Loading...
2020.05.11_COD_FollowUp _.,,,,0100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone Inspection Date 4-21-20 817-841-8885 Well Operator Bedrock Record Close Date 5-5-20 Active Padsite Name 1 Little Brook Estates D 4 Jurisdiction COD Lnc Re-Inspection Date 5-5-20 Site Address 3076 Lovers Ln. Padsite Type Single Well Rt 10 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1111-0076 No Record Little Brook Estates D 4 196321 12131731 12/1/2002 Moderate INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments I Thief Hatch venting needs maintenance. On 5/5/20, RW conducted a follow-up inspection of the well site.Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-25-20 COD Follow Up Date: 4-21-20 Leaks:AST B enardo valve 4/21/20 Enardo Valve found working properly i end•Q�. ,�•• El SepaaW �• C_I AST +a Ak� �_ Ancinay Pa-re A ; 1 f• Up• s plmy Pum L_ ... oey.,ayim ar sa M,P_ a'—'_A a� � �-WnO Direcfon lml .. Fancelire Scremiig Ngnmenl fY• �COxrva4m Pam 1..� OPativle Denton Ga My Pa