election, Proclamations of Appreciation
May 21
Work Session (@2:00 p.m.)
Regular Meeting (@6:30 p.m.)
May 7
Work Session (@2:00 p.m.)
Regular Meeting (@6:30 p.m.)
Other Major Items for Meeting:
Other Major Items for Meeting:
June 18
Work Session (@2:00 p.m.)
Regular Meeting (@6:30 p.m.)
June 21
City Council Retreat - Day 1 City Council Retreat - Day 1 TBD City Manager's Office City Business TBD
June 22
City Council Retreat - Day 2 City Council Retreat - Day 2 TBD City Manager's Office City Business TBD
Work Session To Be Determined
Tentative Work Session Topics and Meeting Information
Updated: April 19, 2024
Approved Council Pitches to be Scheduled
Council Priorities and Significant Work Plan Items
to be Scheduled
Other Major Items for Meeting:
August 10 (Saturday)
Budget Workshop (@9:00 a.m.)
At the Council Work Session Room
Other Major Items for Meeting:
July 23
Work Session (@2:00 p.m.)
Special Called Meeting (@6:30 p.m.)
August 6
Work Session (@2:00 p.m.)
Regular Called Meeting (@6:30 p.m.)
August 20
Work Session (@2:00 p.m.)
Regular Called Meeting (@6:30 p.m.)
Other Major Items for Meeting:
Other Major Items for Meeting:
Other Major Items for Meeting:
July 16
Work Session (@2:00 p.m.)
Regular Meeting (@6:30 p.m.)
June 4
Work Session (@2:00 p.m.)
Regular Meeting (@6:30 p.m.)
*This is for planning purposes only. Dates are subject to change.12
1 Street Closure Report: Upcoming ClosuresSCR Apr 22nd - 28thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact1Beall St (1400)Nicosia StHermalinda Dr05/06/24 06/07/24 Curb and Gutter RepairStreetsRoy San Miguel2Thunderbird DrCrestmeadow StWestview Trl04/29/24 05/24/24 Curb and Gutter and Sidewalk RepairStreetsRoy San Miguel3Wind River Ln @ ShorelineComo Lake DrEnchanted Lake Dr05/06/24 06/07/24 Concrete Panel RepairStreetsRoy San Miguel Exported on April 19, 2024 11:29:22 AM CDT13
2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact1Allred RdOakleaf TrlJohn Paine Rd04/26/24 08/30/24 New road for Allred forSagebrook PH llPublic Works Inspections Kent Bull Rivers2Azalea StParvin StLaurel St05/30/23 04/30/24 Utility installations andpavement replacement.EngineeringScott Fettig3Bandera StI-35 Service RdBandera St (WB ~150')02/08/24 05/02/24 Utility RelocationEngineeringShawn Messick4Bell AveSycamore StEagle Dr04/15/24 04/24/24 Utility installations andpavement replacement.EngineeringScott Fettig5Bell AveSycamore StPrairie St08/21/23 05/30/24 Utility installations andpavement replacement.EngineeringScott Fettig6Bellaire DrMontclair PlMcKinney St (East)04/22/24 05/03/24 Valley Gutter RepairStreetsRoy San Miguel7Bernard StAcme StRoselawn Dr05/30/23 05/15/24 Utility installations andpavement replacement.EngineeringScott Fettig8Bradshaw StWilson StPrairie St01/30/23 06/30/24 Utility installations andpavement replacement.EngineeringScott Fettig9Bradshaw StPrairie StSycamore St03/13/23 06/30/24 Utility installations andpavement replacement.EngineeringScott Fettig10Camellia StParvin StLaurel St05/30/23 04/30/24 Utility installations andpavement replacement.EngineeringScott Fettig11Carmel Hills Dr (3405)Las Lomas LnPortola Ln04/03/24 05/01/24 Concrete Panel Repair StreetsRoy San Miguel12Churchill DrChurchill CirWindsor Dr12/11/23 05/08/24 Utility installations andpavement replacementEngineeringTaylor Holt13College Park DrPeach StDead End10/02/23 05/17/24 Street reconstructStreetsRoy San Miguel14Collins StJohnson StDead End West08/22/23 04/30/24 Utility installations andpavement replacement.EngineeringScott Fettig15Crawford StMulberry StSycamore St10/09/23 05/01/24 Utility installations andpavement replacement.EngineeringScott Fettig16Crescent StEctor StHillcrest St12/27/23 05/03/24 Utility installations andpavement replacement.EngineeringScott Fettig17Edwards RdForrest Willow RdDesert Willow Dr03/18/24 04/26/24 Concrete Panel and SidewalkRepairStreetsRoy San Miguel18Fowler DrCollege Park DrPeach St10/02/23 05/17/24 Street reconstructStreetsRoy San Miguel19Gardenview StFallmeadow LnJoyce Ln04/08/24 05/03/24 Valley Gutter RepairStreetsRoy San Miguel20Hickory Creek RdRiverpass DrFM 183003/13/23 12/31/24 Bridge InstallationEngineeringDustin Draper21Highland StLocust StWainwright St01/30/23 05/01/24 Utility installations andpavement replacement.EngineeringScott Fettig22Hillcrest StPanhandle StCrescent St12/27/23 05/01/24 Utility installations andpavement replacement.EngineeringScott Fettig23Jamestown LnMistywood LnLocksley Ln01/22/24 05/08/24 Utility Replacement & StreetReconstructionEngineeringTaylor Holt24Leslie StWillowwood StDudley St08/31/23 04/30/24 Utility installations andpavement replacement.EngineeringScott Fettig25Los Colinas StMesa DriveI-35 Frontage Rd03/01/24 04/30/24 Utility Water/Wastewater linerelocationWater Wastewater Other Shawn Messick26Maid Marion PlJamestown LnLocksley Ln01/24/24 05/08/24 Utility Replacement & StreetReconstructionEngineeringTaylor Holt27Maple StCarroll BlvdElm St07/05/23 05/01/24 Utility installations andpavement replacement.EngineeringScott Fettig28Maple StLocust StElm St04/19/24 05/10/24 Pavement replacement. EngineeringScott Fettig29Maple StElm StCarroll Blvd09/15/23 06/30/24 Utility installations andpavement replacement.Scott Fettig30Maple StAve DAve A01/22/24 08/01/24 Pavement replacement. EngineeringScott Fettig31Masch Branch RdUniversity Dr (US 380)Hampton Rd02/26/24 05/06/24 Reconstruction of Center lane,adding turn lane.Private Development PublicWorks InspectionsEthan Keith Exported on April 19, 2024 11:29:33 AM CDT14
Street/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact32Mayhill RdUniversity Dr (US 380)Prominence Pkwy02/26/24 04/26/24 Installation of new water mainline pipe.Private DevelopmentZabdiel Mota33Mayhill RdIH 35EColorado Blvd01/31/24 04/30/24 This closure will encompass thereconstruction of the Coloradoand Mayhill Intersection.EngineeringTracy L. Beck, PE, PMP34Mayhill RdUS-380/University DriveProminence Pkwy04/22/24 05/17/24 Tying new water line intoexisting water line on N. MayhillRoad for 380/Mayhill Industrial.Private DevelopmentZabdiel Mota35Mayhill RdUniversity Dr (US 380)Prominence Pkwy04/15/24 05/31/24 Installation of new drivewayapproachesPrivate Development PublicWorks InspectionsZabdiel Mota36Mill Pond RdEmerson LnOld North Rd09/11/23 05/08/24 Utility Installations & PavementReconstructionEngineeringTaylor Holt37Mira Vista DrBuena Vista DrPalo Verde Dr04/08/24 05/03/24 ReconstructionStreetsRogelio San Miguel38Mulberry StWood StCrawford St10/09/23 05/01/24 Utility installations andpavement replacement.EngineeringScott Fettig39Mulberry StLocust StElm St02/19/24 05/31/24 Utility installations andpavement replacement.EngineeringScott Fettig40Mulberry StBell AveIndustrial St08/21/23 06/01/24 Utility installations andpavement replacement.EngineeringScott Fettig41Myrtle StFort Worth Dr (HW377)Eagle Dr06/05/23 06/30/24 Utility installations andpavement replacement.EngineeringScott Fettig42Myrtle StMaple StHighland St07/05/23 06/30/24 Utility installations andpavement replacement.Scott Fettig43Myrtle StEagle DrMaple St07/05/23 06/30/24 Utility installations andpavement replacement.EngineeringScott Fettig44Nora LnCentral Village DrMark Ln04/08/24 05/10/24 Sidewalk RepairStreetsRoy San Miguel45Nottingham DrKings RowStratford Ln04/15/24 04/26/24 Valley Gutter RepairStreetsRoy San Miguel46Oakwood DrMcCormick StDead End East10/02/23 05/31/24 Utility installations andpavement replacement.EngineeringScott Fettig47Old Orchard LnWindsor DrDead End03/13/24 04/24/24 Utility Replacement & StreetReconstructionEngineeringTaylor Holt48Osage LnHuron CirCul V Sac03/18/24 04/26/24 Concrete Panel and SidewalkRepairStreetsRoy San Miguel49Peach StBell StLocust St10/02/23 05/17/24 Street reconstructStreetsRoy San Miguel50Pecan Tree DrNora LnDead End North04/08/24 05/10/24 Sidewalk RepairStreetsRoy San Miguel51Pickwick LnOxford LnWindsor Dr08/21/23 05/08/24 Utility Replacement & StreetReconstructionEngineeringTaylor Holt52Pierce StMaple StHighland St07/05/23 06/30/24 Utility installations andpavement replacement.Scott Fettig53Poinsettia BlvdSherman DrPicadilly Ln04/08/24 05/03/24 Infrastructure installation onPoinsettiaPublic Works Inspections Lee Thurmond54Prairie StLocust StBradshaw St04/01/24 07/31/24 Utility installations andpavement replacement.Scott Fettig55Regency CtMark LnCountry Club Rd04/08/24 05/10/24 Sidewalk RepairStreetsRoy San Miguel56Roselawn DrRoselawn CirRailroad crossing02/05/24 04/26/24 Paving, TxDot guardrail, Installnew box culvert. 8x8, new roadfor Roselawn. Eagle Creek PH3A-4Private DevelopmentTaylor Hardgrave57Sycamore StExposition StRailroad Tracks on Sycamore 08/17/23 05/31/24 Paving improvements fromExposition to RailroadPublic Works Inspections Stephany Trammell58Sycamore StExposition StCrawford St03/13/23 05/31/24 Utility installations andpavement replacement.EngineeringScott Fettig59Sycamore StWood StCrawford St10/09/23 05/31/24 Utility installations andpavement replacement.EngineeringScott Fettig60Underwood StNorth Texas BlvdKendolph Dr08/28/23 04/30/24 Pavement replacement. EngineeringScott Fettig61University DrI-35 Frontage RdUniversity Dr (EB ~550')02/19/24 05/01/24 Utility RelocationEngineeringShawn Messick Exported on April 19, 2024 11:29:33 AM CDT15
Street/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact62Wellington DrNorth of Heather LnChurchill Dr12/11/23 05/08/24 Utility installations andpavement replacementEngineeringTaylor Holt63Westward DrNorthwaySouthway04/22/24 05/03/24 Concrete street paving. Private DevelopmentZabdiel Mota64Willowwood StBernard StJacqueline Dr12/27/23 04/30/24 Utility installations andpavement replacement.EngineeringScott Fettig65Wisteria StParvin StLaurel St05/30/23 04/30/24 Utility installations andpavement replacement.EngineeringScott Fettig Exported on April 19, 2024 11:29:33 AM CDT16
3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact1Barcelona StN I-35 Service RdMesa Dr04/08/24 04/15/24 Atmos gas relocationAtmosGavin Petner2Barcelona StI-35 Service RdMesa Dr04/08/24 04/20/24 Atmos gas relocationAtmosGavin Petner3Buena Vista DrMontecito RdMira Vista Dr11/06/23 03/29/24 Street reconstructStreetsJeff Jones4Chaparral CtCooper Branch EDead End08/14/23 03/27/24 Utility Replacement & StreetReconstructionEngineeringTaylor Holt5Eastpark BlvdPanhandle StLinden Dr03/22/24 04/05/24 roadway panel replacement forpcm21-0040Public Works Inspections Lee Thurmond6Fannin StAvenue AAvenue B02/15/24 04/15/24 Atmos gas relocationAtmosPulizzi, Joseph7Mayhill Rd@ Spencer Rd03/28/23 03/29/24 Water main tie-in and turn laneadditionPublic Works Inspections Ryan Cuba8Oak StI-35 Frontage RdOak St (EB ~300')02/08/24 04/17/24 Utility RelocationEngineeringShawn Messick9Prairie StBell AveSkinner St03/04/24 03/29/24 stormwater replacement DrainageStephen Bonner10Randall StSherman DrPicadilly La03/22/24 04/05/24 infrastructure installation onRandall street for pcm22=0063Public Works Inspections Lee Thurmond11Spyglass Hill LnCliffside DrOceanview Dr03/04/24 04/05/24 Concrete Panel and SidewalkRepairStreetsRoy San Miguel12Willowwood StBonnie Brae StBonnie Brae St04/08/24 04/19/24 Installation of Sanitary SewerlineEngineeringRobin Davis Exported on April 19, 2024 11:29:43 AM CDT17