Loading...
2020.06.18_COD_FollowUp _.,,,,0100 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone g g Inspection Date 5-19-20 855-820-6008 Well Operator Ea lerid e Record Close Date 6-17-20 Active Padsite Name 72 Springside-A 4 Jurisdiction COD Lnc Re-Inspection Date 6-17-20 Site Address 5242 Dakota Ln Padsite Type Single Well Rt 22 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1109-0265 No Record Springside-A 4 202469 12132251 3/26/2004 High INSPECTION CHECKLIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks Good Need • Resolve Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus Good Need • Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion Good Need Resolve lNo Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments Wellhead Casing valve leaking at stem packing needs repair(red flag) Weed control needed. . On 6/17/20, RW conducted a follow- up inspection of the well site. Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 4-6-20 COD Follow Up Date: 5-19-20 Compliant .... ©—Q !!�. a • A LA_ � Sapseta • • .......• AST • iurn lnw © 'Jpwnd Ar Samplrg P—t • Dp.f 4 All Sar Vi g P..1 QS—na Soave g Pohl M d Deck-(b) • �. -.•OOrrvan PaN O pwaft