2019.05.23_COD_FollowUp Gas Well Inspection Type 2019 Annual
C0F Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone 817-841-8885 Well Operator Bedrock Inspection Date 4-9-19
Record Active Padsite Name 7 BAKER RANCH 3H Close Date 5-9-19
Jurisdiction CoD Lnc Re-Inspection Date 5-9-19
Site Address 4302 Hampton Rd.
Padsite Type Single Well Rt 05 2nd Follow-up Inspection
Ordinance Reg 2005-223 Rod Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Aai No. Spud Date Impact
1109-0295 GWP06-0007 BAKER RANCH 3H 225219 12132853 6/10/2009 Low
INSPECTION CHECK LIST
Signs/Labels General Location
Operator Name • Good Need Resolved Fencing • Good Need Resolved
Site Address • Good Need Resolved Entry Gate Locked • Good Need Resolved
Well Name • Good Need Resolved Site Surface • Good Need Resolved
24hr.Phone No • Good Need Resolved Stains • Good Need Resolved
RRC&Api No • Good Need Resolved Trash/Debris • Good Need Resolved
No Smoking • Good Need Resolved Weeds/Brush • Good Need Resolved
Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved
Wellhead Sign Good Need • Resolved Site Lighting • Good Need Resolved
Tank Battery Good Need Resolved
Landscaping • Good Need Resolved
Storage Tank Labels • Good Need Resolved Erosion Control • Good Need Resolved
Facility Equipment Miscellaneous
Wellhead Paint • Good Need Resolved Electric Lines Safe • Good Need Resolved
Wellhead Leaks • Good Need Resolved Pipeline Markers • Good Need Resolved
Tank Battery Paint Good Need Resolved
Layout per Site Plan • Good Need Resolved
Tank Battery Leaks Good Need Resolved
Tank Integrity Good Need Resolved No Wells Approved Db Level @ Inspection
Containment Integrity Good Need Resolved Fire Dept. I
Drip Pots@ Load Good Need Resolved
Lightning Arresting Good Need Resolved Fire Lane Access Referred Tank Level Activated Referred
Equip Height • Good Need Resolved Foam Lines Referred Pit Fencing Referred
Accessible ESD Referred Auto Safety Valve Referred
Inspection Comments
Wellhead sign needs updated to current Operator and phone number. Recommend adjust pressure to DV controller at sep to 30#or
below. On 5/9/19, RW conducted a follow-up inspection. Operator resolved issues