Loading...
2018.07.20_COD_FollowUp Gas Well Inspection Type 2018 Annual �oF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 5-21-18 Record Active Padsite Name 66 MAYDAY-UNT Pad Close Date 7-16-18 Jurisdiction CoD Re-Inspection Date 7-16-18 Site Address 1201 S.Bonnie Brae St. Padsite Type Multi Well Rt 30 2nd Follow-up Inspection Ordinance Reg 2004-059 Rod Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name _RRC Id Aoi No. Spud Date Imoact 1109-0255 GWP10-0019 MAYDAY-UNT 3H 216209 12132345 6/25/2004 Moderate 1109-0270 GWP10-0019 MAYDAY-UNT 4H 229906 12132307 5/22/2004 Moderate INSPECTION CHECK LIST Signs General Location I Operator Name x Good Need Resolved Fencing x Good Need Resolved Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved Well Name x Good Need Resolved Site Surface x Good Need Resolved 24hr. Phone No x Good Need Resolved Stains x Good Need Resolved RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved No Smoking x Good Need Resolved Weeds/Brush Good Need x Resolved Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved Site Lighting x Good Need Resolved Facility Equipment Landscaping x Good Need Resolved Wellhead Paint x Good Need Resolved Miscellaneous Wellhead Leaks x Good Need Resolved Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved Tank Battery Leaks Good Need x Resolved Pipeline Markers x Good Need Resolved Equip Height x Good Need Resolved Layout Per Site Plan x Good Need Resolved No Wells Approved Db Level @Inspection Erosion Control Referred I Fire Dept. Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred Inspection Comments Weed control needed, @TB HiLo controller venting needs repair, DV controllers need repair Tank 3 leaking needs repair,Thief hatches need repair. On 6/21/18,RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were not —yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted.On 7/16//18,RW conducted a follow-up —inspection of the well site.Operator resolved all items noted on inspection comments