7014 - Trucking Services, 1.Pricing SheetExhibit 1
IFB 7014 Pricing Sheet for Trucking Services
The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format.
Services Proposal Pricing:
ITEM
1
2
Total Cost
Miscellaneous:
4
5
UOM
HOUR
HOUR
On average, how many Tandem Trucks will be available within the 24-hour response time?
On average, how many qualified drivers will be available within the 24-hour response time?
*NOTE: PLEASE EMAIL THIS EXHIBIT 1 AS AN EXCEL FILE TO EBIDS@CITYOFDENTON.COM
EST ANNUAL QTY
4500
200
Respondent's Business Name
Principal Place of Business (City and State)
Type of Service Requested
Price per hour to haul spoil materials, hot mix asphaltic concrete, concrete, gravel, wood chips, and other material, as required, for different operations throughout the contract period.
Per Hour, Per Tandem Dump Truck - 14 Yard
Per Hour, Per Tractor trailer end dump - 20 Plus Yard
City of Denton Required Response Time
24 hr response
24 hr response
Proposed Response (in hours) if can not meet required schedule:
Cost of Service per Hour or Load
$
$
G.total Cost of Service per hour or Load