2020.05.11_COD_Inspection Gas Well Inspection Type 2020 Annual
�oF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-29-20
Record Active Close Date 4-29-20
Padsite Name 92 Biltmore North 2
Jurisdiction CoD Re-Inspection Date
Site Address 11503 FM 2449
Padsite Type Multi Well Rt 14 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact
1108-0315 GWP03-0020 BILTMORE 3 202236 12132091 9/28/2003 Low
1108-0320 GWP03-0020 BILTMORE-B.YARBROUGH(SA) 1 H 263683 12133972 5/16/2011 Low
1108-0321 GWP03-0020 BILTMORE-B.YARBROUGH(SA) 2H 264250 12133973 4/3/2011 Low
1108-0535 GWP03-0020 Biltmore 15H 267514 12134197 11/15/2011 Low
1108-0537 GWP03-0020 Biltmore-B.Yarb-Biltmore(SA)1H 267688 12133970 12/12/2011 Low
INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
P Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve
P Trash/Debris • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Containment • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
Tank Battery • Good Need Resolves Landscaping • Good Need Resolve Equip Height • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve
No Wells Approved 5 Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
Inspection Comments
Compliant
I Inspections Conducted by Third Party and COD Follow Up I
Third Party Inspection Date: 4-1-20 COD Follow Up Date: 4-29-20
Corrosion: separator On 4/21/20,Operator
r.....A' W Rs.-
piping . • advised issue was
A resolved.
.-:.� Corrosion-compliant
Lec
1
end.
Awas
n
o �E
,- ,vy�lYanIXl Pain
� Q Pamle