Loading...
2018.02.22_COD_Inspection i Gas Well Inspection Type 2017 Annual � L��OF I n s p e ct i o n s Inspection Cycle 2nd Half _ DENTOR 24hr Phone 817-588-0372 Well Operator Enervest Inspection Date 12-4-17 Record Active Padsite Name 56 GLOSSER 2 Close Date 12-28-17 Jurisdiction CoD Lnc Re-Inspection Date 12-28-17 Site Address 7422 Tom Cole Rd. Padsite Type Single Well Rt 16 2nd Follow-up Inspection Ordinance Reg 2001-465 Inspected by Rod Weatherby Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Imoact 1111-0061 GWP07-0007 GLOSSIER 2 189104 12131301 12/23/2001 4 Rural INSPECTION CHECK LIST Signs General Location Operator Name x Good Need Resolved Fencing x Good Need Resolved Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved Well Name x Good Need Resolved Site Surface x Good Need Resolved 24hr. Phone No x Good Need Resolved Stains x Good Need Resolved RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved No Smoking x Good Need Resolved Weeds/Brush x Good Need Resolved Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved Site Lighting x Good Need Resolved Facility Equipment I Landscaping x Good Need Resolved Wellhead Paint x Good Need Resolved Wellhead Leaks x Good Need Resolved Miscellaneous Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved Tank Battery Leaks Good Need x Resolved Pipeline Markers x Good Need Resolved Equip Height x Good Need Resolved Layout per Site Plan x Good Need Resolved No Wells Approved Db Level @Inspection Erosion Control Referred Fire Dept. I Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred Inspection Comments I @Sep-Kimray SMT venting needs repair, Recommend repair to reg feeding DV controller. On 12/28/17,RW conducted a follow-up_ inspection of the well site.All items requiring further attention from the Operator were resolved.