Loading...
2018.07.03_COD_FollowUp i Gas Well Inspection Type 2018 Annual �oF I n s p e ct i o n s Inspection Cycle 1st Half _ DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 5-24-18 Record Active Padsite Name 144 GUYER 1 Pad Close Date 6-26-18 Jurisdiction CoD Re-Inspection Date 6-26-18 Site Address 7491 S.Teasley Padsite Type Multi Well Rt 60 2nd Follow-up Inspection Ordinance Reg 2005-223 Rod Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name _RRC Id Aoi No. Spud Date Imoact 1108-0637 AGWP07 GUYER 3 239184 12133149 7/6/2007 High 1108-0639 AGWP07 GUYER 4 239193 12133153 8/8/2007 High 1108-0640 GWP04-0007 GUYER,J.H. 1 215832 12132294 4/23/2004 High INSPECTION CHECK LIST Signs General Location I Operator Name x Good Need Resolved Fencing x Good Need Resolved Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved Well Name x Good Need Resolved Site Surface x Good Need Resolved 24hr. Phone No x Good Need Resolved Stains x Good Need Resolved RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved No Smoking x Good Need Resolved Weeds/Brush Good Need x Resolved Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved Site Lighting x Good Need Resolved Facility Equipment Landscaping x Good Need Resolved Wellhead Paint x Good Need Resolved Wellhead Leaks x Good Need Resolved Miscellaneous Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved Tank Battery Leaks Good Need x Resolved Pipeline Markers x Good Need Resolved Equip Height x Good Need Resolved No Wells Approved Db Level @Inspection Layout per Site Plan x Good Need Resolved Erosion Control Referred Fire Dept. Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred Inspection Comments Weed Control needed, Tank 1 seep leaking needs repair, DV controllers Venting-repairs made by operator during inspections. On 6/26/18,RW conducted a follow-up inspection of the well site.Operator resolved all items requiring further attention.