Loading...
2020.02.25_COD_FollowUp Gas Well Inspection Type 2019 Annual IF Inspections Inspection Cycle 2nd Half DENTOR 24hr Phone 855-820-6008 Well Operator Eagleridge Inspection Date 11-14-19 Record Active Padsite Name 118 ACME BRICK"B" 1 Close Date Jurisdiction CoD Re-Inspection Date 12-30-19 Site Address 163 N. 135 Padsite Type Single Well Rt 56 2nd Follow-up Inspection 1-30-20 Ordinance Reg 2002-040 Rod Weatherby Inspected by Y Inspection Status Open Plat/Site Permit No _ Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1108-0055 GWP02-0013 ACME BRICK"B" 1 202203 12132298 4/26/2004 Moderate INSPECTION CHECK LIST Signs/Labels General Location Operator Name • Good Need Resolved Fencing • Good Need Resolved , Site Address • Good Need Resolved Entry Gate Locked • Good Need Resolved Well Name • Good Need Resolved Site Surface • Good Need Resolved 24hr.Phone No • Good Need Resolved Stains • Good Need Resolved RRC&Api No • Good Need Resolved Trash/Debris • Good Need Resolved No Smoking • Good Need Resolved Weeds/Brush Good • Need Resolved Reflective/Lighting • Good Need Resolved Oders/Fumes/Dust • Good Need Resolved Wellhead Sign • Good Need Resolved Site Lighting • Good Need Resolved Tank Battery Good Need • Resolved Landscaping • Good Need Resolved Storage Tank Labels • Good Need Resolved Erosion Control • Good Need Resolved Facility Equipment Miscellaneous Wellhead Paint • Good Need Resolved Electric Lines Safe • Good Need Resolved Wellhead Leaks • Good Need Resolved Pipeline Markers • Good Need Resolved Tank Battery Paint • Good Need Resolved Layout per Site Plan • Good Need Resolved Tank Battery Leaks • Good Need Resolved Tank Integrity • Good Need Resolved No Wells Approved Db Level @ Inspection Containment Integrity • Good Need Resolved COD Comments-3rd Party Inspections Drip Pots@ Load • Good Need Resolved Lightning Arresting • Good Need Resolved Equip Height • Good Need Resolved Inspection Comments Weed control needed. On,11/14/19,RW inspected well.All inspection items were documented on the Inspection Checklist.Any item observed that requires further attention was forwarded to the Operator for resolution.On 12/30/19,RW conducted a follow-up inspection of the well site.All items requiring further attention from the Operator were not yet resolved.The Operator was contacted and/or another follow-up inspection will be conducted. On 1/30/19,RW conducted a 2"d follow-up inspection of the well site. All items requiring further attention from the Operator were not yet resolved