2018.06.26_COD_FollowUp Gas Well Inspection Type 2018 Annual
�oF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 5-23-18
Record Close Date 6-25-18
Active Padsite Name 115 RICKS AND CHEEK
Jurisdiction CoD Re-Inspection Date 6-25-18
Site Address 2902 Ft.Worth Dr.
Padsite Type Single Well Rt 46 2nd Follow-up Inspection
Ordinance Reg 2002-040 Rod Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Imoact
1109-0218 GWP02-0030 RICKS AND CHEEK UNIT 1 192740 12131684 10/17/2002 Moderate
INSPECTION CHECK LIST
Signs General Location
Operator Name x Good Need Resolved Fencing Good Need x Resolved
Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved
Well Name x Good Need Resolved
Site Surface x Good Need Resolved
24hr. Phone No x Good Need Resolved
Stains x Good Need Resolved
RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved
No Smoking x Good Need Resolved
Weeds/Brush x Good Need Resolved
Reflective/Lighting x Good Need Resolved
Oders/Fumes/Dust x Good Need Resolved
Site Lighting x Good Need Resolved
Facility Equipment I Landscaping x Good Need Resolved
Wellhead Paint x Good Need Resolved
Miscellaneous
Wellhead Leaks Good Need x Resolved
Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved
Tank Battery Leaks x Good Need Resolved Pipeline Markers x Good Need Resolved
Equip Height x Good Need Resolved
Layout per Site Plan x Good Need Resolved No Wells Approved Db Level @Inspection
Erosion Control Referred
Fire Dept.
Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred
Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred
Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred
Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred
Inspection Comments
Wing Valve and Ball valve at wellhead leaking needs repair, Fence at wellhead needs repair. On 6/25/18,RW conducted a follow-up
inspection of the well site.Operator resolved all items requiring further attention.