2020.04.22_COD_Inspection _.,,,,oloo Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-15-20
Record Close Date 4-15-20
Active Padsite Name 45 Bradford Pad 2
Jurisdiction COD Re-Inspection Date 4-15-20
Site Address 1382 Western Blvd
Padsite Type Multi Well Rt 01 2nd Re-Inspection Date
Ordinance Reg 2004-059 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact
1109-0134 GWP04-0018 JOHN BRADFORD 2H 255665 12133840 12/18/2009 Low
1109-0133 GWP04-0018 JOHN BRADFORD 3H 255442 12133841 11/27/2009 Low
I INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
P Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve
RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity • Good Need ResolveContainme t • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved 4 Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolvei
Markers per Site
IInspection Comments
#2 Separator DV controller blowing, needs repair. Notified operator and operator advised repair would be made within one hour. RW
returned back to wellsite approximately 1 hour later, Operator was on location and repairs to DV controller were resolved.
I Inspections Conducted by Third Party and COD Follow Up I
Third Party Inspection Date: COD Follow Up Date: