7005 - Replacement of Resilient Sports Gym Floor at North Lakes Recreation Center, Addendum 2
Purchasing Department
901-B Texas St.
Denton, TX 76209
(940) 349-7100
www.dentonpurchasing.com
ADDENDUM #2
IFB # 7005
NORTH LAKES RECREATION CENTER GYM FLOOR
Issue Date: April 8, 2019
Response due Date and Time (Central Time):
Tuesday, April 9th, 11:00 A.M. C.S.T
IFB # 7005
ADDENDUM #2
Spec Section 09650 – Resilient Flooring Part 3 Execution, 3.1 Verify concrete floors are to a maximum moisture content of 7 percent. Please provide the current floor moisture content.
Answer: We will be getting the floors inspected and if the moisture is above a change order will be accepted after contract has been awarded.
In the event that current floor moisture content is below or above 7 percent. Please provide system installation to meet 7 percent.
Answer: See above. This will be addressed with awarded vendor. Please bid as is assuming floors are under the moisture content.
Is the Court Logo Owner Supply?
Answer: The contractor is responsible for the installation of logo. The spec and logo detail is included in both sheets 1 and 2 of the plans.
NO OTHER CHANGES AT THIS TIME.
Please acknowledge addendum on Attachment F of the main solicitation document when submitting a proposal.