Loading...
2020.06.25_COD_FollowUp i_ Gas Well Inspection Type 2020 Annual Y Inspections Inspection Cycle 1st Half _ DENTON 24hr Phone g g Inspection Date 5-21-20 855-820-6008 Well Operator Ea lerid e Record Active Close Date 6-24-20 Padsite Name 144 GUYER 1 Pad Jurisdiction CoD Re-Inspection Date 6-22-20 Site Address 7491 S.Teasley Padsite Type Multi Well Rt 60 2nd Re-Inspection Date Ordinance Reg 2005-223 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Api No. Spud Date Impact 1108-0637 AGWP07 GUYER 3 239184 12133149 7/6/2007 High 1108-0639 AGWP07 GUYER 4 239193 12133153 8/8/2007 High 1108-0640 GWP04-0007 GUYER,J.H. 1 215832 12132294 4/23/2004 High INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve) Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve) Wellhead Leaks Good Need • Resolve Entry Gate • Good Need Resolve Well Name • Good Need Resolve) Site Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolve) Stains • Good Need Resolve T Battery Leaks Good Need • Resolve RRC/A i# • Good Need Resolve) Tank Integrity • Good Need Resolve p Trash/Debris • Good Need Resolve No Smoking • Good Need Resolve) Weeds/Brus Good Need • Resolve Containment • Good Need Resolve Reflective • Good Need Resolve) Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolve) Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve) Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolve) Erosion • Good Need Resolve No Wells Approved Db Level Miscellaneous I Electric Lines • Good Need Resolve Pipeline • Good Need Resolve) Layout • Good Need Resolves Markers per Site Inspection Comments Well (A)Wing valve leaking at stem packing,tubing connector leaking (red flagged). Weed control needed. Separator A DV controller venting needs repair(red flag). On 6-22-20,AP conducted a follow-up inspection of the well site with Jeff Smith attending. Operator resolved all issues requiring further attention. I Inspections Conducted by Third Party and COD Follow Up I Third Party Inspection Date: 4-7-20 COD Follow Up Date: 5-21-20 Corrosion: AST A and _ _ Issue compliant B ' i A .. AST - � ^Nif1YyEWProm • foYn Lnsf ® UpvnOa YnWlnp Wn t, '®DownwnO lw Si Pkq pO © $Plld SanpYp vw y YnM D.—I., ...- r .. •� FroNe Sciaennp lugYwM � -�OLfavalan PaN O �ViOMs