2020.05.11_COD_FollowUp Gas Well Inspection Type 2020 Annual
�oF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone Inspection Date 4-21-20
817-841-8885 Well Operator Bedrock
Record Active Padsite Name 53 GLOSSER 1 Close Date 5-8-20
Jurisdiction CoD Lnc Re-Inspection Date 5-8-20
Site Address 7422 Tom Cole Rd.
Padsite Type Single Well Rt 17 2nd Re-Inspection Date
Ordinance Reg pre-2001 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact
1111-0060 GWP07-0007 GLOSSER 1 189103 12131276 11/28/2001 Low
INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve
RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve
p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels Good Need • Resolves Erosion • Good Need Resolve INO Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
IInspection Comments I
Storage Tank(A) needs Hazcom Label, Thief Hatch Found open appears to need maintenance. Separator(A) Dv Controller venting
needs repair. On 5/8/20, RW conducted a follow-up inspection of the well site. Operator resolved all items requiring further attention.
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 3-26-20 COD Follow Up Date:
Leaks:Separator A actuator
and AST A thief hatch
•
A
tq • Q w1
• El ftpmw
• q •
p AST
♦ B
♦ �•• ♦••• � � Anflry Eppm•nl
•• • `' • f oYn L.es
•
Oftd�