Loading...
2020.05.11_COD_FollowUp _.,,,,0100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone g Inspection Date 4-16-20 888-225-8141 Well Operator sage Record Active Close Date 5-1-20 Padsite Name 35 Nobles Charitable Trust 1 Jurisdiction COD Re-Inspection Date 5-1-20 Site Address 7252 Jim Christal Rd. Padsite Type Single Well Rt 03 2nd Re-Inspection Date Ordinance Reg 2004-059 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Aai No. Spud Date Impact 1109-0149 GWP04-0025 NOBLES CHARITABLE TRUST 1 209345 12132472 1/28/2005 Moderate INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks Good Need • Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments I Plunger Catcher @ Lubricator leaking liquid at connection. @Compressor 2nd stage separator- DV Controller venting. @Separator(A)- DV Controller venting. Thief hatch (A)venting. On 5/1/20, RW conducted a follow-up inspection of the well site. Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-25-20 COD Follow Up Date: 5-1-20 Leaks:Separator A actuator Issues resolved and AST A thief hatch �i Lecud: I•'A1 1i 1 • ••. , AST A • ••�•, • • '_'' cmwnawo• • re� ♦•• • �•�• ® Upp M SampMg Pp�V mDwnw A S•m P.. M Wr4 Dram im) F__So•• V Ai9_ .r•s ter.�•r+.-.. �..� ..�OMavOan P•0 O P•O•b •