Loading...
2018.07.20_COD_FollowUp i Gas Well Inspection Type 2018 Annual COF I n s p e ct i o n s Inspection Cycle 1st Half _ DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 5-15-18 Record Close Date 7-19-18 Active Padsite Name 43 DAVIS 1 H Jurisdiction CoD Re-Inspection Date 6-18-18 Site Address 4392 Jim Christal Rd. Padsite Type Single Well Rt 05 2nd Follow-up Inspection 7-19-18 Ordinance Reg 2002-040 Rod Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Imoact 1108-0602 GWP03-0038 DAVIS 1 H 2O3599 12132229 2/19/2004 Low INSPECTION CHECK LIST Signs General Location Operator Name x Good Need Resolved Fencing x Good Need Resolved Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved Well Name x Good Need Resolved Site Surface x Good Need Resolved 24hr. Phone No x Good Need Resolved Stains x Good Need Resolved RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved No Smoking x Good Need Resolved Weeds/Brush x Good Need Resolved Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved Site Lighting x Good Need Resolved Facility Equipment I Landscaping x Good Need Resolved Wellhead Paint x Good Need Resolved Wellhead Leaks x Good Need Resolved Miscellaneous Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved Tank Battery Leaks Good x Need Resolved Pipeline Markers x Good Need Resolved Equip Height Good Need Resolved Layout per Site Plan x Good Need Resolved No Wells Approved Db Level @Inspection Erosion Control Referred Fire Dept. Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred Inspection Comments Containment needs repair,Tanks need Hazcom Labels, On 5/16 reviewed containment condition on site with operator and found separator drain leaking. Operator responded and made repairs within 2 hours of discovery of leak. . On 6/18/18,RW conducted a follow- -up inspection of the well site.All items requiring further attention from the Operator were not yet resolved.The Operator was contacted and/or —another follow-up inspection will be conducted. On 7/19/18 RW conducted the 2nd Follow-up Inspection with Operator representative present- -during inspection. Issues with the well site remain unresolved.Operator is evaluating equipment conditions and will summit a plan with a time frame to resolve issues. Additional inspections will be conducted via spot inspections