24hr Phone g Inspection Date 4-15-20
888-225-8141 Well Operator sage
Record Close Date 5-8-20
Active Padsite Name 28 Mitchell-Baldinger Pad
Jurisdiction COD Re-Inspection Date 5-8-20
Site Address 2672 Thomas J Egan Rd.
Padsite Type Multi Well Rt 02 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact
1107-0356 GWP02-0001 MITCHELL,GERALD 2 189372 12131261 3/3/2002 Moderate
1108-0693 GWP02-0001 MITCHELL-BALDINGER 3H 264324 12134107 10/26/2011 Moderate
1108-0707 GWP02-0001 MITCHELL-BALDINGER 4H 264852 12134108 11/12/2011 Moderate
INSPECTION CHECK LIST
Signs/ Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve+ Wellhead Leaks Good Need • Resolve
Entry Gate • Good Need Resolve
Well Name • Good Need Resolve+ Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolve+ Stains • Good Need Resolve T Battery Leaks Good Need • Resolve
RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve
p Trash/Debris • Good Need Resolve
No Smoking • Good Need Resolve+ Weeds/Brus • Good Need Resolve Containment • Good Need Resolve
Reflective • Good Need Resolve+ Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolve+ Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve+ Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolve+ Erosion • Good Need Resolve INO Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolve+ Layout • Good Need Resolves
Markers per Site
Inspection Comments
M.Baldinger#4 both casing valves venting at stem packing. DV controllers at all three separators venting. On 5/8/20, RW conducted a
follow-up inspection of the well site. Operator resolved all items requiring further attention.
I Inspections Conducted by Third Party and COD Follow Up I
Third Party Inspection Date: 3-25-20 COD Follow Up Date: 5-8-20
Wellhead:Compliant, TB: Sep C actuator was found
Leaks:Separator C working properly, Enardo
actuator,AST C enardo Lgnd: valves were found working
valve,AST D enardo valve, A ,N.. properly. During the COD
and AST E enardo valve; n sep"W, Inspection,DV controllers
Corrosion:AST piping - were found venting and
'•• —� AST will be re-inspected
�}.� AmftrYEwW... 5/15/20. Corrosion does
F. Lj� not appear to effect pipe
• r• ® uv«mn.SmV"P.• integrity-Compliant.
• m Dower WAoS.-pbyP—t On 5/8/20 RW was
v advised by operator DV
• T '.. wee D..2_Dul
•.�� • controllers were repaired.
F a,-a+rcshK-+cAw�+ RW re-inspected and
,--'OD/pv~P..+ tested DV controllers and
O Pads" found working properly