2020.06.12_COD_FollowUp i_ Gas Well Inspection Type 2020 Annual
Y Inspections Inspection Cycle 1st Half
_ DENTON
24hr Phone g g Inspection Date 5-19-20
855-820-6008 Well Operator Ea lerid e
Record Close Date 6-4-20
Active Padsite Name 66 MAYDAY-UNT Pad
Jurisdiction CoD Re-Inspection Date 6-4-20
Site Address 1201 S.Bonnie Brae St.
Padsite Type Multi Well Rt 30 2nd Re-Inspection Date
Ordinance Reg 2004-059 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Api No. Spud Date Impact
1109-0255 GWP10-0019 MAYDAY-LINT 3H 216209 12132345 6/25/2004 Moderate
1109-0270 GWP10-0019 MAYDAY-UNT 4H 229906 12132307 5/22/2004 Moderate
INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
P Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity Good Need • Resolve
Containment • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers Per Site
Inspection Comments I
Tank B seep leaking needs repair. On 6/4/20, RW&AP conducted a followup reinspection. Operator addressed issues
I Inspections Conducted by Third Party and COD Follow Up I
Third Party Inspection Date: 4-6-20 COD Follow Up Date: 5-19-20
Corrosion: AST piping Issue compliant
'y
, .....m
• ■ ._,...
tA \ • ...i...