Loading...
2020.06.23_COD_FollowUp i_ Gas Well Inspection Type 2020 Annual Y Inspections Inspection Cycle 1st Half _ DENTON 24hr Phone g g Inspection Date 5-21-20 855-820-6008 Well Operator Ea lerid e Record Close Date 6-23-20 Active Padsite Name 122 RAGLE UNIT 1 Jurisdiction CoD Re-Inspection Date 6-19-20 Site Address 412 E.Mission St. Padsite Type Single Well Rt 53 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Api No. Spud Date Imr)act 1109-0355 GWP02-0034 RAGLE UNIT 1 198493 12131882 7/13/2003 High INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve) Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve) Entry Gate Good Need • Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolve) Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolve) Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve) Tank Integrity • Good Need Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolve) Weeds/Brus Good Need • Resolve Reflective • Good Need Resolve) Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolve) Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve) Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolve) Erosion • Good Need Resolve No Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolve) Layout • Good Need Resolve) Markers per Site Inspection Comments Weed control needed. Chain and lock missing at entrance gate. On 6/19/20 AP and RW conducted a spot inspection and noticed that a gate remained unsecured. On 6/22/20,the operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 4-7-20 COD Follow Up Date: Compliant O �VM • A 1 A O AV A Q MWy Ewp� • FoamL— A.Sampnq Pont Qn S.,*"Part a.f . Vr Drc Ibl • - F.nceM Speenry Alg—1 O PaOPM