2018.07.03_COD_FollowUp i Gas Well Inspection Type 2018 Annual
�oF I n s p e ct i o n s Inspection Cycle 1st Half
_ DENTOR
24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 5-24-18
Record Active Padsite Name 144 GUYER 1 Pad Close Date 6-26-18
Jurisdiction CoD Re-Inspection Date 6-26-18
Site Address 7491 S.Teasley
Padsite Type Multi Well Rt 60 2nd Follow-up Inspection
Ordinance Reg 2005-223 Rod Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name _RRC Id Aoi No. Spud Date Imoact
1108-0637 AGWP07 GUYER 3 239184 12133149 7/6/2007 High
1108-0639 AGWP07 GUYER 4 239193 12133153 8/8/2007 High
1108-0640 GWP04-0007 GUYER,J.H. 1 215832 12132294 4/23/2004 High
INSPECTION CHECK LIST
Signs General Location I
Operator Name x Good Need Resolved Fencing x Good Need Resolved
Site Address x Good Need Resolved
Entry Gate Locked x Good Need Resolved
Well Name x Good Need Resolved
Site Surface x Good Need Resolved
24hr. Phone No x Good Need Resolved Stains x Good Need Resolved
RRC&Api No x Good Need Resolved
Trash/Debris x Good Need Resolved
No Smoking x Good Need Resolved
Weeds/Brush Good Need x Resolved
Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved
Site Lighting x Good Need Resolved
Facility Equipment Landscaping x Good Need Resolved
Wellhead Paint x Good Need Resolved
Wellhead Leaks x Good Need Resolved Miscellaneous
Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved
Tank Battery Leaks Good Need x Resolved Pipeline Markers x Good Need Resolved
Equip Height x Good Need Resolved
No Wells Approved Db Level @Inspection
Layout per Site Plan x Good Need Resolved
Erosion Control Referred
Fire Dept.
Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred
Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred
Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred
Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred
Inspection Comments
Weed Control needed, Tank 1 seep leaking needs repair, DV controllers Venting-repairs made by operator during inspections. On
6/26/18,RW conducted a follow-up inspection of the well site.Operator resolved all items requiring further attention.