Loading...
2018.07.20_COD_FollowUp Gas Well Inspection Type 2018 Annual �oF I n s p e ct i o n s Inspection Cycle 1st Half _ DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 5-23-18 Record Active Padsite Name 119 ACME Brick D Pad Close Date 7-12-18 Jurisdiction CoD Re-Inspection Date 7-12-18 Site Address 163 N. 135 Padsite Type Multi Well Rt 55 2nd Follow-up Inspection Ordinance Reg 2002-040 Rod Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Aoi No. Spud Date Imoact 1108-0058 GWP02-0013 ACME BRICK"D" 1H 199511 12131340 10/15/2003 Low 1312-0045 See Ord. No. ACME Brick D 3H 277128 12134428 11/20/2013 Low 1312-0046 See Ord. No. ACME Brick D 4H 274658 12134429 12/5/2013 Low INSPECTION CHECK LIST Signs General Location I Operator Name x Good Need Resolved Fencing x Good Need Resolved Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved Well Name x Good Need Resolved Site Surface x Good Need Resolved 24hr. Phone No x Good Need Resolved Stains x Good Need Resolved RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved No Smoking x Good Need Resolved Weeds/Brush x Good Need Resolved Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved Site Lighting x Good Need Resolved Facility Equipment Landscaping x Good Need Resolved Wellhead Paint x Good Need Resolved Miscellaneous Wellhead Leaks x Good Need Resolved Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved Tank Battery Leaks Good Need x Resolved Pipeline Markers x Good Need Resolved Equip Height x Good Need Resolved No Wells Approved Db Level @Inspection Layout Per Site Plan x Good Need Resolved Erosion Control Referred Fire Dept. Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred Inspection Comments I TB-DV controllers need maint,Tank 3 leaking and load line leaking needs repair, Gas outlet line showing heavy corrosion recommend replacement. On 6/25/18,RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were not —yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted.On 6/27//18, RW conducted a follow-up —inspection of the well site. Operator working to resolve all items requiring further attention. On 7/12//18,RW conducted a- -follow-up inspection of the well site.Operator resolved all items requiring further attention.