6646 - Fiber Optic Cable Installation Services, 1.Pricing SheetExhibit 1 -RFP 6646 - Pricing Sheet for Fiber Optic Installation Services
The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format.
Services Proposal Pricing to include all costs including but not limited to labor, supervision and equipment:
ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
ESTIMATED TOTAL ANNUAL COST
Traffic Operations ITS Fiber Project Phase 1
39
40
Estimated Annual Quantity
5000
50000
1
1
1
1
1
1
1
1
1
1
1
1
1
1
50000
5000
50000
600
20
50
10
25
10
10
300
10000
10000
10000
10000
1
1
1
1
10
5
1
1
1
UOM
FT
FT
Per Splice 12 Fibers
Per Splice 72 Fibers
Per Splice 144 Fibers
EA
EA
Reel
Reel
Per Splice 12 Fibers
Per Splice 72 Fibers
Per Splice 144 Fibers
EA
EA
Reel
Reel
ft
ft
ft
hr
hr
hr
hr
hr
hr
hr
ft
ft
ft
ft
ft
ft
ft
ft
ft
hr
hr
hr
Type of Service Requested
Installation of fiber optic cable on utility poles per DME guidelines. All manufactures requirements for installation of fiber optic cable shall be met.
Installation of fiber optic cable in existing conduit. All manufactures requirements for installation of fiber optic cable shall be met.
ADSS Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations
ADSS Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations
ADSS Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations
ADSS Fiber Cable Prep
ADSS Enclosure Prep
ADSS 72 Fiber Reel Test and Verification . Documentation of every fiber
ADSS 144 Fiber Reel Test and Verification . Documentation of every fiber
Altos Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations
Altos Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations
Altos Fiber Splicing (Traffic supplying Enclosure and all supplies, not equipment) per manufacturers recommendations
Altos Fiber Cable Prep
Altos Enclosure Prep
Altos 72 Fiber Reel Test and Verification . Documentation of every fiber
Altos 144 Fiber Reel Test and Verification . Documentation of every fiber
Installation of Pull Tape in existing conduit
Rodding existing conduit
Installation of Trace wire in existing conduit per Traffic's requirements.
1 man crew to perform small maintinance jobs
1 man crew with Bucket to perform small maintinance jobs
2 man crew to perform small maintinance jobs
2 man crew with bucket to perform small maintinance jobs
3 man crew to perform small maintinance jobs
3 man crew with bucket to perform small maintinance jobs
3 man crew with backhoe to perform small maintinance jobs
Trenching 2 inch typical 48" depth
Installation of 2" PVC conduit in open trench
Boring 2" typical 48" depth
Boring (2) 2" typical 48" depth in same bore
Installation of 2" PVC conduit in bore
Trenching 4 inch typical 48" depth
Installation of 4" PVC conduit in open trench
Boring 4" typical 48" depth
Installation of 4" PVC conduit in bore
Emergency Services (minimum 4 hours) 1 man crew
Emergency Services (minimum 4 hours) 2 man crew
Emergency Services (minimum 4 hours) 3 man crew
Complete build out of Denton ITS Fiber Network Project Phase 1 per plans. Traffic supplying Enclosure and all supplies, not equipment
Complete build out of Denton ITS Fiber Network Project Phase 1 per plans. Contractor supplies all material per approved City Standards.
Respondent Company Name:
Principal Place of Business (City,ST)
City of Denton requested completion schedule
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
2 weeks notification of job
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
1 week notification of work
2HR Response
3HR Response
4HR Response
120 days
120 days
City of Denton Recommended installation time
2000 ft per day/ straight pull
2000 ft per day/ straight pull
24 per day
72 per day
72 per day
1hr
2hr
1 day
1 day
24 per day
72 per day
72 per day
1hr
2hr
1 day
1 day
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
200 ft per day / straight run
200 ft per day / straight run
200 ft per day / straight run
200 ft per day / straight run
200 ft per day / straight run
200 ft per day / straight run
200 ft per day / straight run
200 ft per day / straight run
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Supervisor Discretion
Cost of Service
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Estimated Annual Total Cost
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0