Loading...
2020.06.25_COD_FollowUp i_ Gas Well Inspection Type 2020 Annual Y Inspections Inspection Cycle 1st Half _ DENTON 24hr Phone g g Inspection Date 5-22-20 855-820-6008 Well Operator Ea lerid e Record Close Date 6-24-20 Active Padsite Name 118 ACME BRICK"B" 1 Jurisdiction CoD Re-Inspection Date 6-24-20 Site Address 163 N. 135 Padsite Type Single Well Rt 56 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Api No. Spud Date Impact 1108-0055 GWP02-0013 ACME BRICK"B" 1 202203 12132298 4/26/2004 Moderate INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus Good Need • Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site Inspection Comments Entrance Sign needs to be re-posted. Weed control needed. On 6-24-20,AP conducted a follow-up inspection of the well site with Jeff Smith attending. Operator resolved all issues requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 4-7-20 COD Follow Up Date: 5-22-20 Compliant Lownd: n • •• . 5.prala AST -... A.�iwy eaUPm•v • Fo•m Lnvs UCw^U M SYnp.p PM .• A � DawwnC h!5ynyry Ppn, ♦ '♦ • � WM DncEm(b) ♦ A • • •♦ .. Fan4lro Scr•lnrp NI-t • A N• •♦ OExrvs.m PeT ••• O PMM!