2020.05.11_COD_FollowUp __1M000 Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 4-29-20
Record Active Close Date 5-6-20
Padsite Name 93 Biltmore North 1
Jurisdiction COD Re-Inspection Date 5-6-20
Site Address 11482 H.Lively Rd
Padsite Type Multi Well Rt 12 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact
1108-0298 GWP02-0012 BILTMORE 1 192126 12131462 6/25/2002 Low
1108-0467 No Record Biltmore 14H 267498 12133969 1/5/2012 Low
1108-0472 No Record Biltmore 13H 267501 12133971 1/25/2012 Low
INSPECTION CHECK LIST
Signs/ Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks Good Need • Resolve
Entry Gate • Good Need Resolve
Well Name • Good Need Resolves Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve
p Trash/Debris • Good Need Resolve
No Smoking • Good Need Resolve Weeds/Brus • Good Need Resolve Containment • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve Db Level
o Wells Approved 3.?
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
Inspection Comments
At Well#14 (C),Tubing connector at regulator leaking (red flagged). On 5/6/20, RW conducted a follow-up inspection of the well site.
Operator resolved all items requiring further attention.
I Inspections Conducted by Third Party and COD Follow Up I
Third Party Inspection Date: 4-1-20 COD Follow Up Date: 4-29-20
Corrosion: Ancillary B On 4/21/20,Operator
r' advised issue was
■ A ■
• - resolved.
■ ■ d
■
C ■
Corrosion-Compliant
■
Logend:
VON
❑ 5■p■■oor
Q Atwllry EOiYpn■■
■ ����OMM•M■■GaM
A O