2020.05.11_COD_Inspection __1M000 Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-29-20
Record Active Close Date 4-29-20
Padsite Name 94 Biltmore North 3
Jurisdiction COD Re-Inspection Date
Site Address 11482 H.Lively Rd
Padsite Type Multi Well Rt 12 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact
1108-0316 GWP03-0020 BILTMORE 9H 261155 12133965 2/25/2011 Moderate
1108-0317 GWP03-0020 BILTMORE 10H 260959 12133966 2/8/2011 Moderate
1108-0318 GWP03-0020 BILTMORE 11H 260851 12133967 1/18/2011 Moderate
INSPECTION CHECK LIST
Signs/ Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Entry Gate • Good Need Resolve
Well Name • Good Need Resolves Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve
p Trash/Debris • Good Need Resolve
No Smoking • Good Need Resolve Weeds/Brus • Good Need Resolve Containment • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved 5 Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
Inspection Comments
Compliant
I Inspections Conducted by Third Party and COD Follow Up I
Third Party Inspection Date: 4-1-20 COD Follow Up Date: 4-29-20
Leaks: Separator C On 4/21/20,Operator
actuator; Corrosion: advised issue was resolved
separator piping
COD-Separator C
Legend: actuator and DV controller
,o, was tested-compliant
S.P.
• Ancn•ry E Wpm•rt corrosion-compliant
• f Up• a ANS• PM9 PoN
•
•■ � Ovna•E A.Sempuq Pohl
Wna D•e -fib)
r�•• _ �� FenmMe 5cre•nrg plgmwnt
• • • • O Demon C—.v P>CM•
• 5 • 1•• OOeen••m PST
aPW*