2020.02.25_COD_FollowUp Gas Well Inspection Type 2019 Annual
IF Inspections Inspection Cycle 2nd Half
DENTOR
24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 11-14-19
Record Active Padsite Name 118 ACME BRICK"B" 1 Close Date
Jurisdiction CoD Re-Inspection Date 12-30-19
Site Address 163 N. 135
Padsite Type Single Well Rt 56 2nd Follow-up Inspection 1-30-20
Ordinance Reg 2002-040 Rod Weatherby Inspected by Y Inspection Status Open
Plat/Site
Permit No _ Plan No Lease Name .RRC Id Ali No. Spud Date Impact
1108-0055 GWP02-0013 ACME BRICK"B" 1 202203 12132298 4/26/2004 Moderate
INSPECTION CHECK LIST
Signs/Labels General Location
Operator Name • Good Need Resolved Fencing • Good Need Resolved ,
Site Address • Good Need Resolved Entry Gate Locked • Good Need Resolved
Well Name • Good Need Resolved Site Surface • Good Need Resolved
24hr.Phone No • Good Need Resolved Stains • Good Need Resolved
RRC&Api No • Good Need Resolved Trash/Debris • Good Need Resolved
No Smoking • Good Need Resolved Weeds/Brush Good • Need Resolved
Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved
Wellhead Sign • Good Need Resolved Site Lighting • Good Need Resolved
Tank Battery Good Need • Resolved
Landscaping • Good Need Resolved
Storage Tank Labels • Good Need Resolved Erosion Control • Good Need Resolved
Facility Equipment Miscellaneous
Wellhead Paint • Good Need Resolved Electric Lines Safe • Good Need Resolved
Wellhead Leaks • Good Need Resolved Pipeline Markers • Good Need Resolved
Tank Battery Paint • Good Need Resolved
Layout per Site Plan • Good Need Resolved
Tank Battery Leaks • Good Need Resolved
Tank Integrity • Good Need Resolved No Wells Approved Db Level @ Inspection
Containment Integrity • Good Need Resolved COD Comments-3rd Party Inspections
Drip Pots@ Load • Good Need Resolved
Lightning Arresting • Good Need Resolved
Equip Height • Good Need Resolved
Inspection Comments
Weed control needed.
On,11/14/19,RW inspected well.All inspection items were documented on the Inspection Checklist.Any item observed that requires further attention was
forwarded to the Operator for resolution.On 12/30/19,RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator
were not yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted. On 1/30/19,RW conducted a 2"d follow-up inspection of
the well site. All items requiring further attention from the Operator were not yet resolved