2020.05.26_COD_Inspection __1M000 Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone Inspection Date 5-4-20
866-535-6836 Well Operator XTO
Record Close Date 5-15-20
Active Padsite Name 154 FERGASON 1
Jurisdiction COD Lnc Re-Inspection Date 5-15-20
Site Address 7997 W.University
Padsite Type Single Well Rt 02 2nd Re-Inspection Date
Ordinance Reg 2004-059 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact
1108-0611 GWP04-0012 FERGASON 1 216132 12132789 2/17/2006 Moderate
INSPECTION CHECK
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks Good Need • Resolve
Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains Good Need • Resolve T Battery Leaks Good Need • Resolve
RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve
p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
IInspection Comments I
Stains around compressor needs remediation. At WH-Casing Valve stem packing leaking needs repair(red flagged).At Sep-DV
controller venting needs repair(red flagged)On 5/15/20, RW conducted a follow-up inspection of the well site.Operator resolved all
items requiring further attention.
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 3-31-20 COD Follow Up Date: 5-15-20
Leaks: Separator A Issues resolved
actuator; Corrosion: Legend.