Loading...
2020.04.22_COD_Inspection _.,,,,oloo Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-15-20 Record Close Date 4-15-20 Active Padsite Name 45 Bradford Pad 2 Jurisdiction COD Re-Inspection Date 4-15-20 Site Address 1382 Western Blvd Padsite Type Multi Well Rt 01 2nd Re-Inspection Date Ordinance Reg 2004-059 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact 1109-0134 GWP04-0018 JOHN BRADFORD 2H 255665 12133840 12/18/2009 Low 1109-0133 GWP04-0018 JOHN BRADFORD 3H 255442 12133841 11/27/2009 Low I INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve P Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity • Good Need ResolveContainme t • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved 4 Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolvei Markers per Site IInspection Comments #2 Separator DV controller blowing, needs repair. Notified operator and operator advised repair would be made within one hour. RW returned back to wellsite approximately 1 hour later, Operator was on location and repairs to DV controller were resolved. I Inspections Conducted by Third Party and COD Follow Up I Third Party Inspection Date: COD Follow Up Date: