Loading...
2020.05.11_COD_FollowUp _.,,,,0100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone g Inspection Date 4-15-20 888-225-8141 Well Operator sage Record Active Padsite Name 14 PAYNE 1 Close Date 5-1-20 Jurisdiction COD Re-Inspection Date 5-1-20 Site Address 4606 N. I-35 Padsite Type Single Well Rt 01 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1109-0157 GWP03-0005 PAYNE 1 206875 12131878 5/16/2003 High INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments I Could not inspect equipment inside Tank battery due to High Water inside containment. Advised Operator. On 4/16/20, Operator advised water was removed. On 4/16/20 completed initial inspection. Findings: Vertical Separator(B)DV controller venting (red flagged). Thief hatch venting needs repair. On 5/1/20, RW conducted a follow-up inspection of the well site.Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-26-20 COD Follow Up Date: 5-1-20 Leaks:AST A thief hatch Issues addressed Loa": . I♦ O F—fn.p.raf • A NN A ♦ • ♦, ♦♦ � AST ♦ ♦ ♦ M.cYry E♦yIMI ♦ •♦• ♦� � 11i+�OM S.p.V PoM • A ♦ 1 ♦♦ m Daari.N M Srrprq Pohl ♦ 6 • ♦ , A , O SaM 5.^gAnO PoM ♦ .I ♦♦ .1� � [arm Uw ` � Nre{rOmlbl ' . ...0— Snrn^O Apvwn czj W