Loading...
2020.04.22_COD_Inspection __1M000 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone Inspection Date 4-20-20 817-841-8885 Well Operator Bedrock Record Active Padsite Name 46 Selwyn School Pad Close Date 4-20-20 Jurisdiction COD Re-Inspection Date Site Address 3773 W.University Padsite Type Multi Pad Rt 01 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact 1109-0306 GWP03-0034 SELWYN SCHOOL 2 193991 12131346 9/16/2002 Low 1109-0307 GWP03-0034 SELWYN SCHOOL 2H 212298 12132183 1/28/2004 Low I INSPECTION CHECK LIST Signs/Labels I General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve P Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity • Good Need ResolveContainme t • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve o Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolvei Markers per Site IInspection Comments Compliant-Recommend weed touch-up inside fence line around tank battery Inspections Conducted by Third Party and COD Follow Up I Third Party Inspection Date: 3-26-20 COD Follow Up Date: 4-20-20 Leaks:Separator B actuator The DV controller issue was addressed • U - • •• • •p•,• Q UM Ly • o800-W F ;e• O AZ. 0 �"arrev'c""n F•am�res �aob"• Ma PaT QPa FA