7072 - Home Improvements to 111 Peach Street, 1.Pricing SheetExhibit 1 - Pricing Sheet
WorkWrite-Up and Bid Document/By Area
Allison & Taylor Kami
111 Peach Street Denton, TX 76209-1920
(940) 594-9444
Contractor Name:
Contractor Signature: This document must be signed to be a valid bid.
PROJECT TYPE: Rehabilitation
Bid Due Date: 2/18/2019
Area Work Description / Comments
Gen. Spec.
Qty Unit
Item Bid
..LPB INTERIM CONTROL S EXTERIOR
1
Div. # 18.54
.
218 LF
Exterior Trim/Stabilize & Paint. Stabilize and paint exterior trim containing lead-based paint. Use safe work practices and containment per General Specifications. Work shall also comply
with all requirements of Division 9.
Stabilize deteriorated paint entire soffit.
2 Div. # 18.54
.
500 SF
Exterior Wall/Stabilize & Paint. Stabilize and paint exterior wall containing lead-based paint. Use safe work practices and containment per General Specifications. Work shall also comply
with all requirements of Division 9.
Backyard-facing siding-clad wall. Stabilize deteriorated paint.
.DEMOL ITION INTERIOR
3 Div. # 2.A.
1 Ea
Demolish & Remove Per Demolition Plan. Demolish and remove to code legal dump. Work shall include repairs to all surfaces.
Per Demo Plan - Includes both 1/2 baths & shower room - keep window, laundry closet walls
ATTIC
4
Div. # 14
1229 SF
Insulation/Add to/Attic/R-38. Add insulation to bring to R38 in attic. Entire attic over air conditioned & heated spaces.
Verify Amount needed - estimate has R11 - bid to add to R38
5
Roof/Brace. Install collar ties.
Install on rafter pairs that are not collar-tied.
6
Div. # 6.I.
Div. # 6.I.
300 LF
150 LF
Roof/Brace. Install purlin bracing (2" x 4" flat against rafters with 2" x 6" nailed perpendicular to rafters-braced every 4' to load bearing wall.).
Replace existing under-sized and improperly braced purlins.
BATHROOM #1
7
Bathroom combo/hand towel bar/paper holder/towel bar/install new. pers plans & elevations
8
Div. # 10.E.
2.
Div. # 11.A
1 Ea
1 Ea
Bathtub/Pre-Fab/1 Piece/Install new 1 piece tub unit. Use Lasco 2603-2PRHW or written approved equal.
per plans & elevations
BATHROOM #1
9
Div. # 9.H
1 Ea
Ceramic Wall Tile/Install ceramic tile. Install new ceramic tile around tub or shower stall, including Durock/Greenrock/Hardi-backer. Owner shall select color and style. Ceramic tile
cost allowance $2.64 sf (tile only).
10 Div. # 16.C.
1 Ea
Commode/Dual-Flush/Replace existing commode with new commode. Work shall include new shutoff, supply line and wax ring. Examine condition of the flange and report if damaged.
11 Div. # 16.B.
2.
1 Ea
Door Opening/Widen/Interior/Widen interior door opening/Install new door/pre-hung. Work shall include new door, framing, lockset, and paint.
per plans & elevations
12 Div. # 11.A
1 Ea
Drain Lines & Venting/One-Bath Structure/PVC/Replace. Replace all drain lines (with PVC)
and venting in and under the structure to connection with all appliances and fixtures.
13 Div. # 9.D
38.9 SF
Drywall/Ceiling/Install new 1/2" drywall on ceiling/Finish completely. Work shall include tape, bed and texture to match existing surfaces.
Hall bath
14 Div. # 9.D
116.2 SF
Drywall/Wall/Install new 1/2" drywall on wall/Finish completely. Work shall include tape, bed and texture to match existing surfaces.
Hall bath
15
Faucet/Vanity/Install new vanity faucet, supply lines & shutoffs.
16
Div. # 11.A
Div. # 14
1 Ea
59.3 SF
Insulation/Add/Open Exterior Wall/R-13. Add R-13 insulation to exterior wall. Use R-
13/kraft faced batts.
exterior wall - to insulate wall and plumbing
17 Div. # 11.A
5.8 SF
Lavatory-Vanity Sinktop/Cultured Marble/Replace. Replace existing lavatory-vanity sinktop with new vanity sinktop (cultured marble). Match existing size.
18 Div. # 13
1 Ea
Light Fixture/Bathroom/2 Light/Install. Install new 2 Light/Globe, wall mounted light fixture with switch, cover plate and circuit wiring.
per plans & elevations - give owner choices
19 Div. # 13.D.
16
1 Ea
Light Fixture/Heat-Vent-Light/Install new bathroom light (100 watt), heater (1450 watt), vent fan (70 CFM) and switch. Fan shall be vented out of attic to code.
20 Div. # 10.E.
7.5 SF
Mirror/Beveled Glass/Replace. Replace mirror with new beveled glass mirror. Repair all surfaces to match existing.
consult with owner
21 Div. # 13.D.
6
1 Ea
Outlet/Interior/110 Duplex & Circuit. Install new 110 duplex outlet and circuit wiring. per plan
22 Div. # 11.A
1 Ea
Shower Faucet & Diverter/Single Lever/Install new bath/shower faucet with diverter. Work shall include installation of pre-fab access panel or removal and replacement of wall materials
on opposite wall to faucet.
per plans & elevations
23 Div. # 6.O
2.3 LF
Vanity Base Cabinet/Pre-Finished Oak. Replace existing vanity with new pre-finished oak vanity base cabinet.
verify size
24
Vinyl Plank Flooring/Replace existing floor covering with vinyl plank flooring. Provide several choices to homeownr.
25
Div. # 8.A
Div. # 6.O.2
38.9 SF
2 LF
Wall Hung Cabinets/Pre-Finished Oak. Install new wall hung cabinets (pre-finished oak). Per plans & Elevations
26 Div. # 8.G
1 Ea
Window/Replace/Vinyl with new Solid Vinyl window/single hung/ Krestmark Energy Star or written approved equal (U-value of .35 w/ SHGC of .25. Include frame, sill, sash, trim, hardware,
screen, repair/paint of interior/exterior surfaces.
from a combo window to two small windows for each bath
BATHROOM #2
27
Bathroom combo/hand towel bar/paper holder/towel bar/install new. MB bath - per plans & elevations
28
Div. # 10.E.
2.
Div. # 11.A
1 Ea
1 Ea
Bathtub/Pre-Fab/1 Piece/Install new 1 piece tub unit. Use Lasco 2603-2PRHW or written approved equal.
per plans & elevations
29 Div. # 9.H
1 Ea
Ceramic Wall Tile/Install ceramic tile. Install new ceramic tile around tub or shower stall, including Durock/Greenrock/Hardi-backer. Owner shall select color and style. Ceramic tile
cost allowance $2.64 sf (tile only).
30 Div. # 16.C.
1 Ea
Commode/Dual-Flush/Replace existing commode with new commode. Work shall include new shutoff, supply line and wax ring. Examine condition of the flange and report if damaged.
31 Div. # 16.B.
2.
1 Ea
Door Opening/Widen/Interior/Widen interior door opening/Install new door/pre-hung. Work shall include new door, framing, lockset, and paint.
per plans & elevations
32 Div. # 16.B.
2.
1 Ea
Doors/Interior/Remove. Remove door complete. Wall up opening. Drywall opening, tape, bed, & texture
Master Bath - per plans & elevations
33 Div. # 11.A
1 Ea
Drain Lines & Venting/One-Bath Structure/PVC/Replace. Replace all drain lines (with PVC)
and venting in and under the structure to connection with all appliances and fixtures.
34 Div. # 9.D
44.6 SF
Drywall/Ceiling/Install new 1/2" drywall on ceiling/Finish completely. Work shall include tape, bed and texture to match existing surfaces.
Master bath
35 Div. # 9.D
133.6 SF
Drywall/Wall/Install new 1/2" drywall on wall/Finish completely. Work shall include tape, bed and texture to match existing surfaces.
Master bath
36
Faucet/Vanity/Install new vanity faucet, supply lines & shutoffs.
Div. # 11.A
1 Ea
37 Div. # 14
68 SF
Insulation/Add/Open Exterior Wall/R-13. Add R-13 insulation to exterior wall. Use R-
13/kraft faced batts.
exterior wall - to insulate wall and plumbing
38 Div. # 11.A
4 SF
Lavatory-Vanity Sinktop/Cultured Marble/Replace. Replace existing lavatory-vanity sinktop with new vanity sinktop (cultured marble). Match existing size.
39 Div. # 13
1 Ea
Light Fixture/Bathroom/2 Light/Install. Install new 2 Light/Globe, wall mounted light fixture with switch, cover plate and circuit wiring.
per plans & elevations - give owner choices
40 Div. # 13.D.
16
1 Ea
Light Fixture/Heat-Vent-Light/Install new bathroom light (100 watt), heater (1450 watt), vent fan (70 CFM) and switch. Fan shall be vented out of attic to code.
41 Div. # 10.E.
7.5 SF
Mirror/Beveled Glass/Replace. Replace mirror with new beveled glass mirror. Repair all surfaces to match existing.
consult with owner
42 Div. # 13.D.
6
1 Ea
Outlet/Interior/110 Duplex & Circuit. Install new 110 duplex outlet and circuit wiring. per plan
43 Div. # 11.A
1 Ea
Shower Faucet & Diverter/Single Lever/Install new bath/shower faucet with diverter. Work shall include installation of pre-fab access panel or removal and replacement of wall materials
on opposite wall to faucet.
44 Div. # 6.O
3.3 LF
Vanity Base Cabinet/Pre-Finished Oak. Replace existing vanity with new pre-finished oak vanity base cabinet.
per plans & elevations - verify size
45
Vinyl Plank Flooring/Replace existing floor covering with vinyl plank flooring. Provide homeowner with several choices.
46
Div. # 8.A
Div. # 6.O.2
44.6 SF
2 LF
Wall Hung Cabinets/Pre-Finished Oak. Install new wall hung cabinets (pre-finished oak). per plans & elevations
47 Div. # 8.G
1 Ea
Window/Replace/Vinyl with new Solid Vinyl window/single hung/ Krestmark Energy Star or written approved equal (U-value of .35 w/ SHGC of .25. Include frame, sill, sash, trim, hardware,
screen, repair/paint of interior/exterior surfaces.
from one window to 2 small windows
BEDROOM #1
48 Div. # 6.Z.
9.76 LF
Closet Shelf & Clothes Rod/Wood. Install new wood closet shelf (1" x 12") and clothes rod. Work shall include bracing and paint (prime and two coats).
Redo closet per plans & elevations
49 Div. # 6.Z.
16 LF
Closet Shelf/Wood. Install new shelf. Work shall include bracing and paint (prime and two coats).
per plans & elevations
50 Div. # 8.A.
2 Ea
Replace Closet Bi-Fold Door, Jamb & Trim/Bi-fold/6-Panel/Replace bi-fold closet door with new bi-fold 6-Panel closet door, jamb & trim. Work shall include paint both sides.
verify color with owner
51 Div. # 8.A
1 Ea
Replace Passage Door, Jamb & Trim/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung 6-Panel. Work shall include paint both sides.
per plan
BEDROOM #2
52 Div. # 6.Z.
6.08 LF
Closet Shelf & Clothes Rod/Wood. Install new wood closet shelf (1" x 12") and clothes rod. Work shall include bracing and paint (prime and two coats).
redo closet per plans & elevations
53 Div. # 8.A.
1 Ea
Replace Closet Bi-Fold Door, Jamb & Trim/Bi-fold/6-Panel/Replace bi-fold closet door with new bi-fold 6-Panel closet door, jamb & trim. Work shall include paint both sides.
verify color with owner
54 Div. # 8.A
1 Ea
Replace Passage Door, Jamb & Trim/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung 6-Panel. Work shall include paint both sides.
per plan
BEDROOM #3
55 Div. # 8.A
1 Ea
Replace Passage Door, Jamb & Trim/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung 6-Panel. Work shall include paint both sides.
DINING ROOM #1
56 Div. # 6.Z.
9.3 SF
Food Pantry Closet. Add new food pantry closet/complete. Include door(s), shelves, sheetrock, TBT, Paint per plan
Per plans & elevations
EL ECTRICAL
57 Div. # 13.D.
1
1 Ea
Main Service/200 Amp/Replace. Replace existing main service with new 200 Amp main service with 18 branch breakers. Work shall include replacement of weatherhead.
Include moving electrical box to hallway from current location
58 Div. # 13.D.
1 Ea
Outlet/110v Single Receptacle & Circuit/20 Amp/Grounded/Install new. Install new 110v single receptacle outlet and cover plate.
for new tankless water heater
59 Div. # 13.D.
11
3 Ea
Smoke Detector/Hard Wired with Battery Back-Up/Install new smoke detector, hard wired with battery backup. All bedrooms and hallways adjacent to bedrooms. Use Firex #045186 or written
approved equal.
One in each bedroom
60 Div. # 13.D.
11
1 Ea
Smoke/Carbon Monoxide Detector & Circuit/Install. Install a new direct smoke/carbon monoxide detector & circuit wiring. Voice notification with battery back-up
in hallway
EXTERIOR
61 Div. # 8.F
1 Ea
Door Threshold & Weatherstripping/Exterior/Replace. Replace exterior door threshold and weatherstripping/aluminum w/vinyl sweep.
front door
62
Driveway/Concrete/Install. Install concrete driveway. Replace asphalt driveway
Div. # 3.L.
1140 SF
EXTERIOR
63
Div. # 9.N.4
1773.4 SF
Exterior Surfaces/Paint entire exterior/siding, trim, soffit and fascia/Two Coats. Include minor repairs to all surfaces. NOTE:SF=FLOOR AREA/BID TO PAINT ALL EXTERIOR SURFACES.
64
Light Fixture/Porch/Replace exterior porch light.
65
Div. # 13.D.
9
Div. # 11.A.
2 Ea
40 LF
Yard Line/Sewer/PVC. Replace sewer line in yard with PVC to include double cleanout. field verify
GARAGE
66 Div. # 8.A.
4 Ea
Door/Exterior/Steel/Pre-Hung/Replace. Replace exterior entrance door with new pre-hung- steel door. Work shall include paint-both sides, hinges and lockset.
replace storage doors
HAL L WAY #1
67 Div. # 8.A.
1 Ea
Closet Door, Jamb & Trim/Bi-fold/Replace. Replace bi-fold closet door with new bi-fold closet door, jamb & trim. Work shall include paint both sides.
per plans & elevations
HALLWAY #1
68
Div. # 6.Z.
13.33 LF
Closet Shelf/Wood. Install new shelf. Work shall include bracing and paint (prime and two coats).
per plans & elevations - By front door: include seperator between new shelves and clothes shelf/rod
HVAC
69 Div. # 12
1 Ea
HVAC Equipment/Central/Cooling & Gas Heating/3 1/2 TON/16 SEER/New. Install new HVAC. INSIDE & OUTSIDE EQUIPMENT/INCLUDING GAS FURNACE WITH MULTI- STAGE BLOWER, COPPER LINES, CONDENSOR
COILS, EVAP. COILS., COMPRESSOR & THERMOSTAT/PROGRAMABLE
HVAC subcontractor to perform Manual J calculation for proper size
HVAC Cl o s et
70 Div. # 8.A
1 Ea
Closet Door, Jamb & Trim//Pre-Hung/6-Panel/Replace door with new pre-hung 6-Panel. Work shall include paint both sides.
per plans & elevations
71 Div. # 8.A.
1 Ea
Closet Door, Jamb & trim/Pre-Hung/6-Panel. Install new pre-hung 6 panel closet door and lockset/complete with jamb & trim. Work shall include paint both sides.
per plans & elevations - air tight
HVAC Cl os et
72
Div. # 8.A
1 Ea
Door/Frame new & Install/Frame for new door/Install new header, king & jack studs/Install new pre-hung door (6-panel), complete with trim and lockset/Paint both sides
per plans - in hallway - air-tight door
73 Div. # 16.B.
2.
1 Ea
Doors/Interior/Remove. Remove door complete. Wall up opening. Drywall opening, tape, bed, & texture
HVAC Closet - per plans & elevaitons - wall up one side of bifold door
L AUNDRY ROOM
74
Ceramic Floor Tile/Replace ceramic floor tile. Match existing. due to wall being removed
75
Div. # 9.E
Div. # 8.A.
8 SF
1 Ea
Closet Door, Jamb & trim/Bi-Fold/6-Panel. Install new bi-fold closet door/complete with jamb
& trim. Work shall include paint both sides.
per plans & elevations
76 Div. # 9.D
65.8 SF
Drywall/Wall/Install new 1/2" drywall on wall/Finish completely. Work shall include tape, bed and texture to match existing surfaces.
per plans & elevations
LAUNDRY ROOM
77
Div. # 6.C.
7.9 LF
Interior Wall/Partition/2"x 4"x 8'/Replace. Replace 2" x 4" x 8' interior partition wall/ 16" O.C. (framing only).
Per plans & elevations to deepen closet - increase laundry closet interior depth to 3 ft 2 in deep
78 Div. # 6.O.2
1 Ea
Utility Cabinet/Install prefinished pantry/Use Mill's Pride "York" (or sized as called out in comments if different)
Per plans & elevations / broom w/ shelf on top - ensure that existing shelves have support and meet the cabinet side
79 Div. # 13.D.
16
1 Ea
Vent/Install new vent fan (70 CFM) and switch. Fan shall be vented out of attic to code.
80
Vent/Install/Dryer. Install new louvered dryer vent with ducting. in laundry room
PL UMBING
81
Gas Line/Pressure Test. Pressure test gas line
Div. # 10.D.
2.D.
Div. # 11.A
1 Ea
1 Ea
PL UMBING
82
Div. # 8.A
1 Ea
Water heater/Tankless/Gas/Install. Replace existing gas water heater with new tankless water heater. Rinnai Model RL.
per plans. Increase gas branch size as required by specifications.
PROFESSIONAL SERVICES
83
Electrical Permit
84
Mechanical Permit
85
Pests/Treat Structure. Treat structure for pests.
86
Plumbing Permit
87
Div. # 1C Div. # 1C Div. # 2.Q Div. # 1C
Div. # 1C
1 Ea
1 Ea
1194 SF
1 Ea
1229 SF
Residential Alteration Permit Fee Rehab. 14 cents per SF, plus $60 Plan Review. (Check with Building Inspections for updates).
88 Div. # 2.Q
1 Ea
Termite Inspection. Inspect structure for wood destroying insects & pests. Use state licensed inspector.
ROOM ADDITION
ROOM ADDITION
89
Div. # 8.A
1 Ea
Closet Door/Frame new & Install/Frame for new closet door/Install new header, king & jack studs/Install new pre-hung door (6-panel), complete with trim and lockset/Paint both sides
per plans & elevations
90 Div. # 16.B.
2.
1 Ea
Doors/Interior/Remove. Remove door complete. Wall up opening. Drywall opening, tape, bed, & texture
MB Closet - door to closet is moving per plans & elevations
ROOM ADDITION Bed r o o m
91 Div. # 6.DD.
37.5 SF
.Room Addition/Add. Add new room addition. See General Specifications Manual. Includes foundation, roof framing, roofing, wall framing system. Complete.
build new closet per plans & elevations
92 Div. # 9.M
4 SY
Carpet & Pad/Level Loop/26 oz./Install new carpet (26 oz., level loop)and pad (15 oz.). Match existing.
in new addition of closet
93 Div. # 6.Z.
9.5 LF
Closet Shelf. Install new wood closet shelf (1" x 12") and clothes rod. Work shall include bracing and paint (prime and two coats).
Master Bedroom Closet - Per plans & elevations
ROOM ADDITION Bed r o om
94
Closet Shelf/Wood. Install new closet shelf/ 1"
Div. # 6.Z.
45.7 LF
MB closet - shelves directly across clothes rod/shelf will be for heavy instruments - ensure shelves are reinforced for the extra weight
95 Div. # 14
123.5 SF
Insulation/Add/Open Exterior Wall/R-13. Add R-13 insulation to exterior wall. Use R-
13/kraft faced batts.
Master bedroom closet - New exterior walls
96 Div. # 13.D.
9
1 Ea
Light Fixture, Switch & Circuit/Room/Install new flush mount ceiling light fixture, switch, cover plate and circuit. Globed standard fixture.
New Bedroom light per plans & elevations - remove existing
97 Div. # 6.EE.
37.5 SF
Room Addition/Roof Framing & Ceiling Joist System. Work shall include ceiling joists, finished drywall on ceiling, rafters, bracing, collar ties, band board for fascia and ridge 2" wider
than rafters. SF=Floor Area.
All construction shall be in accordance with local codes, manufacturers' recommended installation procedures, good quality workmanship practices, General Specifications and Lead- Based
Paint requirements when applicable. Conflicts between requirements will be resolved
by compliance with the more stringent requirement. Contractor awarded the job will be responsible for conducting safe work practices that comply with OSHA Construction Standards for
Asbestos Workers. Asbestos report, where required, will be attached if areas tested are 1% or greater. See attached Asbestos Sampling Report for location and testing of Planned Work
Activities.
Total: