Loading...
2020.05.11_COD_FollowUp _.,,,,0100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone 270-991-2847 Well Operator Krocan Inspection Date 4-21-20 Record Active Padsite Name 54 BECKMAN 3 Close Date 5-8-20 Jurisdiction COD Lnc Re-Inspection Date 5-8-20 Site Address 7202 Tom Cole Rd Padsite Type Single Well Rt 01 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1108-0288 GWP02-0035 BECKMAN 3 197237 12131813 2/17/2003 Low MECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments I Stock Tank(A)The liquid trap surrounding the thief hatch has open 1/2 connection needs to be plugged. On 5/8/20, RW conducted a follow-up inspection of the well site. Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-31-20 COD Follow Up Date: 4-21-20 Corrosion: separator Corrosion does not piping appear to effect pipe • integrity-Compliant :s T ❑ s•.•� A O AST • `I • -J'` O aIMOn COu'lI PucNl