Loading...
2018.06.14_COD_FollowUp i Gas Well Inspection Type 2018 Annual �oF I n s p e ct i o n s Inspection Cycle 1st Half _ DENTOR 24hr Phone 432-570-1911 Well Operator Endeavor Inspection Date 5-14-18 Record Active Padsite Name 141 CONNELL UNIT 1 Close Date 6-14-18 Jurisdiction CoD Re-Inspection Date 6-14-18 Site Address 4322 Bay Meadow Padsite Type Single Well Rt 05 2nd Follow-up Inspection Ordinance Reg 2002-040 Rod Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Imoact 1108-0597 GWP02-0042 CONNELL UNIT 1 197245 12131872 3/21/2003 High INSPECTION CHECK LIST Signs General Location Operator Name x Good Need Resolved Fencing x Good Need Resolved Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved Well Name x Good Need Resolved Site Surface x Good Need Resolved 24hr. Phone No x Good Need Resolved Stains x Good Need Resolved RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved No Smoking x Good Need Resolved Weeds/Brush Good Need x Resolved Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved Site Lighting x Good Need Resolved Facility Equipment I Landscaping x Good Need Resolved Wellhead Paint x Good Need Resolved Wellhead Leaks x Good Need Resolved Miscellaneous Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved Tank Battery Leaks x Good Need Resolved Pipeline Markers x Good Need Resolved Equip Height x Good Need Resolved Layout per Site Plan x Good Need Resolved No Wells Approved Db Level @Inspection Erosion Control Referred Fire Dept. Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred Inspection Comments Storage Tanks need to be labeled per Osha's Hazcom requirements. Weed control needed, On 6/14/18, RW conducted a follow-up inspection of the well site. Operator resolved all items requiring further attention.