Loading...
2020.04.22_COD_Inspection _.,,,,0100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone Inspection Date 4-21-20 817-841-8885 Well Operator Bedrock Record Close Date 4-21-20 Active Padsite Name 58 GLOSSER 3/5H Pad Jurisdiction COD Lnc Re-Inspection Date Site Address 7476 Tom Cole Rd. Padsite Type Multi Well Rt 15 2nd Re-Inspection Date Ordinance Reg 2005-223 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name RRC Id Avi No. Spud Date Impact 1111-0066 GWP07-0007 GLOSSER 5H 237433 12133169 10/18/2007 Moderate 1111-0063 GWP07-0007 GLOSSER 3 191602 12131517 5/6/2002 Moderate I INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve P Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity • Good Need ResolveContainme t • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout Good Need Resolvei Markers per Site IInspection Comments Compliant Inspections Conducted by Third Party and COD Follow Up I Third Party Inspection Date: 3.26-20 COD Follow Up Date: 4-21-20 Corrosion:separator piping Corrosion is not sever and does not appear to effect Lawnd::' pipe integrity-Compliant us---- OAST • A '�� n A-JWy EWV—lt CC — ♦ • .♦ A_ , A _ ♦ Faamums • ` • Up..d a Sa pb g Fbnl • c •♦ '♦♦i• i '� O—W A.S•mp.y Porn t A �• ♦♦♦ y �• T was o,e -(b) ♦ � a OPW.1.