Loading...
2020.05.11_COD_Inspection Gas Well Inspection Type 2020 Annual �oF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-29-20 Record Active Close Date 4-29-20 Padsite Name 92 Biltmore North 2 Jurisdiction CoD Re-Inspection Date Site Address 11503 FM 2449 Padsite Type Multi Well Rt 14 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact 1108-0315 GWP03-0020 BILTMORE 3 202236 12132091 9/28/2003 Low 1108-0320 GWP03-0020 BILTMORE-B.YARBROUGH(SA) 1 H 263683 12133972 5/16/2011 Low 1108-0321 GWP03-0020 BILTMORE-B.YARBROUGH(SA) 2H 264250 12133973 4/3/2011 Low 1108-0535 GWP03-0020 Biltmore 15H 267514 12134197 11/15/2011 Low 1108-0537 GWP03-0020 Biltmore-B.Yarb-Biltmore(SA)1H 267688 12133970 12/12/2011 Low INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve P Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve P Trash/Debris • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Containment • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve Tank Battery • Good Need Resolves Landscaping • Good Need Resolve Equip Height • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved 5 Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site Inspection Comments Compliant I Inspections Conducted by Third Party and COD Follow Up I Third Party Inspection Date: 4-1-20 COD Follow Up Date: 4-29-20 Corrosion: separator On 4/21/20,Operator r.....A' W Rs.- piping . • advised issue was A resolved. .-:.� Corrosion-compliant Lec 1 end. Awas n o �E ,- ,vy�lYanIXl Pain � Q Pamle