Loading...
2020.02.10_COD_FollowUp __—.1111111100 Gas Well Inspection Type 2019 Annual C0F Inspections Inspection Cycle 2nd Half _ DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 11-5-19 Record Active Close Date Padsite Name 55 Cod Airport D Pad Jurisdiction CoD Re-Inspection Date 12-9-19 Site Address 7101 Tom Cole Rd Padsite Type Multi Well Rt 15 2nd Follow-up Inspection 1-29-20 Ordinance Reg 2005-223 Rod Weatherby Inspected by Y Inspection Status Open Plat/Site Permit No Plan No Lease Name _RRC Id Aai No. Spud Date Impact 1106-0509 GWP05-0014 CITY OF DENTON-AIRPORT 3H 217181 12132676 1/15/2006 Low 1106-0510 GWP05-0014 CITY OF DENTON-AIRPORT 5H 252630 12133433 2/11/2009 Low 1106-0511 GWP05-0014 CITY OF DENTON-AIRPORT 6H 252635 12133434 4/16/2009 Low 1106-0512 GWP05-0014 CITY OF DENTON-AIRPORT 11 H 253135 12133438 3/30/2009 Low 1106-0513 GWP05-0014 CITY OF DENTON-AIRPORT 12H 252632 12133451 3/11/2009 Low INSPECTION CHECK LIST Signs/Labels General Location I Operator Name • Good Need Resolved Fencing • Good Need Resolved Site Address • Good Need Resolved Entry Gate Locked • Good Need Resolved Well Name • Good Need Resolved Site Surface • Good Need Resolved 24hr.Phone No • Good Need Resolved Stains • Good Need Resolved RRC&Api No Good Need • Resolved Trash/Debris Good Need • Resolved No Smoking • Good Need Resolved Weeds/Brush • Good Need Resolved Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved Wellhead Sign • Good Need Resolved Site Lighting • Good Need Resolved Tank Battery • Good Need Resolved Landscaping • Good Need Resolved Storage Tank Labels • Good Need Resolved Erosion Control • Good Need Resolved Facility Equipment I Miscellaneous Wellhead Paint • Good Need Resolved Electric Lines Safe • Good Need Resolved Wellhead Leaks • Good Need Resolved Pipeline Markers • Good Need Resolved Tank Battery Paint • Good Need Resolved Layout per Site Plan • Good Need Resolved Tank Battery Leaks Good • Need Resolved Tank Integrity • Good Need Resolved No Wells Approved Db Level @ Inspection Containment Integrity • Good Need Resolved COD Comments-3rd Party Inspections Drip Pots@ Load • Good Need Resolved Lightning Arresting • Good Need Resolved Equip Height • Good Need Resolved Inspection Comments DV controllers need Maintenance. On,11/5/19,RW inspected well.All inspection items were documented on the Inspection Checklist and Operator was notified of issues requiring action.No immediate actions were needed. On 12/9/19,RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were not yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted. On 1/29/19,RW conducted a 2"follow-up inspection of the well site. All items requiring further attention from the Operator were not yet resolved.