7039 - Painting of Buildings and Process Tanks at PCWRP, 4.Drawings/ Plans1
16 17
15
18 14
2
4
4
5
6
7
8
13
9
10
20 21 19
11
12TREATMENT PLANT!I
PCWRP Process Units for Painting
Buildings sqft
Lab 6124
Pre Treatment 2048
Flow Split 5040
Primary Digester 11,314
Heat Exchanger 2964
Maintenance 3008
Sludge 3616
Belt Press 7560
DAF Building 4560
Turblex 3496
UV Structure 1780
UV Building 1728
GT Building 1620
North Return Old 1248
Raw 2 Entry 440
Raw 1 2484
Bar Screen Wall 2132
Operations Building 1378
South Return Building 1656
Green Pipe lg 3760
Green Side Pipe 3560
Total sqft 71516