Loading...
2020.02.10_COD_FollowUp Gas Well Inspection Type 2019 Annual IF Inspections Inspection Cycle 2nd Half DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 11-8-19 Record Active Close Date Padsite Name 16 PARKS UNIT Pad Jurisdiction CoD Re-Inspection Date 12-10-19 Site Address 2400 W.Payne Dr.(Windsor) Padsite Type Multi Well 2nd Follow-up Inspection 1-29-20 Rt 28 Ordinance Reg 2005-223 Rod Weatherby Inspected by Y Inspection Status Open Plat/Site Permit No Plan No Lease Name .RRC Id Aai No. Spud Date _ Impact 1106-0504 GWP06-0023 PARKS UNIT 2H 235551 12133062 4/1/2007 High 1106-0505 GWP06-0023 PARKS UNIT 1H 236682 12133026 2/26/2007 High INSPECTION CHECK LIST Signs/Labels General Location Operator Name • Good Need Resolved Fencing • Good Need Resolved Site Address • Good Need Resolved Entry Gate Locked • Good Need Resolved Well Name • Good Need Resolved Site Surface • Good Need Resolved 24hr.Phone No • Good Need Resolved Stains Good Need • Resolved RRC&Api No • Good Need Resolved Trash/Debris • Good Need Resolved No Smoking • Good Need Resolved Weeds/Brush Good • Need Resolved Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved Wellhead Sign • Good Need Resolved Site Lighting • Good Need Resolved Tank Battery • Good Need Resolved Landscaping • Good Need Resolved Storage Tank Labels • Good Need Resolved Erosion Control • Good Need Resolved Facility Equipment Miscellaneous Wellhead Paint • Good Need Resolved Electric Lines Safe • Good Need Resolved Wellhead Leaks Good Need • Resolved Pipeline Markers • Good Need Resolved Tank Battery Paint • Good Need Resolved Layout per Site Plan • Good Need Resolved Tank Battery Leaks Good • Need Resolved I Tank Integrity Good • Need Resolved No Wells Approved Db Level @ Inspection Containment Integrity • Good Need Resolved COD Comments-3rd Party Inspections Drip Pots@ Load • Good Need Resolved Lightning Arresting • Good Need Resolved Mgs Inspections 11/19. COD follow-up 12/10/19- Equip Height • Good Need Resolved Not Resolved, COD followup 1/29/20- Issues regarding DV controllers and regulators not Inspection Comments DV Controllers at Compressor venting needs repair. DV Controllers,Regulators,P tt at Separators venting needs repair(red flag)-Weed control needed. Tank 1 has holes in top of tank needs repair. . On,11/8/19,RW inspected well.All inspection items were documented on the Inspection Checklist and Operator was notified of issues requiring action.No immediate actions were needed. On 12/10/19,RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were not yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted. On 1/29/19,RW conducted a 2nd follow-up inspection of the well site. All items requiring further attention from the Operator were not yet resolved.