Loading...
2020.06.12_COD_FollowUp i_ Gas Well Inspection Type 2020 Annual Y Inspections Inspection Cycle 1st Half _ DENTON 24hr Phone g g Inspection Date 5-19-20 855-820-6008 Well Operator Ea lerid e Record Close Date 6-10-20 Active Padsite Name 64 Tetra Pak 1 Jurisdiction CoD Re-Inspection Date 6-19-20 Site Address 3003 Airport Rd. Padsite Type Single Well Rt 23 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Api No. Spud Date Impact 1109-0266 GWP02-0028 Tetra Pak 1 194037 12131639 9/8/2002 Moderate INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks Good Need • Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus Good Need • Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site Inspection Comments Weed control needed. Tubing connector at wellhead leaking (red flag). Tank A drain hole at thief hatch needs to be plugged. On 6/10/20, RW conducted a follow-up inspection of the well site.Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 4-6-20 COD Follow Up Date: 6-10-20 Leaks:AST A thief Issue resolved hatch; Corrosion: separator piping "Now Lemnd; A 'a• • 7 • . &ST 7 ��Ijj w..a w s.1o`q wn A • •: `A .. N � r. �wuW Srrwn.pMW.e..