2018.05.11_COD_FollowUp i Gas Well Inspection Type 2018 Annual
COF I n s p e ct i o n s Inspection Cycle 1st Half
_ DENTOR
24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-19-18
Record Close Date 5-10-18
Active Padsite Name 45 Bradford Pad 2
Jurisdiction CoD Re-Inspection Date 5-10-18
Site Address 1382 Western Blvd
Padsite Type Multi Well Rt 01 2nd Follow-up Inspection
Ordinance Reg 2004-059 Rod Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Aoi No. Spud Date Impact
1109-0134 GWP04-0018 JOHN BRADFORD 2H 255665 12133840 12/18/2009 4 Rural
1109-0133 GWP04-0018 JOHN BRADFORD 3H 255442 12133841 11/27/2009 4 Rural
INSPECTION CHECK LIST
Signs General Location
Operator Name x Good Need Resolved Fencing x Good Need Resolved
Site Address x Good Need Resolved
Entry Gate Locked x Good Need Resolved
Well Name x Good Need Resolved Site Surface x Good Need Resolved
24hr. Phone No x Good Need Resolved
Stains x Good Need Resolved
RRC&Api No x Good Need Resolved
Trash/Debris x Good Need Resolved
No Smoking x Good Need Resolved Weeds/Brush x Good Need Resolved
Reflective/Lighting x Good Need Resolved
Oders/Fumes/Dust x Good Need Resolved
Site Lighting x Good Need Resolved
Facility Equipment Landscaping x Good Need Resolved
Wellhead Paint Good Need x Resolved
Wellhead Leaks Good Need x Resolved Miscellaneous
Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved
Tank Battery Leaks x Good Need Resolved Pipeline Markers x Good Need Resolved
Equip Height x Good Need Resolved
Layout Per Site Plan x Good Need Resolved No Wells Approved 4 Db Level @Inspection
Erosion Control Referred
Fire Dept.
Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred
Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred
Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred
Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred
Inspection Comments
JB3H wellhead regulator venting needs repair, Bare Pipe needs paint, recommend replacing Api stickers. On 5/10/18, RW
_conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were
resolved.