Loading...
2020.06.12_COD_FollowUp i_ Gas Well Inspection Type 2020 Annual Y Inspections Inspection Cycle 1st Half _ DENTON 24hr Phone g g Inspection Date 5-19-20 855-820-6008 Well Operator Ea lerid e Record Close Date 6-4-20 Active Padsite Name 66 MAYDAY-UNT Pad Jurisdiction CoD Re-Inspection Date 6-4-20 Site Address 1201 S.Bonnie Brae St. Padsite Type Multi Well Rt 30 2nd Re-Inspection Date Ordinance Reg 2004-059 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Api No. Spud Date Impact 1109-0255 GWP10-0019 MAYDAY-LINT 3H 216209 12132345 6/25/2004 Moderate 1109-0270 GWP10-0019 MAYDAY-UNT 4H 229906 12132307 5/22/2004 Moderate INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve P Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/Api# • Good Need Resolves Trash/Debris • Good Need Resolve Tank Integrity Good Need • Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers Per Site Inspection Comments I Tank B seep leaking needs repair. On 6/4/20, RW&AP conducted a followup reinspection. Operator addressed issues I Inspections Conducted by Third Party and COD Follow Up I Third Party Inspection Date: 4-6-20 COD Follow Up Date: 5-19-20 Corrosion: AST piping Issue compliant 'y , .....m • ■ ._,... tA \ • ...i...