Loading...
2020.06.16_COD_FollowUp __1M000 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone g g Inspection Date 5-14-20 855-820-6008 Well Operator Ea lerid e Record Active Padsite Name 41 SMITH-YORLUM UNIT Close Date 6-15-20 Jurisdiction COD Re-Inspection Date 6-15-20 Site Address 754 N.Masch Branch Padsite Type Single Well Rt 07 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1109-0281 GWP02-0039 SMITH-YORLUM UNIT 4H 194278 12131643 1/14/2003 High INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve lNo Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments Tank(A)thief hatch latch frozen in the unlatched position needs repair(red flag). On 6/10/20, RW&AP conducted a spot inspection Thief hatch still needs repair. On 6/15/20, RW and AP conducted a follow-up inspection. Operator resolved all issues Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 4-6-20 COD Follow Up Date: 5-14-20 Leaks: Well A kimray issues resolved valve and Separator A III DV controller -0■• p . Z4�- p«. 0-1 ®11{wC45rprQ bV ®UMwV46rly MN ©EuS. "P. A . ' .. .. ■. A I B,I A 8 w..o.d...c • ... . .. .. . %'116%161. -616. . .. ■ �h«.�r o..