Loading...
2020.06.18_COD_FollowUp Gas Well Inspection Type 2020 Annual �oF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone g g Inspection Date 5-19-20 855-820-6008 Well Operator Ea lerid e Record Active Padsite Name 69 HUDSON 1 Close Date 6-17-20 Jurisdiction CoD Re-Inspection Date 6-17-20 Site Address 2253 Westcourt Rd Padsite Type Single Well Rt 18 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1108-0646 GWP02-0033 HUDSON 1 197243 12131784 1/12/2003 Moderate INSPECTION CHECK Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks Good Need • Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site Good Need • Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus Good Need • Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments I WellHead- LMV leaking at stem packing needs repair(red flag). Sep A Dv Controller venting needs repair(red flag). Weed control needed . At entry to pad, site has pools of water with ruts needs to be repaired. . On 6/17/20, RW conducted a follow-up inspection of the well site. Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 4-6-20 COD Follow Up Date: 5-19-20 Leaks:AST A enardo Enardo Valve working valve properly uwnd: Qwe. �• ❑ S.P..v •. : . -•• 0 AS' up n M S.mp.ro Pp ® o.wie.a ar Sernpk g Pont ': wn•are vm ro� - ranQtnesn.e-roaomK.n � �OprrvaOm PeT rW PeOeM