2020.06.16_COD_FollowUp __1M000 Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone g g Inspection Date 5-14-20
855-820-6008 Well Operator Ea lerid e
Record Active Padsite Name 33 SMITH-YORLUM UNIT Close Date 6-15-20
Jurisdiction COD Re-Inspection Date 6-15-20
Site Address 1757 Old Dominion Rd.
Padsite Type Single Well Rt 10 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact
1109-0250 GWP02-0015 SMITH-YORLUM UNIT 1H 194032 12131519 7/10/2002 Moderate
IMPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve
p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus Good Need • Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
IInspection Comments I
At Compressor: 3rd Stage Scrubber DV Controller venting needs repair(red flag), Pop-off venting needs repair(red flag). Tank(B)
Thief Hatch venting needs repair(red flag). Weed Control needed. On 6/4/20, RW&AP, conducted a spot inspection. Thief Hatch (Tank
B)was venting. All other issues were resolved. On 6/15/20, RW and AP conducted a follow-up inspection of the well site with Jeff
Smith attending. Operator resolved all items requiring further attention
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 4-6-20 COD Follow Up Date:
Leaks:AST B thief
hatch; Corrosion:AST ••A
piping •!
■ I
A 11' YOr•vr
f
l R O A■t
f♦•♦• Q MrYry Ewa•w
1Y1 ■ q�
8 A • ♦
4.. ■ � �Dor.wrY M 5/WN ib✓t
♦ ® 1 un l+w
C
. ♦ T.'MM hWC�l01
• tl f�1u111.9a••nry Alalrwt
`_■O■MMT o••
C3pw—