2020.06.25_COD_FollowUp i_ Gas Well Inspection Type 2020 Annual
Y Inspections Inspection Cycle 1st Half
_ DENTON
24hr Phone g g Inspection Date 5-22-20
855-820-6008 Well Operator Ea lerid e
Record Close Date 6-24-20
Active Padsite Name 120 ACME BRICK D UNIT
Jurisdiction CoD Re-Inspection Date 6-24-20
Site Address 163 N. 135
Padsite Type Single Well Rt 54 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Api No. Spud Date Impact
1108-0059 GWP02-0013 ACME BRICK D UNIT 2H 198918 12131976 6/9/2003 Moderate
INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve
p� Trash/Debris • Good Need Resolve Containment Good Need • Resolve
No Smoking • Good Need Resolves Weeds/Brus Good Need • Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
Inspection Comments
Weed control needed. Chem tank containment is full of liquid needs to be emptied. Containment liner has holes that were previously
repaired and has separated from the liner and not sealing. On 6-24-20,AP conducted a follow-up inspection of the well site with Jeff
Smith attending. Operator resolved all issues requiring further attention.
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 4-7-20 COD Follow Up Date: 5-22-20
Compliant
A w+
. ,•�, , o I.Pun,
OAST
� � Anc+rr Ep.pm•r,
A • Fo floe•
up—d A 5—PMq Poti
a /...1
/ A ; DP+n•.ma An 5•mPLnq Pohl•�. .�:w.a on.ca.M)
I�w' .. Fmo•�.sc...�yag,,.w�
1IWW •• ;--;OOae,a Pam
Y — O PaO.••