Loading...
2020.02.10_COD_FollowUp Gas Well Inspection Type 2019 Annual �oF Inspections Inspection Cycle 2nd Half _ DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 11-8-19 Record Active Close Date Padsite Name 75 Mayday-Lattimore Pad Jurisdiction CoD Re-Inspection Date 12-10-19 Site Address 1522 S I-35 Padsite Type Multi Well Rt 25 2nd Follow-up Inspection 1-29-20 Ordinance Reg 2010-196 Rod Weatherby Inspected by Y Inspection Status Open Plat/Site Permit No Plan No Lease Name _RRC Id Aoi No. Spud Date Impact 1109-0143 GWP10-0015 MAYDAY-LATTI MORE GAS UNIT I 264186 12134126 5/4/2011 High 1201-0467 GWP10-0015 Mayday-Lattimore Gas Unit 2H 267776 12134173 3/29/2012 High 1304-0001 GWP10-0015 Mayday-Mason Unit 3H 273100 12134365 4/27/2013 High 1304-0004 GWP10-0015 Mayday-Mason Unit 4H 274427 12134366 5/15/2013 High 1308-0648 GWP10-0015 Mayday-UNT 5H 275569 12134414 8/29/2013 High INSPECTION CHECK LIST Signs/Labels General Location I Operator Name • Good Need Resolved Fencing • Good Need Resolved Site Address • Good Need Resolved Entry Gate Locked Good • Need Resolved Well Name • Good Need Resolved Site Surface • Good Need Resolved 24hr.Phone No • Good Need Resolved Stains Good • Need Resolved RRC&Api No Good Need • Resolved Trash/Debris Good Need • Resolved No Smoking • Good Need Resolved Weeds/Brush • Good Need Resolved Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved Wellhead Sign • Good Need Resolved Site Lighting • Good Need Resolved Tank Battery • Good Need Resolved Landscaping • Good Need Resolved Storage Tank Labels Good Need • Resolved Erosion Control • Good Need Resolved Facility Equipment I Miscellaneous I Wellhead Paint Good Need • Resolved Electric Lines Safe • Good Need Resolved Wellhead Leaks Good Need • Resolved Pipeline Markers • Good Need Resolved Tank Battery Paint • Good Need Resolved Layout per Site Plan • Good Need Resolved Tank Battery Leaks Good • Need Resolved Tank Integrity Good Need • Resolved No Wells Approved Db Level @ Inspection Containment Integrity Good • Need Resolved COD Comments-3rd Party Inspections Drip Pots@ Load • Good Need Resolved Lightning Arresting • Good Need Resolved Mgs Inspections 11/19. COD follow-up 12/10/19- Equip Height • Good Need Resolved Not Resolved, COD followup 1/29/20- Issues regarding DV controllers not resolved. Inspection Comments DV Controllers venting needs repair(red flag). Oil stains need remediation Containment has holes need repair. Gates around equipment need repair and locked. On 12/10/19,RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were not yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted. On 1/29/19,RW conducted a 2"d follow-up inspection of the well site. All items requiring further attention from the Operator were not yet resolved.